Instrumentation CALIFES ideal for tests and development that requires frequent access to test setup. CERN BI members already using CALIFES and want to.

Slides:



Advertisements
Similar presentations
SINBAD Ralph W. Aßmann Leading Scientist, DESY LAOLA Collaboration Meeting, Wismar
Advertisements

Tessa Charles Australian Synchrotron / Monash University 1 Bunch Compression Schemes for X-band FELs.
Erik Adli CLIC Workshop 2015, CERN, CH 1 Erik Adli Department of Physics, University of Oslo, Norway Input from: Steffen Doebert, Wilfried Farabolini,
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
1 Tunnel implementations (laser straight) Central Injector complex.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
FACET Update ARD Status Meeting Christine Clarke April 14 th 2011.
IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 111 Middle-Long Term Needs for Ion Beams S.Maury Thanks to T. Bohl, C. Carli, D.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Non-scaling FFAGs in UK EMMA Requirement for (at least) one non-scaling FFAG clear: - multi-resonance crossings - huge/tiny momentum compaction - asynchronous.
CLIC and High Gradient FEL Design D. Schulte for the CLIC collaboration and FEL friends D. Schulte, LSUM, Ankara, October
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
Tsinghua Collaboration Plan Jiaru Shi, CERN On behalf of Huaibi Chen, Tsinghua University, Beijing November Collaboration Meeting, CERN.
Erik Adli CLIC Project Meeting, CERN, CH 1 Erik Adli Department of Physics, University of Oslo, Norway Input from: Steffen Doebert, Wilfried Farabolini,
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Summary of XFEL uses for CALIFES Erik Adli (University of Oslo, Norway)
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
1 st TIARA Steering Committee A. Gallo – INFN Frascati deputy of TIARA WP8 leader STATUS OF TIARA WP8.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
Sub-Task HOM-BPM HOM based Beam Position Monitors – Planned and Extant Measurements N. Baboi, DESY, Hamburg EuCARD WP 10: SRF, Annual Review Meeting.
PhD Topics at Novel Accelerator Group of Manchester Guoxing Xia 27 th June 2016.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
AWAKE Run 2 : 1) Interstage considerations 2) CALIFES as plasma technology test facility Erik Adli and Carl A. Lindstrøm University of Oslo, Norway AWAKE.
Jayakar Thangaraj Fermilab Accelerator Advisory Committee November 7-9, 2011 PROTOPLASMA: Proton-driven wakefield experiment at Fermilab.
The Cockroft Institute
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
CALIFES A proposed electron beam test facility at CERN
CompactLight H2020 Design Study Proposal
The Engineering Test Facility for nLC
Dielectric Wakefield R&D programme at Daresbury Lab.
ICE SECTION The coolest place to be! Elias Métral
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
Status and Interest of the X-ray FEL SINAP
Accelerator Research and Innovation for European Science and Society
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Have a chance to operate your own beam at CERN
Tunable Electron Bunch Train Generation at Tsinghua University
Adriana Rossi, Sergey Sadovich
WP11: electron and proton beam testing
How to run ions in the future?
The Cornell High Brightness Injector
Cornell Injector Performance
Electron Source Configuration
LAL meeting on e+ studies, Oct. 2010
Andrei Seryi Materials for discussion TILC-08
Introduction / Comments on instrumentation issues
Advanced Research Electron Accelerator Laboratory
Two-bunch self-seeding for narrow-bandwidth hard x-ray FELs
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Status of CTC activities for the Damping rings
Dark current in TESLA linac
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
First meeting of the LIS section: Welcome to the new members!!
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Status of DESY-PSI-CERN collaboration on development of X-band TDS with variable polarisation: PolariX-TDS Alexej Grudiev on behalf of Polarix-TDS collaboration.
Presentation transcript:

Instrumentation CALIFES ideal for tests and development that requires frequent access to test setup. CERN BI members already using CALIFES and want to continue. Required for LHC ? cost of an R&D facility weighted against LHC beam time required to address instrumentation issues External collaborators (Oslo and RHUL) presented on-going R&D in CALIFES as well, with clear statement to continue tests beyond 2016. Instrumentation test stands already exist in CALIFES. Desire to continue several activities in 2017. This would be possible without significant facility modifications. Longer term upgrade wishes: * magnetic chicane (or dogleg?) for variable bunch compression and SR studies - specific requirements on bunch length? * in-air test area Time line 2017+ ?

