ILIAS WP3 activities report and ET organization

Slides:



Advertisements
Similar presentations
Michele Punturo on behalf of the ET team GA # A short introduction to the project.
Advertisements

Michele Punturo European Gravitational Observatory and INFN-Perugia On behalf of the GW ILIAS-next community Gravitational Wave Network.
 ET is a “design study” supported by the European Commission under the Framework Programme 7 (FP7)  It is a ~3 years project supported by EC with about.
The quest for gravitational waves. European Gravitational Observatory EGO “Raison d'être”, origin, structure & future perspectives Federico Ferrini –
FP7 Design study proposal Michele Punturo Harald Lueck.
VIRGO: WHERE WE COME FROM WHERE WE ARE GOING GIOVANNI LOSURDO - INFN Firenze Advanced Virgo Project Leader for the Virgo Collaboration (and the LIGO Scientific.
Harald Lück, AEI Hannover 1 GWADW- May, 10-15, 2009 EU contract #
1 st Feedback from the Gravitational-waves working group Harald Lück Valencia, November 2006.
Palma de Mallorca, October 24th, ILIAS-GWA: The GW antenna network Raffaele Flaminio EGO and LAPP/CNRS Summary - History - GWA Objectives & Contents.
Towards a Design Study Proposal for a 3rd Generation Interferometric Gravitational- wave Detector Harald Lück London, October 26th 2006.
N5 – WP1: Status and perspectives G.Losurdo – INFN Firenze/Urbino H.Grote – AEI Hannover.
Tubingen, October 9th, Status of the ILIAS-GWA network Raffaele Flaminio EGO and LAPP/CNRS Summary - Introduction - Objectives, Contents & Tools.
Past Present Future. European Gravitational Observatory EGO “Raison d'être”, origin, structure & future perspectives Federico Ferrini – EGO Director.
FP7 and ILIAS-NEXT Geppo Cagnoli INFN Sez. Firenze University of Glasgow 3 rd ILIAS GW Meeting – 26 th Oct. 2006, ICL.
The Preparatory Phase Proposal a first draft to be discussed.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Summary and Plans for the WG3 activity H.Lück, M.Punturo.
London, October 26th, Status of the ILIAS-GWA network Raffaele Flaminio EGO and LAPP/CNRS Summary - Objectives & Contents - Means - Last year activities.
Paris, November 5th, ILIAS/N5: The GW antenna network Raffaele Flaminio EGO and LAPP/CNRS Summary - History - GWA Objectives & Contents - Management.
E.T. Design Study Harald Lück. 3 main noise sources Thermal Noise Seismic Shot Noise.
E.T. Design Study & European roadmaps Michele Punturo/Harald Lück.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
Status of Virgo A. Viceré INFN-Firenze – Università di Urbino.
Summary and plans for the WG1 activity H.Grote – AEI Hannover G.Losurdo – INFN Firenze/Urbino Explorer Nautilus Virgo.
January 12, 2006ILIAS-WG3 Frascati1 Virgo+ & Advanced Virgo B. Mours With material from G. Losurdo, M. Punturo, A. Viceré and others.
1 ASTRONET Coordinating strategic planning for European Astronomy.
WG3 Report Michele Punturo Harald Lück. WG3 composition Co-Chairmen M.Punturo INFN Perugia, Italy H.Lück MPI für Gravitationsphysik, AEI, Hannover, Germany.
Fundamental Physics, Astrophysics and Cosmology with ET p1 Michele Punturo on behalf of the ET team GA # A short introduction to the project.
International Gravitational Wave Network 11/9/2008 Building an Stefan Ballmer, for the LIGO / VIRGO Scientific Collaboration LIGO G
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
G Z The LIGO gravitational wave detector consists of two observatories »LIGO Hanford Observatory – 2 interferometers (4 km long arms and 2 km.
Advanced Towards Advanced Virgo Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator on behalf of the Virgo Collaboration.
Michele Punturo INFN Perugia and EGO 11st ELiTES meeting.
ELiTES 1 st General Meeting Tokyo, October 2012 Federico Ferrini – EGO Director Thanks to the European Union Delegation.
The quest for gravitational waves. 2 The Universe has been studied essentially through EM radiation. GWs have a different origin. The Scientific Motivation.
Michele Punturo INFN Perugia and EGO 1 3rd ET annual workshop - Budapest 23-24/11/2010.
Toward ET ? Michele Punturo INFN and EGO 1ET: EU framework.
Gravitational Wave Physics Programme: - new initiative - Group composition (current): 3 staff, 0 postdoc, 2 PhD Investment Budget: under discussion Jo.
GWADW Elba Setting the stage GWADW2011, La Biodola Francesco Fidecaro Pisa.
Harald Lück AEI Hannover. Thank you Science Team! You did a great job!
ELiTES 4 th General Meeting Michele Punturo EGO and INFN.
Michele Punturo EGO & INFN Perugia 1 2nd ET meeting, Erice Oct'09.
THE NEXT GENERATIONS OF GRAVITATIONAL WAVE DETECTORS (*) Giovanni Losurdo INFN Firenze – Virgo collaboration (*) GROUND BASED, INTERFEROMETRIC.
Gravitational waves group status H.J. Bulten 1 H.J. Bulten - Nikhef Annual meeting, Dec. 15, 2009.
Michele Punturo INFN Perugia and EGO 1MGR13- ET.
Lessons to be learned from the ET design study Michele Punturo INFN Perugia ET-0005A-16 Dawn Meeting
Fulvio Ricci Cascina, November, 24th 2008
The Quest for Gravitational Waves: a global strategy
AMICI WP1 – Management, coordination and dissemination
European Network for Novel Accelerators (EuroNNAc2): WP7
Current and future ground-based gravitational-wave detectors
GW Policy: The Future: G3 Detectors
EGO The Infrastructure for Gravitational Wave Research in Europe
THE NEXT GENERATION OF GRAVITATIONAL WAVE DETECTORS
Commission II meeting – 7 March 2009
Is there a future for LIGO underground?
Status of Virgo GWDAW Dec 13-16
Signal recycling R&D at LAL: Influence in Virgo
CERN LVC workshop roundtable (what’s coming next?)
ELiTES The European-Japanese collaboration in Gravitational Wave research Dr. Michele Punturo Istituto Nazionale di Fisica Nucleare (INFN) European Gravitational.
ESF workshop in Perugia “Toward a 3rd generation European Gravitational Wave Observatory” Perugia September 2005.
SKADS Controller’s Meeting Timeline Annual Financial Report
WP4 Positioning European Astroparticle Physics in the world-wide context WP leader CNRS Partners: FOM, IFIN-HH, FRS-FNRS/FWO, FCT Total work: 22 months.
AMICI WP1 – Management, coordination and dissemination
WG3 Activities M.Punturo & H.Lueck WG3 - 4th ILIAS GW meeting.
ASTRONET Coordinating strategic planning for European Astronomy
The views of Virgo collaboration groups on upgraded/advanced Virgo
Discussion of GWIC 3G Report: acceptance and follow-up actions
Presentation transcript:

