Internal review of the 11T dipole reaction fixture and impregnation mould Outcome of the meeting F. Savary 19 October 2016 - CERN.

Slides:



Advertisements
Similar presentations
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev May 7, 2007.
Advertisements

LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
TOOLING. WHAT IS REQUIRED OF THE TOOL? support weight of the part support weight of the part maintain structural integrity and dimensional stability following.
Mikko Karppinen Nb3Sn Coil Production for 11 T Dipole Model Magnets.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
Raúl Morón Ballester TE-MSC-LMF
DS 11T Coil #110 – impregnation results CERN, Prevessin B Author / al.
COIL WINDING ISSUES P. Fabbricatore INFN Genova LCD - Magnet 13Oct09 1 Coil winding issues Based on experience acquired with CMS coil construction,
Muons, Inc. AAC Feb. 4, 2009 V. Kashikhin 1 Fermilab AAC  V. Kashikhin for Superconducting Magnet Team Superconducting Helical Solenoids.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
Design and Plans for Introducing Flexible End Parts Steve Krave 15 October 2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Carbon-Epoxy Composite Base Plates for the PHOBOS Spectrometer Arms J.Michalowski, M.Stodulski The H.Niewodniczanski Institute of Nuclear Physics, Krakow.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot, X. Sarasola
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
The construction of the model of the curved fast ramped superconducting dipole for FAIR SIS300 synchrotron P.Fabbricatore INFN-Genova The construction.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O. Pincot, X. Sarasola
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
VXD Mechanical R&D at the University of Washington H. Lubatti, C. Daly, W. Kuykendall LCRD in conjunction with Fermilab, SLAC.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
C.KotnigFCC Design Meeting FCC Beam Screen cooling Claudio Kotnig.
LARP Collaboration Meeting Racetrack Coil Fabrication
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
Modification of the 11T Dipole impregnation mould Impact on impregnation parameters Remy Gauthier,
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
D. Arbelaez for the LBNL LCLS SCU team Mar. 3,
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
1 LHC Hi-Lumi QXF Proposal for Coil Impregnation M. Anerella, J. Schmalzle, P. Kovach June 11, 2015.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Coil Design and Fabrication
Model magnet test results at FNAL
11 T Dipole Integration & Plans M. Karppinen
HQ Mirror Assembly R. Bossert
Overview – Nb3Sn Furnace
Ladder Assembly All tools and jigs produced Glue dispensing works
Challenges of vacuum chambers with adjustable gap for SC undulators
Superconducting Helical Solenoids
FCC 16 T dipole 4578 dipoles + 5 % spares : 4807 dipole magnets
Reaction fixture: What is working and not working
11 T dipole coil features and dimensions
HB RM prototypes Ianos Schmidt Aug 17, 2017.
DS11 T Transfer function, integral field and coil length
Mechanical stability and QXF coil winding
MBHSP02 test STATUS and first results
Testing and installation of prototype diode insulation system in MB2950 Florian Meuter, 3rd Meeting on Diode Consolidation during LS2,
Analytical Cost Model (16 T dipole)
WG4 – Progress report R. Santoro and A. Tauro.
MQXF updates P. Ferracin October 9th, 2014.
MQXF quench heaters: tests and investigation (CERN)¶
Coil Fabrication Status
Presentation transcript:

Internal review of the 11T dipole reaction fixture and impregnation mould Outcome of the meeting F. Savary 19 October 2016 - CERN

Schedule X-Section 1 – October 2016 End March 2017 Beginning October 2017 Internal review of 11T reaction fixture and impregnation mould

What we know about the coil size All size, loading plate angle, outer radius, and azimuthal excess, vary from one coil to another even for coils which are nominally identical, and impregnated in the same mold All size of a given coil vary along the straight part, also in the ends to a lower extent The reason for the coil size variations is not known. Additional measurements (metrology, E-modulus on full X-section), and characterization of the cable insulation system, are needed to ‘hopefully’ understand the cause of these variations Tolerances are proposed. At the moment, the tolerances on the outer radius and azimuthal excess are not linked Not all the coils meet the proposed tolerances. However, such deviations do not seem to impact on the quench performance Internal review of 11T reaction fixture and impregnation mould

