Space Grant Symposium Presentation

Slides:



Advertisements
Similar presentations
SPACECRAFT ACCIDENTS: EXAMINING THE PAST, IMPROVING THE FUTURE Apollo 13 Bryan Palaszewski working with the Digital Learning Network NASA Glenn Research.
Advertisements

Mission Design Requirements First priority is to deliver takeoff mass to aircraft team. Deliver 5kg item to ISS 24 hour launch lead time Vehicle must be.
Mission To Mars In Kerbal Space Program, Where distances are 1/9 real world values.
Title: Intro to Water Bottle Rockets
Delta Clipper To Boldly Go…. A presentation by: Jason Moore & Ashraf Shaikh.
The Lander is at a 25 km Lunar altitude and an orbital period of approximately 110 minutes. After separation occurs the Lander is completely self sufficient.
Project X pedition Spacecraft Senior Design – Spring 2009
Design of a Piloted Spacecraft to Bridge the Gap between the Space Shuttle and Crew Exploration Vehicle Michael Seibert University of Colorado at Boulder.
THE FUTURE PLANS OF NASA FOR HUMAN SPACE FLIGHT; MISSIONS, LAUNCH VEHICLES.
Feb 2005 P. 1 Adaptive Control of Robotic Landers: Simulation Requirements Nilesh Kulkarni Perot Systems, Inc., Adaptive Control & Evolvable Systems Group.
Autonomous Landing Hazard Avoidance Technology (ALHAT) Page 1 March 2008 Go for Lunar Landing Real-Time Imaging Technology for the Return to the Moon Dr.
ENG 450: Potential Projects Nilton O. Renno, Professor Manish Mehta, Graduate Student University of Michigan.
21st Annual Arizona Space Grant Consortium Symposium
Educator Resources in Space Sciences Caitlin Nolby North Dakota Space Grant Consortium.
“Fly me to the Moon”. Few can argue there is a more exciting vehicle than the Saturn V One of the most successful craft ever built by NASA, no payload.
OSIRIS-REx Asteroid Sample Return (NASA New Frontiers Program)
NASA Robotics Mining Competition Ben Stinnett, ASU Dr. Srikanth Saripalli, ASU Tucson, AZ April 12, 2014.
V2 ROCKET LAUNCH Presentation by Austin Ford.  A German rocket scientist  Invented the V2 Rocket and later many more rockets  Became a rocket scientist.
Oh, Thank Heaven for 7-Eleven: Fueling Up in Space with In-Situ Resource Utilization ASTE-527 Final Presentation Riley Garrett.
Space Exploration Timeline
Exploring Our Past, Securing Our Future Space Grant Symposium April 12 th 2014 Model-based Systems Engineering of The OSIRIS-REx Mission's Science Processing.
Final Version John Martin May 13-17, 2002 Opening Comments Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
Commercial Space Vehicles Lessons Learned Needs Workshop Bette Siegel, Ph.D. ESMD Bette Siegel, Ph.D. ESMD September 18, 2006.
Chaotic Robotics Callie Branyan Mechanical Engineering A Study of Analog Robots and their Nonlinear Behavior Arizona Space Grant Symposium April 18, 2015.
CHARTING A COURSE TO THE MOON TEAM NAME: “AFTF” “Allyn’s Full Throttle Fliers”
Mars Today 1 An immediate and inexpensive program for manned Mars visitation.
Introduction to the Altair Project
The Space Shuttle. The Shuttle’s mission  The purpose of the space shuttle is to bring supplies, equipment, and people to the International Space Station.
America will send a new generation of explorers to the moon aboard NASA’s Orion crew exploration vehicle. After that, on to MARS!!!
My project on space By football fan and Lego boy.
Structural Practices Principles of Space Systems Design U N I V E R S I T Y O F MARYLAND Structural Design Practices Payload interfaces to launch vehicles.
Unit 6 Lesson 1 Explanation. In 2004, President Bush set the following goal for the NASA constellation program, “this vision… is a sustainable and affordable.
Journey to the Moon Saturn V rocket powers Apollo 11's lift-off from Kennedy Space Centre Journey to the Moon.
Identifying Ancient Glacial Features in The Circum-Argyre Region, Mars, Using HiRISE, CTX, and MOC Imagery Alexander Prescott Mentor: Victor R. Baker Department.
THE NEW XS-1 SPACE PLANE CAN INNOVATION GET ANY BETTER?
The Space Shuttle. The Shuttle’s mission  The purpose of the space shuttle is to bring supplies, equipment, and people to the International Space Station.
National Aeronautics and Space Administration Ares Project Joel Best / EO10 November 6, 2006 Ares Project Joel Best / EO10 November 6, 2006.
Educator Resources in Space Sciences Caitlin Nolby North Dakota Space Grant Consortium.
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
Educator Resources in Space Sciences Caitlin Nolby North Dakota Space Grant Consortium.
Launch Structure Challenge - Background Humans landed on the moon in 1969 – Apollo 11 space flight. In 2003, NASA started a new program (Ares) to send.
An Earth – Moon Transportation System Patrick Zeitouni Space Technology.
Strain Sensing at High Altitude Annual Arizona Space Grant Consortium ASCEND! Andy Gee Pima Community College Mentor: Mike Sampogna Pima Community.
SLS Derived Vertical Habitat
PASS Content Standard 2.2 Gravitation is a universal force that each mass exerts on any other mass.
Phoenix Mars Mission Andrew Levine Mentors: Chris Shinohara, Gwennie Furr, and Miles Smith Kuiper Space Sciences Building April 19, 2008.
Bringing Digital Technology Back to Earth ISCe2005 Presented by Ken Dozier USC Viterbi School of Engineering NASA Far West Technology Transfer Center.
National Goals and Objectives
Space News May 2015.
Energy in Space By Astrid Raisanen
MMS enters Phase 2b to study Magnetic Reconnection on Earth’s Dark Side On 9 February 2017, NASA’s Magnetospheric Multi-Scale (MMS) mission began a three-month.
Development and Principles of Rocketry
Faculty Advisors: Dr. Dan Kirk Greg Peebles Justin Treptow
Pioneering Achievement
3/21/2017 A Couplings Approach to Mitigate Unexpected Behaviors in Large Scale Complex Engineering Systems Ben Giles Mentor: Dr. Christina Bloebaum.
Analysis of Rocket Propulsion
Pioneering Achievement
Ares I System Requirements Review (SRR)
Measurement of the Earth’s Magnetic Field on a High-Altitude Balloon
Sustainable Space Development
Secondary Control Interface for Underwater Remotely Operated Vehicle
EagleSat 2: Design Development Lauren Barthenheier Dr
Introduction to the Altair Project
ASCEND! Team – Spring 2017 Nicholas Mallott,
Starting Student Space Hardware Programs IV
Video ULA.
Climate Change Online Labs Lesson
Apollo and Beyond cont..
Team A Propulsion 1/16/01.
Dynamics & Controls PDR 2
Presentation transcript:

Space Grant Symposium Presentation Saturday – April 19th, 2008 Joseph Farrell – U of A

Background Information Junior in Aerospace Engineering at University of Arizona Location of internship – Raytheon Missile Systems Project Title – “Robotic Lander Design and Development” Mentor – Jim Head (with assistance from Raytheon Engineers, and UA Faculty/Students) Joseph Farrell

General Tasks/Analysis Completed Analysis of a Lunar Surface Return (LSR) report and excel spreadsheet (‘06-’07 Space Grant Report). Review of the Boomerang Report (NASA). Analysis of Lander thruster configurations. Other Tasks: Organization and summarization of the Goddard Space Flight Center Program Listing. Basic Matlab proficiency. Preliminary Honeycomb Analysis (See Chris Rogers’ presentation). Joseph Farrell

Lunar Surface Return Mission Focus of Analysis Image taken from the Boomerang Report Joseph Farrell

LSR – Cont. LSR Report details a round-trip mission to the moon to collect a payload of moon material and bring it back to Earth. “Boomerang” Report details a functionally similar mission. Tasked with making the spreadsheet “close” Enough Net Delta V available for both the ascent and landing stages Positive lift margin for the launch stage Goal was to optimize the spreadsheet to function with the parameters of the “Boomerang” Report. Joseph Farrell

LSR – Cont. Analysis parameters: - Fixed Launch Vehicle - Landing Stage Between 1-4 pairs of fuel tanks Variable SRM Engine (Star # ATK Motor) - Lunar Ascent Stage (LAV) 2 Stage Launch Stage 1 – Variable SRM Engine (Star # ATK Motor) Stage 2 – Variable SRM Engine (Star # ATK Motor) Joseph Farrell

LSR – Cont. Ultimately concluded that spreadsheet can not ‘close’. “Boomerang” assumptions include the Lunar Lander providing delta V for landing and ascent. LSR Report / Spreadsheet lacks this assumption. Joseph Farrell

Thruster Configuration Analysis Presented with four potential thruster configurations for landing a Planetary Lander with a vertical delta V=250m/s: Configuration 1: 4 Divert Thrusters, 8 ACS Thrusters on deck. Configuration 2: 4 Divert Thrusters, 6 ACS Thrusters on poles. Configuration 3: 2 Lateral and 2 Downward Divert Thrusters , 8 ACS Thrusters on deck. Configuration 4: 2 Lateral and 2 Downward Divert Thrusters, 6 ACS Thrusters on poles. Joseph Farrell

Thruster Configuration – Cont. Joseph Farrell

Thruster Configuration – Cont. Task was to judge/analyze different configurations based on (only a few listed): - Braking Time - Fuel usage - Correction time for 10ms Divert misfire - Ability to compensate for C.G. drift - Misfires about the X, Y, and Z axes - More… Horizontal Vertical Error bars compensate for C.G. Drift Joseph Farrell

Thruster Configuration – Cont. Configuration 3 chosen to be optimum configuration – 2 Down, 2 Lateral Divert Thrusters, 8 ACS Thrusters on deck. Joseph Farrell

Conclusion Overall, my experience at Raytheon has been a very positive one. Gained valuable insight into team-work and solitary analysis. Better understanding of the practical work that goes with the title of an “engineer”. Thanks!! Joseph Farrell