ILIAS WP3 activities report and ET organization Harald Lück

From 2004 to 2008 WG3 activities changed from technical issues and planning of 1.5 and 2nd generation detectors… … to ideas and plans for a 3rd generation observatory Main effort in the last year: ET Design study preparations

WG3: A European Strategy for Future Antennas Transparency from 2005 (R. Flaminio) Objectives and Delivearbles - Determine objectives attainable trough short-term improvements Draft a plan for an European network of GW detectors at the 2010 horizon - Short term plan after 18 months Long term plan: ‘White book’ defining the GW community objectives over 10 years period   YEAR 1 YEAR 2 YEAR3 YEAR 4 YEAR 5 Tasks and Deliverables Q1 Q2 Q3 Q4 WP 3: A European strategy for future antennas Tasks: Working group and WEB site set-up Elaboration of short term improvement plan Presentation of short term plan to institutions Elaboration of ‘White book’ Presentation of ‘White book’ to institutions Writing of final report Deliverables: Annual Report WG chaired by H. Lueck (MPI Hannover) and M.Punturo (INFN Perugia) Palma de Mallorca, October 24th, 2005

‚white book‘ -> ASPERA roadmap (Sept. 2007) Permanent and postdocs Construction and analysis No distinction between engineers and physicists Only the agents belonging to ASPERA or affiliated to it. running experiments’ operation personnel included PHDs excluded! This causes a non negligible error in estimating the financial impact. Investment (R&D+ Construction + Commissioning +Operation costs) No labour included, unless it is externalised labour (eg hire people to excavate a large cavity, prepare a large series of detectors etc) Mostly money demanded from the agencies affiliated to ASPERA or EU LISA not included E.T. construction largely external costs

Meetings 2004 2006 Date Meeting Title / Workshop Subject Location 08/07/04 – 09/07/04 WP3 meeting Virgo Site (Cascina, Italy) 21/10/04 – 22/10/04 Hannover 27/01/05 – 28/01/05 Legnaro Date Meeting Title / Workshop Subject Location 27/04/06 - 28/04/06 WP3 meeting Florence (Italy) 06/10/06 - 07/10/06 Thermal noise meeting Virgo Site (Cascina, Italy) 08/02/07 Design Study proposal Paris (LKB) 23/02/07 DS proposal (NIKHEF) Phone Conferences 15/02/07 Phone-conference 2005 Date Meeting Title / Workshop Subject Location 08/07/04 – 09/07/04 WP3 meeting Virgo Site (Cascina, Italy) 21/10/04 – 22/10/04 Hannover 27/01/05 – 28/01/05 Legnaro 2008 2007 Date Meeting Title / Workshop Subject Location 05/05/08 - 09/05/08 EGO – VESF training school Cascina, Virgo/EGO site (Italy) 12/05/08 - 18/05/08 GWADW 2008 – VESF meeting Isola d’ Elba 08/07/08 WP3 meeting APC Paris Phone Conferences 25/01/08 15/02/08 29/02/08 07/07/08 11/07/08 22/07/08 29/07/08 21/08/08 27/08/08 09/09/08 16/09/08 06/10/08 13/10/08 22/10/08 10/11/08 21/11/08 ET Telecon MC ITN Telecon Phone-conference Date Meeting Title / Workshop Subject Location 02/04/07 - 03/04/07 ET DS meeting and first Virgo+ review meeting Cascina, Virgo/EGO site (Italy) 16/10/07 - 17/10/07 2nd Virgo+ review meeting 09/01/08 - 10/01/08 Virgo+ EGO review 28/01/08 - 30/01/08 Advanced Virgo session, Virgo week Phone Conferences 13/04/07 18/04/07 19/04/07 20/04/07 23/04/07 26/04/07 02/05/07 09/05/07 07/06/07 24/08/07 31/08/07 Strategy definition: ET proposal Phone-conference