Reaction 1 Reaction oven is ok. However, we need to integrate filters and replace the original oxygen sensors A15E . This is on-going work. ZrO2 solid electrolyte sensor (Metrotec) is now available, and can be used prior to launching the heating cycle (can be used only for clean Ar) Ar flow in the retort can be improved (and will be) Design of reaction fixture largely based on the FNAL concept Radial size of the reaction fixture larger than radial size of the impregnation mold by 0.1 mm. This is to allow relative movement of the coil w.r.t. the fixture during temperature ramp-up and cool-down, and Nb3Sn compound formation Radius of the form blocks = 62.25 mm Radius of the coil = 60.6 mm + a layer of 0.25 mm Mica + a layer of 0.5 mm and one of 0.3 mm for the Ar grids + 0.5 mm seal foil, giving a total of 62.15 mm Easier to close the fixture, than closing the impregnation mold The fixture is not leak tight, and this is not a requirement Place holders for the VAMAS samples shall be integrated, like in the QXF fixture, both at inlet and outlet Internal review of 11T reaction fixture and impregnation mould

Reaction 2 The Ar grids put on the outer surface of the coil do not seem to work as expected (provide radial venting for Ar flow and coil degassing residues). However, they do not affect the functionality of the fixture Cooling traps are congested by a large amount of agglomerate coming from the degassing residues (glass fiber sizing, silicon, ceramic binder), both from the fixture and from the retort (the latter likely coming from the leaking fixture) Although residues are collected in the cooling traps, there is probably still a lot in the coil The last three points advocate for an ‘open’ mold allowing more effective venting/cleaning of the coil. Then, one needs to make sure all the residues can be collected in the cooling traps (large ones, or several in parallel … with filtering) Temperature sensors type K will be replaced for type N. The calibration of the T sensors is done according to standards Almost 2 days are needed to reach the first temperature plateau. A lighter fixture would help (and/or more conductive) The length of the coil does not change after the reaction process. However, there is a visible change after curing: the coils get shorter when they are detached from the mandrel Internal review of 11T reaction fixture and impregnation mould

Impregnation 1 The total duration of the process is 110 hours, excluding cleaning. This translates into about 10 working days, of which 2.67 days of round-the-clock process: (1) vacuum drying (48 hours) and (2) post cure (16 hours). Then, additional 28 hours are needed for cleaning Assuming that we have 2 resin injection systems, we can hope for a 2-week occupancy of the machine per coil Transferring the coil from the reaction to the impregnation mold is very delicate, as the coil tends to relax and expand when the form blocks are removed (it is like a loaded spring or accordion). Unfortunately, we cannot avoid having the coil entirely uncovered, e.g. traces and sealing foils need to be installed. This does not happen on short coils The mounting and precise positioning of the loading plates is difficult The mounting of the form blocks is difficult in the strait part, it is okay in the ends (over about 500 mm) The closure of the mold is difficult in the case of the long coils, the sealing foil is not perfectly straight and it tends to move/rotate during the mounting of the form blocks. This is a major issue There are many bolts, about 150, maybe tedious but not a major issue … are we sure we can close the mold parallel? Internal review of 11T reaction fixture and impregnation mould

Impregnation 2 Radius of the form blocks = 61.44 mm Radius of the coil = 60.6 mm + QH 0.1 mm + glass fiber wrap 0.1 mm + sealing foil 0.5 mm (0.54 mm if coated, 0.61 mm if Teflon film), giving a total of 61.34 mm (coated) or 61.41 mm (Teflon film) There are differences between the model and long magnets as regards to utilization of coating or Teflon film on the surfaces in contact with the coil, e.g. Teflon coating is used on the mandrel in 927 The design of the end caps used for the short coils is better The circumference of the seal foil is excessive in the tooling for the long coils, it is smaller (better) for the short coils Protection strips made of ceramic are used during the splicing to reduce heat loss towards the heavy base plate Laser cutting of glass fiber fabrics has a lot improved quality and handling of these parts Loading plates are shot blasted on the side of the coil to ensure good adhesion through resin Internal review of 11T reaction fixture and impregnation mould

Use aluminum rather than stainless steel (impregnation mold) Preliminary ideas Use aluminum rather than stainless steel (impregnation mold) Use thicker sealing foils for impregnation Provide larger venting in reaction fixture … Internal review of 11T reaction fixture and impregnation mould