Tuesday 11th September LHCb dipole presently fault off

Slides:



Advertisements
Similar presentations
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Advertisements

17/09/2012LHC 8:30 meeting LHC Summary Week 37 Coordination: Jorg Wenninger & Jan Uythoven.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Wednesday 3rd October - morning
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Summary of week 7 Hardware Commissioning:
James Ridewood BE-OP-SPS
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Monday morning 08:30 Start of rephasing MD. Dry tests in the morning.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Tuesday 22nd January - morning
Monday 6th August & night
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Thursday morning 09:30 Dump of pPb fill.
Lost at 12:05 to power converter (RTQX2.R1) problem
Bernhard Holzer, Joerg Wenninger
Coordination by E. B. Holzer & J. Wenninger Production
LHC Morning Meeting - G. Arduini
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
Wednesday 8th August & night
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Tuesday 20 March 2012.
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Thursday :00: Physics fill from the night shift
Wire almost entirely through beam before BLM triggers dump
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
MSWG Report – SPS OP Crew
Monday – Morning Fill 3265 stable beams since 1:31
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
LHC Morning Meeting - G. Arduini
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Monday 3rd September - morning
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Programme for Friday 9 July
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
LHC Morning Meeting - G. Arduini
LHC - Week 38 Technical stop: Katy Foraz
Week 25 Summary Coordinators: Mike Lamont and Barbara Holzer
Wednesday 23/2 Thanks CRYO!!!.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Monday 27th August & night
Wednesday morning / afternoon
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Thursday 10:00 Fill 1986 in stable beams.
Tuesday
Presentation transcript:

Tuesday 11th September LHCb dipole presently fault off Vacuum intervention Point 4 following leak wire scanner beam1 Bake-out of pumping group during the day Removal of wire scanner early evening Pumping over-night, opening of valves early morning VIP visit IP2 Test of different beam modes and state machines for experiments Access: ATLAS, LHCb RD1.LR5 for quench MD preparation Removal of bake-out jackets two MKI tanks IP2 LBDS pulsing in local BI for head-tail monitor RF investigations of SPS re-phasing FESA class problems with (p, Pb) TI8 extraction tests for MKE stability tests with INDIV beam LHCb dipole presently fault off 12/09/2012 LHC 8:30 meeting

Wire Scanner – Bernd Dehning & BI team the scanner is dismounted and a closing flange is mounted the wire has been recuperated for analysis the resistivity of all b1 scanners have been measured before and after the opening of the vacuum, integrity check the number of the scans of all LHC scanners see below the broken scanner has had 10000 we are intending to switch all scanners tomorrow morning to the spare scanner, which are less often used the scanner mechanics is in the radioactive equipment storage to be released by RP LHC.BWS.5L4.B2H1:NB_PTS_SCAN_IN----3768 LHC.BWS.5L4.B2H2:NB_PTS_SCAN_IN----8124 LHC.BWS.5L4.B2V1:NB_PTS_SCAN_IN----3541 LHC.BWS.5L4.B2V2:NB_PTS_SCAN_IN----6690 LHC.BWS.5R4.B1H1:NB_PTS_SCAN_IN-----781 LHC.BWS.5R4.B1H2:NB_PTS_SCAN_IN---10247 LHC.BWS.5R4.B1V1:NB_PTS_SCAN_IN-----651 LHC.BWS.5R4.B1V2:NB_PTS_SCAN_IN----9468  12/09/2012 LHC 8:30 meeting

Vacuum status 12/09/2012 LHC 8:30 meeting

The Plan Wednesday, today Thursday Friday 08:30 Vac back in to Point 4 for final checks and equipment removal. Expect to be back in business towards the end of the morning When vac is out, RF tests with higher HV on the klystrons for about 1 h (parallel to pre-cycle) pPb pilot run – 13 bunches each beam (max 24 h) Thursday 1000 m beta*, few bunches (max 24 h) Friday AM: pPb MD with 318 p+ bunches w. 4 Pb bunches (1 shift) Test ramp, reversed LHCb polarity and split collision beam process SPS switched over to Q20 optics Physics 12/09/2012 LHC 8:30 meeting