GraWiToN proposal Initial Training Network under the Marie Curie actions Training of young scientists on GW theory and experiments Submitted in Sept08 It involves: France, Italy, Germany, UK, Poland and Spain 3M€ overall “typical” budget, 300k€ could be for EGO Past the threshold but negligible chances of funding STAC Nov2008

First call for proposals closing in spring 2007 Transparency from early 2007 For design studies, preparatory phase, and support actions design studies: 35 M€ Support actions: 28 M€ (budget 2007-2008) Indicative budget for preparatory phase: 34 projects (budget 2007-2008) Closure: 2nd May 2007 First contracts to come into force before end 2007

ET: Einstein Telescope A European 3rd Generation Gravitational Wave Observatory Conceptual design study started May 2008 Money available from Sept. 2008 on (3M€ in total)

Need for new infrastructure Existing facilities subject to high, unshieldable environmental noise levels (seismic, gravity gradient noise) Data taking with advanced detectors incompatible with installation of third generation techniques in same envelope (requires long comissioning times)

From the 2nd to the 3rd generation 1st generation 2nd generation 3rd generation 1 10 100 1000 10000 -25 -24 -23 -22 -21 -20 -19

3 main noise sources 1st generation 2nd generation 3rd generation 10 100 1000 10000 -25 -24 -23 -22 -21 -20 -19 Seismic Shot Noise Thermal Noise

ET: Working groups Site and infrastructure Thermal noise of mirrors and suspensions / cryogenics Optical configuration Astrophysics issues Management J. Colas M. Punturo H. Lück J. v.d. Brand F. Ricci A. Freise B. S. Sathyaprakash

WG4: Astrophysics Issues Deduce relative speed of light and GW’s to ~ 1 sec / 3x109 yrs ~ 10-17 Determine mass of the Graviton Measure Hubble Constant from amplitude of inspirals that are also seen in EM radiation

WG1: Site & Infrastructure Figure: M.Lorenzini Issues: Scientific Security Costs Legal …

WG2: Thermal Noise, Suspension, Cryogenics Thermo-Optic Noise Cryogenics Cryo-Materials Coatingless Mirrors

WG3: Optical Configuration Squeezed Light High power laser (1064nm, 1550nm) Non-Gaussian beams

Scientific Coordinator WP5: Management Administrative Coordination (Jacques Colas) The Project coordinator chairs the Governing Council and the Executive board. He is responsible for the correct funds distribution within the contractors of the consortium. Scientific Coordination (Michele Punturo, Harald Lück) Verify and promote the achievement of the scientific targets of the project. His duties are: Trace the planning of the overall activities in accordance with the progresses and milestones reached in the different working packages Facilitate information exchange between WPs Chair the technical sessions during the project general meetings Collect and merge single WPs contribution to the bi-annual and annual reports Project Coordinator Scientific Coordinator WP1 coordinator Task responsible WP2 coordinator Task reponsible WP3 coordinator WP4 coordinator Secretary Secretary Virginie Bornes) Support Project coordinator and Scientific coordinator. Responsible for official web site containing Documentation of WP progress Documentation of meeting activity.

Project Decision Information Flow Executive board Governing Council Science Team Institutions Scientific community Project

Overall effort (proposal numbers) y 18 people for 3 years

WP5: Management Executive board Project Coordinator WP coordinators Scientific Coordinator GEO,Virgo , ST representatives (1 + 1 + 1) J. Colas Jo v.d. Brand F. Ricci Sathyaprakash A. Freise Michele Punturo Harald Lück R. Flaminio

WP5: Management Science team Participation open to all scientists of the GW community willing to contribute to this project through their expertise and networking ability. Co-chaired (first 6 months) by GEO spokesperson and by Virgo-EGO Scientific Forum coordinator The Science Team is to keep continuous contact between the scientists working in the project with the larger GW scientific community and to allocate resources (man power and know-how) available outside the project for all the activities in the project that need external support

Timelines You are here 1st Generation 2nd Generation 3rd Gen. Virgo ´06 ´07 ´08 ´09 ´10 ´11 ´12 ´13 ´14 ´15 ´16 ´17 ´18 ´19 ´20 ´21 ´22 Virgo GEO LIGO LISA E.T. Virgo+ Advanced Virgo GEO HF Hanford E-LIGO Advanced LIGO Livingston Launch Transfer data DS PCP Site Prep. Construction Comm. data 1st Generation 2nd Generation 3rd Gen.