Impedances Some types of impedances are challenging to estimate with either bench measurements or numerical simulations; wire scanner components is one example. CLIC structure wakefield mapping in FACET two-bunch experiments shows power of direct wakefield mapping. Whether CALIFES parameters, like bunch length and time structure, can be used for impedance measurements is application dependent. 2017: wire scanner Longer term upgrade wishes: * a second, independent, injector would allow direct measurement of wake fields for a much broader range of parameters Time line: concrete proposal for beyond 2017 and WS measurement?

RADIATION TESTS CALIFES : peak energy of 200 MeV is not available at other radiation test facilities. Interesting for the ESA Juice mission.. CALIFES: large intensity range. A radiation test facility, VESPER, is already in place. Desire to continue tests in VESPER beyond 2017. Beam parameters tunes to the required values: low current dark current beam, expanded to order cm2. General statement of interest from CERN/EP (no concrete proposals). 2017: Continue tests in VESPER Longer term, any hardware upgrade wishes: ? Time line / proposals beyond 2017?

Light source R&D X-band FEL collaboration ("Compact-Light") : H2020 proposal being prepared, would include a CALIFES part: X-band component testing (linearizers, deflectors). If funded, this project could be backbone of CALIFES X-band research. Interest for X-band FEL partners to CALIFES tests also if H2020 proposal is not funded? CLARA interesting in joining X-band tests (linearizers, deflectors) in order to prepare for an eventual X-band linac at CLARA and help take decision on UK FEL frequency. 2017 : desired to continue some X-band tests, incl. WFM (see next slide as well) 2018 -> : seems to be the realistic timeline for rerouting/moving XBOX (RF power for testing of X-band components) ? THz generation schemes : interest from PSI to follow up with CALIFES ?

High gradient research 2017: * Ongoing CLIC activites that can be done w/o X-band RF, including WFMs (not gone through here in detail) * Dosimetry experiments for electron radiotherapy, with 200 MeV (eve 2016) 2018 (requires X-band RF) : * Continue kick measurements, alignment studies and ion studies * Dog-leg: important for CLIC to continue, beam loading experiments X-band RF required

THz Two main topics/groups : 1) INFN: Generation, characterization and eventual science use of THz radiation 2017 : THz generation and some characterization can be done almost parasitically (foil in beam) 2018 -> : improved parameters (bunch length, charge). Experiments using THz for acceleration 2) Cockroft: Comprehensive Dielectric and THz experimental program. - 3-5 years - significant manpower contributions (staff, postdocs, PhDs, part time or even FULL time at CERN) - hardware contributions, including diagnostics useful for the facility as such - requires significant amount of beam time to be worthwhile (2-3 months / year?) Would be useful to have an idea, perhaps a concrete example of how the schedule and manpower for DATA@CALIFES, in the summary.

PWFA 2017: Discharge plasma source technology ready for beam from mid 2017. Will be first time this type of source will be tested with beam; important/high impact for plasma community and AWAKE. Space and integration requirements (vacuum leaks, vacuum requirements) required for a large plasma source in CALIFES? Plasma lens lattice tests ready for beam mid 2017. Experimental demonstration of achromatic interstage design. Cockroft: interested testing hardware as well 2018 -> : plasma source with experiments, including emittance growth. A second injector would make CALIFES a stronger program (no other facilities have two independent conventional electron guns).

EDUCATION AND TRAINING CALIFES ideal for education and training: - safe machine (students cannot to any damage) - complex enough to be interesting (large range of beam parameters) simple enough to learn to operate in a few days - easy access to machine and gallery Dedicated training days for targeted groups like JUAS possible and desired, for order of a week of beam time. For external groups coming to CALIFES for research, e.g. DATA: important that CALIFES preserves academic work environment where students are allowed to help in operation and learn in the process, without strict time pressure (training by doing). Training network idea: probably to close to hand in EU proposal for Jan 2017; need to establish science case first. However, would be great if the session leader could help outline ideas for a path towards an ITN in the summary.

Finally, I join in today's hommage from Restaurant 1 :