IECEx 02 Audits according to OD 005 Theo Pijpker

Slides:



Advertisements
Similar presentations
Checking & Corrective Action
Advertisements

Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
ISO 9001 : 2000.
New 2014 CCC Regulation China Compulsory Certification G&M Compliance, Inc. November 25, 2014.
Establish Verification Procedures (Task 11 / Principle 6)
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Stock Audit in Shoper 9 February 2010.
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
Quality Management System
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
FPSC Safety, LLC ISO AUDIT.
ASPEC Internal Auditor Training Version
SAFETY AUDIT. 2.1 Definition of audit. Critical systematic inspection of an organization‘s activities in order to minimize losses due to accidents.
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
JENN SHAFNER BRIAN KROUSE CLINT KEHRES. Pre ISO 9000  The BS 5750 standard required factories to document manufacturing procedures.  BS 5750 was known.
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
Regulatory Overview.
Introduction to ISO New and modified requirements.
VALIDATION METHODOLOGY
Software Quality Assurance Activities
INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
Support Programs version 2 March 2010 Cleaning and Sanitation
Setting up an Internal Audit Program By
Material Adopted From: “The Internal Auditing Pocket Guide” --- J.P. Russell.
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
© 2011 Michigan State University and United Nations Industrial Development Organization, original at CC-BY-SA HACCP Principle.
SAAMF Roadshow Durban CSIR NML Eddie Tarnow Metrologist: Torque & Automotive 14 June 2006 ISO/TS 16949:2002 certification – Meeting the requirements of.
ANWAAR SPENCE BRAD BAGLIA NATHAN COOK TIMOTHY CARTER.
Internal Auditing ISO 9001:2015
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Most Common Deficiencies Cheryl O. Morton Managing Director, AIHA Laboratory Accreditation Programs, LLC.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
1 SMA/November 2007 ISO/IEC 17025: International Organization for Standardization.
WORKSHOP ON COMMON REQUIREMENTS FOR SERVICE PROVISION  Introduction to SESIS Guidance Material  Gerald Amar, SESIS Project Manager European Organisation.
Authority Requirements Margit Markus Tallinn, 7 May 2009.
Good Laboratory Practice - general information Pirkko Puranen Senior Inspector, Ph.D. Inspectorate.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Integrated Consulting Solutions Module 2: Management Commitment, Responsibility and Review.
GLOBALG.A.P. Risk Assessment On Social Practice – GRASP
ISO/IEC
External Validation of Quality Programs
PREPARATION FOR GMP INSPECTION
IECEx Rules, Procedures and Reports
a Certificate of Conformity
ExTAG Training Workshop Calgary 2012 QAR related Issues
IECEx Industry Seminar Integrating IECEx and ATEX for Europe
Michel BRENON IEC ExTAG Secretary
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
Audit Documentation and Administration
Setting up an Internal Audit Program
Introduction to SQF 2000 Certification
GMP Inspection Process
IECEx MC WG07 Report WG07 – Working Group on the introduction of an IECEx Mark of Conformity Timothy Duffy Rockwell Automation Convenor – ExMC WG07.
Internal Audit Training
VeriCon Quality Certification Scheme
Development of a specification
ISO 9000 Dr. S. Thomas Foster, Jr..
IECEx ExTAG Training Workshop 29th September
How to conduct Effective Stage-1 Audit
Quality Audits, and How to Survive them
Americas Aerospace Quality Group Registration Management Committee
On-Line Certificate System
EMS Development Course for Government Agencies
External Validation of Quality Programs
ISO/IEC 17025:2017 Documentation Requirements
HOW TO AUDIT AND TAKE AN AUDIT
Report of Japanese Test Phase <Cyber Security>
Nonconformity Writing
WG2 ADAS report – May Marseille
Presentation transcript:

IECEx 02 Audits according to OD 005 Theo Pijpker Certification Manager KEMA Quality B.V.

Topics Why audits? Use of OD 005 under IECEx 02 Benefit of ISO 9001 certification Audit differences Multiple production sites Common NCs Major/minor NCs Reporting Registration of QAR on IECEx website

Why audits? IECEx 02 is an ISO 67 No. 5 product certification system, which requires: surveillance of the production process/QS surveillance by testing or inspection of samples from the factory or the open market, or both Goal: full control of production every single product must meet the Ex-specifications

Use of OD 005 OD 005 specifies the requirements for quality systems used for production sites of the manufacturer OD 005 is linked to ISO 9001:2000 note: OD 005 must be updated to match with ISO 9001:2008 once it is published Provides additional requirements related to Ex-equipment note: informative Annex A and B are considered normative by KEMA Standard IEC/ISO 80079-34 is being developed by SC31M as future successor of OD 005

Benefit of ISO 9001 certification Good basis for compliance with OD 005 Reduction of IECEx audit frequency from 12 to 18 months (provided that a good ISO 9001 audit has been conducted) Reduction of actual IECEx audit time

Audit differences - 1 Initial audit: 100% audit covering all types of protection and all product groups 100% evidence is collected to support the audit findings usually 10 to 15 non-conformities; some are major sometimes additional corrective actions audit required

Audit differences - 2 Focus of Follow-up audit: corrective actions to NCs of previous audit changes to quality management system new products new types of protection usually 0 to 5 minor non-conformities usually no additional corrective actions audit required

Audit differences - 3 Reassessment audit: 100% audit covering all types of protection and all product groups (identical to initial audit) evidence is collected as far as it is not already in possession of KEMA corrective actions to NCs of previous audit usually 0 to 5 minor non-conformities usually no additional corrective actions audit required

Audit differences? Difference between initial / follow-up and reassessment audits is merely theoretical In practice there is often no clear difference between the audits due to changes in products, types op protection, management system, etc. Only relatively small and stable companies fit more-or-less in the 3 audit type model; large companies with several production sites usually don’t fit in.

Multiple production sites Sites usually operate under the same quality system Sites differ in product(group) and types of protection Sites differ in quality level, even within the same quality system Audit planning determined case-by-case, all production sites are audited at least 1 x 3 years

Common NCs Control of documents: not up-to-date poor traceability between scheduled drawings and related drawings Evaluation of suppliers: not evaluated on a regular basis evaluated on wrong criteria Control of monitoring and measuring devices not calibrated (example: go/no go calipers) used outside calibrated range (example: dielectric strength test equipment)

Common NCs Routine tests: method and equipment used no tests conducted wrong test method (example: even faulty products pass dielectric strength test) faulty test equipment Verification of incoming products poor verification declaration of conformity missing Control of Ex m potting material

Major / minor NCs No differentiation between major / minor NCs; instead: NCs that directly affect the safety level must be solved as soon as possible, evidence of implementation must be provided to KEMA and sometimes a corrective actions audit is conducted to verify correct implementation other NCs: proposed solution must be provided to KEMA within agreed time, evidence of implementation will be verified during next audit

Reporting Drafting of detailed audit report (QAR) is found quite time-consuming in current IECEx format KEMA uses an adapted IECEx format thus reducing the time needed for reporting without loosing quality/information --> Example of KEMA format Full audit report is sent to manufacturer

Registration of QARs QARs are only registered on IECEx website when the quality system is found to meet OD 005 (no major NCs, nor many minor NCs) Before CoC is issued, the on-line QAR is checked: If type of protection or equipment group are not in the scope of the QAR, manufacturer must contact the ExCB that conducts the audits. CoC placed on hold. Copy of full audit report is not required, valid on-line QAR with correct scope is sufficient.

Thank you for your attention Theo Pijpker KEMA Quality B.V.