Why Micromegas? Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack.

Slides:



Advertisements
Similar presentations
Micro MEsh GASeous Detectors (MicroMegas)
Advertisements

sTGC for ATLAS Small Wheel upgrade
Status of the ATLAS MM project
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
Tracking at the ATLAS LVL2 Trigger Athens – HEP2003 Nikos Konstantinidis University College London.
PHENIX RPC in China Li Ye Shouyang Hu Xiaomei LI China Institute of Atomic Energy
The Progress of PHENIX RPC Production in China Shouyang HU Xiaomei LI Shouyang HU Xiaomei LI Science and Technology on Nuclear Data Laboratory China Institute.
NSW background studies Max Bellomo, Nektarios Benekos, Niels van Eldik, Andrew Haas, Peter Kluit, Jochen Meyer, Felix Rauscher 1.
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
Workshop 24 Jun 11 AB Workshop on GEMs for CMS high  Last September’s workshop showed that MPGD technology is now mature. Stable operation of large area.
Trigger processor John Huth Harvard. NSW + TGC of BW’s track fitting track position (R,  ) d  : deviation of incidence angle from infinite pT muons.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Resistive ….. I.Laktineh IPN-Lyon. Motivation Calorimeters are expected to play an important role in future experiments (ILC, CLIC…) based on PFA concepts.
LHCb VErtex LOcator & Displaced Vertex Trigger
M. Bianco On behalf of the ATLAS Collaboration
G. Volpi - INFN Frascati ANIMMA Search for rare SM or predicted BSM processes push the colliders intensity to new frontiers Rare processes are overwhelmed.
T. Kawamoto1 Recommendation for the New Small Wheel layout T. Kawamoto (NSW i-project leader), J. Dubbert (NSW i-technical coordinator), L. Pontecorvo.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
ATLAS micromegas activities (MAMMA)
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
Gas flow studies on MicroMeGaS Detectors for the NSW Upgrade Stathis K. Karentzos National Technical University of Athens, NTUA HEP 2014 – Conference on.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
RPCs with Ar-CO2 mix G. Aielli; R.Cardarelli; A. Zerbini For the ATLAS ROMA2 group.
L. Pontecorvo1 The Muon New Small Wheels INFN CSN L. Pontecorvo.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
ATLAS muon chamber upgrade Within the MAMMA collaboration Arizona, Athens(U, NTU, Demokritos), Brookhaven, CERN, Harvard, Istanbul, Naples, CEA Saclay,
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
The timing upgrade project of the TOTEM Roman Pot detectors
The principle of operation of a micromegas chamber
S.Movchan Straw prototype beam test into the NA48 infrastructure
Results achieved so far to improve the RPC rate capability
Atlas: Upgrade Phase I Massimo Della Pietra.
Laser calibration systems
Start Detector for pion experiments
ATLAS-MUON Trigger hardware developments
CMS muon detectors and muon system performance
Micromegas for the ATLAS Muon System Upgrade
Optical data transmission for
for the transition region on behalf of the RPC upgrade group
Barrel RPC Conditions Database
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
ATLAS Muon Spectrometer and
RPC and LST at High Luminosity
Performance of a Multigap RPC prototype for the LHCb Muon System
Pre-installation Tests of the LHCb Muon Chambers
(On Behalf of CMS Muon Group)
SVT detector electronics
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Why Micromegas? Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack

In short Single device for trigger, precision & 2nd coordinate Best performance Simplest and most elegant trigger scheme Safest for high rates Most ‘friendly’ operating parameters (gas, HV) Easiest to build, commission, install, and maintain Lowest costs for production, operation, and maintenance Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack

Performance Best space resolution Only detector(of those proposed) that achieves a double track resolution of O(mm) Finest granularity, therefore superior track reconstruction Track vectors in single plane, a very powerful tool for pattern recognition and track reconstruction Lowest sensitivity to cavern background (1/3 x MDT), another factor in favour of MMs Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack

Trigger Trigger granularity is a single strip, i.e. 0.5 mm (out of 64 strips or 32 mm) Four strip addresses per chamber plane are transmitted to USA15 every bunch crossing (25 ns) Trigger decision by track matching algorithm in look-up table or FPGA Proposed scheme avoids processing on SW other than in front-end chip the trigger info is routed through the same fibre that is used for the data transmission to USA15 trigger processing electronics is accessible during running (in contrast, the TGC and RPC concepts need an on-chamber majority decision; electronics not accessible during a full year) Look-up memories or FPGAs can be reprogrammed if required Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack

Safe a high rates Far from critical rates, even at 15 kHz/cm2 Large safety margin if LHC luminosity would go up further or background rate increases MMs are still operating fine at MHz/cm2 and above (trigger concept would need to be adapted, e.g. more fibres/plane in high rate regions) No ageing observed in high-rate X-ray and neutron exposures (10-20 years of sLHC) Long-time behaviour of resistive strips needs to be demonstrated; same holds for RPCs and TGCs for resistive coatings Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack

Operation and maintenance MMs require only half of the services that are needed by the other proposals No on-chamber trigger processing electronics Most ‘friendly’ operating parameters Low HV (500 V) Inert and cheap gas, Ar:CO2 (93:7), at atmospheric pressure Lowest costs for operation and maintenance Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack

Construction & commissioning Industrial production of MMs (employing commercial equipment) using PCB technology Assembly, commissioning, and testing in/by collaborating institutes. Simple mechanics & assembly No glueing of components, easy opening and replacement of detectors if required Most cost effective of the three proposals half the number of chambers, half of the electronics half of the manpower and infrastructure for testing and commissioning Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack

In conclusion Single device for trigger, precision & 2nd coordinate Best performance Simplest and most elegant trigger scheme Safest for high rates Most ‘friendly’ operating parameters (gas, HV) Easiest to build, commission, install, and maintain Lowest costs Why would one not choose micromegas ??? Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack