ALICE Offline Week, CERN

Slides:



Advertisements
Similar presentations
ALICE TOF FESTIVAL Offline tools and GRID scenario for the ALICE TOF detector A. De Caro (University of Salerno and INFN) CERN – Bdg.29, October 20 th.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
VETO Analysis Update Michael Wood University of Massachusetts, Amherst Outline Introduction and basics Reconstruction packages Efficiencies Simulation.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
FMS review, Sep FPD/FMS: calibrations and offline reconstruction Measurements of inclusive  0 production Reconstruction algorithm - clustering.
ACORDE REPORT Pedro Podesta UAS Mexico. Geometry ( No changes) Alignment (No changes) QA (No changes ) Shuttle (In progress) To do Outline.
SSD Status P. Christakoglou (NIKHEF-UU) for the SSD collaboration Thanks to: Marco vL, Enrico, Mino, Marek and Massimo.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
PHOS calibration in CDB framework M.Bogolyubsky, Y.Kharlov B.Polichtchouk, S.Sadovsky IHEP, Protvino ALICE off-line week 3 October 2005.
PHOS offline status report Yuri Kharlov ALICE offline week 7 April 2008.
LAV Software Status Emanuele Leonardi – Tommaso Spadaro Photon Veto WG meeting – 2015/03/24.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
PHOS offline status report Dmitri Peressounko ALICE offline week,
HMPID offline status report D. Di Bari, L. Molnar, G. Volpe ALICE Offline Week, CERN, 22 June 2009.
1 ITS Quality Assurance (& DQM) P. Cerello, P. Christakoglou, W. Ferrarese, M. Nicassio, M. Siciliano ALICE OFFLINE WEEK – April 2008.
C. Oppedisano, 9 October 2007, ALICE Offline Week 1 RECONSTRUCTION ALGORITHM CALIBRATION OBJECT ESD STRUCTURE ONGOING TASKS.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
CBM ECAL simulation status Prokudin Mikhail ITEP.
TPC QA + experience with the AMORE framework Marian Ivanov, Peter Christiansen + GSI group.
1ECFA/Vienna 16/11/05D.R. Ward David Ward Compare these test beam data with Geant4 and Geant3 Monte Carlos. CALICE has tested an (incomplete) prototype.
Photon reconstruction and matching Prokudin Mikhail.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
1 SDD offline status Francesco Prino INFN sezione di Torino ALICE offline week – March 15th 2010.
Features needed in the “final” AliRoot release P.Hristov 26/10/2006.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
ARCHITECTURE. PRR November x 32 PADs Up to 26 or 3 x 17 MANU BOARD. PATCH BUS Translator Board. FEE DETECTOR Up to 100 PATCH BUS per detector. MANU.
ALICE Offline Week October 4 th 2006 Silvia Arcelli & Chiara Zampolli TOF Online Calibration - Strategy - TOF Detector Algorithm - TOF Preprocessor.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Javier Castillo 1 Muon Embedding Status & Open Issues PWG3 - CERN - 15/02/2011.
1 SDD offline status Francesco Prino INFN sezione di Torino ALICE offline week – October 20th 2008.
AHCAL analyses overview List of ongoing analyses targeted to the upcoming publications Erika Garutti.
PHOS offline status report Yuri Kharlov ALICE offline week 7 July 2008.
Bedanga MohantyALICE offline meeting, CERN, Oct :3 rd – 7 th 1 Bedanga Mohanty, VECC, Kolkata ALICE PMD alignment issues  Align-able parts  Alignment.
A. SarratILC TPC meeting, DESY, 15/02/06 Simulation Of a TPC For T2K Near Detector Using Geant 4 Antony Sarrat CEA Saclay, Dapnia.
 offline code: changes/updates, open items, readiness  1 st data taking plans and readiness.
D. Elia (INFN Bari)Offline week / CERN Status of the SPD Offline Domenico Elia (INFN Bari) Overview:  Response simulation (timing info, dead/noisy.
1 Calice TB Review DESY 15/6/06D.R. Ward David Ward Post mortem on May’06 DESY running. What’s still needed for DESY analysis? What’s needed for CERN data.
AliRoot survey: Calibration P.Hristov 11/06/2013.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
January 2009 offline detector review - 2 nd go 1 ● Offline – Geometry – Material budget – Simulation – Raw data – OCDB parameters – Reconstruction ● Calibration.
V4-18-Release P. Hristov 21/06/2010.
Alignment of the ALICE MUON Spectrometer
Christoph Blume Offline Week, July, 2008
FSC status and plans Pavel Semenov IHEP, Protvino
Marian Ivanov TPC status report.
Massimo Masera INFN sezione di Torino
v4-18-Release: really the last revision!
SDD Quality Assurance (& DQM)
Stress tests for CLAS12 software
Commissioning of the ALICE HLT, TPC and PHOS systems
ZDC Status Report Outline C. Oppedisano E. Scomparin
Panagiotis Kokkas Univ. of Ioannina
Detection of muons at 150 GeV/c with a CMS Preshower Prototype
AliRoot status and PDC’04
Progress with MUON reconstruction
EMCal Offline Code Status: Introduction and tasks
Analysis framework - status
TPC status - Offline Q&A
Implementation of DHLT Monitoring Tool for ALICE
Presentation transcript:

ALICE Offline Week, CERN PMD Software Status Geometry Raw data Calibration Reconstruction Alignment ESD/QA Event Display Task list – time lines etc. Simulation results on photon efficiency and purity Prepared by: The PMD Software team April 7, 2008 ALICE Offline Week, CERN

Flow chart of PMD data reconstruction Hits Reconstruction/Clustering SDigits KeV-ADC Conversion From Test Beam Alignment Digits Track/Cluster Matching Hardware Mapping information RAW DATA ESD Gain Calibration April 7, 2008 ALICE Offline Week, CERN

ALICE Offline Week, CERN GEOMETRY All modules, Pb plates, SS plates, FEE boards are implemented View from IP Side view Module type B Module Type A April 7, 2008 ALICE Offline Week, CERN

ALICE Offline Week, CERN GEOMETRY: Code Status Code for Geometry with FEE boards exists. Cables will not be in front of the detector, thick cables are on the sides. At the moment exact cable layout still unknown as the place of PMD location is quite crowded with lots of material. It is not possible to implement these in the software. PMD movement mechanism is getting finalized and will also be included in the software. PMD installation is scheduled for April 28th Geometry-as-installed (implementation) will be after that. April 7, 2008 ALICE Offline Week, CERN

ALICE Offline Week, CERN SDigit and Digit Taken care of by AliPMDDigitizer. Geant Energy deposition is converted into a 12 bit ADC (Information from 2003 and 2006 Test Beam ). ADC from digits AliPMDDigitizer in SVN . April 7, 2008 ALICE Offline Week, CERN

ALICE Offline Week, CERN Number of DDL Geant simulation with dN/dh = 4K Considering 250 words per patch bus ( read out time and the bus length) Preshower plane: 12 FEE boards per chain, 6 chains per Module, 36 chains – 1 crocus Total number of DDL = 4 CPV plane: For module type A(12 in total): 24 FEE boards per chain, 3 chains per module For module type B(12 in total): 24 FEE boards for 2 chain, 12 FEE boards for 2 chain 42 chains - 1 CROCUS, Total number of DDL=2 April 7, 2008 ALICE Offline Week, CERN

ALICE Offline Week, CERN DDL Data Two blocks of data Each block of data contains 8 Block Header words 10 DSP Header words 4 PatchBus Header Words Loop over data words Signal Ch address MCM address P 11bits 6bits 12bits If the number words are odd, one word is added in the end April 7, 2008 ALICE Offline Week, CERN

Calibration: isolated cell spectra It is important that the response of each cell be uniform through out the detector. From test beam result we know that charged hadrons typically hit single cell while photons hit more than one cell. We look for hit cell whose surrounding six neighbors are not hit. These isolated cells are assumed to be hadrons. ADC>0 isolated cell April 7, 2008 ALICE Offline Week, CERN

Calibration Status (Offline): Calibration Class: AliPMDCalibrator Calibration Object: AliPMDCalibData Data member: GainFact[Int_t][Int_t][Int_t][Int_t] All codes are committed in SVN. De-calibration and calibration tests with dummy gain factors done - Also tested with simulated data. Calibration algorithm includes isolated cell search method. - Cell-to-cell normalization factors exits (in SVN) Module-module normalization factors included - Cleanup for hot cell included in calib. algorithm April 7, 2008 ALICE Offline Week, CERN

Calibration Status (online): PreProcessor for SHUTTLE AliPMDPreprocessor.cxx and AliPMDPreprocessor.h Pedestal information included. Add RunType Functionality added Codes are written, tested in nightly test Codes are in SVN DA: code in SVN. Validation is waited. April 7, 2008 ALICE Offline Week, CERN

Reconstruction CLUSTERING PHOTON-HADRON DISCRIMINATION PMD data are not pedestal subtracted Needs pedestal subtraction before reconstruction There will be a separate pedestal data file Extract the mean and rms and put it in OCDB Extract the numbers from OCDB and keep it in the memory Subtract it channel-wise in every event We have implemented the pedestal information in AliRoot Framework. AliPMDPedestal.cxx and AliPMDPedestal.h in SVN. April 7, 2008 ALICE Offline Week, CERN

Reconstruction: Clustering Overlapped cluster Clustering done module by module First all connected cells are grouped Gaussian unfolding is used to find out the Edep and No. of cells for overlapping clusters AliPMDClustering : base class AliPMDClusteringV1 All codes in SVN. AliPMDClusteringV2 Clustering code in SVN. An improved version will be committed this week. April 7, 2008 ALICE Offline Week, CERN

Discrimination/Cluster Matching Clusters of CPV plane and PRE shower plane to be matched PID is assigned depending on this and a threshold on energy deposition. After assigning the PID, variables are stored in the ESD for physics analysis Out of these clusters, a set of clusters are identified as Gamma-like clusters For these samples efficiency and purity to be determined AliPMDDiscrimination : base class AliPMDEmpDiscrimination : takes care of the cluster matching Codes in SVN Only the modules are there, but no logic inside. Not tested also. Work in Progress April 7, 2008 ALICE Offline Week, CERN

ALICE Offline Week, CERN Alignment targets Survey points for PMD co-ordinates and alignment Some adjustment possible by adjusting the align-able screws Planarity problems and shift in steel frame in one direction possible. April 7, 2008 ALICE Offline Week, CERN

ALICE Offline Week, CERN Alignment: Each plane has 24 modules which will be mounted separately on steel plates. The precision of distances between modules mounted on the steel plates can be controlled . Align-able parts of the PMD are (i) steel plates (ii) distance between the two planes (iii) Cells of two planes Macro to generate the Alignment object is in SVN Macro to generate the misalignment from the survey data is being written now. April 7, 2008 ALICE Offline Week, CERN

ALICE Offline Week, CERN ESD Following variables are being stored for Physics Analysis - Detector plane (PRE:0, CPV:1) - Cluster X - Cluster Y - Cluster Z (without vertex correction) - Cluster ADC - Number of cells in a cluster - Cluster PID AliESDPMDTrack : code in SVN April 7, 2008 ALICE Offline Week, CERN

ALICE Offline Week, CERN ESD: QA From Digits From ESD PMD QA codes are in SVN. Logfile for comparison missing. April 7, 2008 ALICE Offline Week, CERN

ALICE Offline Week, CERN Visualization Event Display April 7, 2008 ALICE Offline Week, CERN

Visualization Codes in SVN Implemented reading digits as well as raw data Codes in SVN April 7, 2008 ALICE Offline Week, CERN

ALICE Offline Week, CERN Documentation Present documentation available at: http://www.veccal.ernet.in/~pmd/ALICE/software.html The page is updated regularly. April 7, 2008 ALICE Offline Week, CERN

1. Geometry: Detector with structure and FEE Yes yes Task Committed to SVN? Comment / Timeline 1. Geometry: Detector with structure and FEE Yes yes 2.Cables in geometry No After installation 3. Geometry as installed, overlap vols. Not complete 4. Raw Data format 5. Calibration (Offline) 6. Preprocessor 7. DA To be validated 8. Alignment & survey data to align-able objects Testing and bug-fixing to be done end June 9. Clustering Routine New version with a week 10. Discrimination Improvement in progress 11. QA(Digit/ESD) Ref. histograms missing 12. ESD and AOD ESD: Yes, AOD: No Work in progress 13. Event display 14. Documentation In progress April 7, 2008 ALICE Offline Week, CERN

ALICE Offline Week, CERN CLUSTERING Natasha Sharma Photon when hit lead converter produce shower. The shower hits a group of cells of Preshower plane. The group of connected cells is called a cluster. ASSOCIATION April 7, 2008 ALICE Offline Week, CERN

Present Clustering Routines Clustering of hits is performed separately for each super module All hits cells are arranged in the descending order of energy deposited First all local maxima are searched The energy deposition in cells which is common to more than one local maximum, are redistributed by assuming a Gaussian energy deposition profile Present Clustering Routines April 7, 2008 ALICE Offline Week, CERN

ALICE Offline Week, CERN Terminology Used Number of incident photons from Hijing:Ninc Total number of clusters on PMD: Nclu Number of clusters after 3 MIP cut: Nlike Number of detected incident photons on PMD : Ndet Efficiency = Ndet/Ninc Purity = Ndet/Nlike April 7, 2008 ALICE Offline Week, CERN

 distributions of Ninc, Nclu, Nlike and Ndet April 7, 2008 ALICE Offline Week, CERN

Efficiency and Purity of photons Preliminary results: dN/dh~1000 April 7, 2008 ALICE Offline Week, CERN