Construction Project management Prepared by: Muath Saadeh Saadeh Abu-Sa’da Kamel Beshara.
Advertisements

AN-NAJAH NATIONAL UNIVERSITY FUCULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT GRADUATION PROJECT CONSTRUCTION PROJECT MANAGEMENT (Value Engineering)
Project Management - Part 2
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
In the name of Allah the Most Gracious the Most Merciful.
An-Najah National University Faculaty Of Engineering Civil Department Construction PROJECT MANAGEMENT CONSTRUCTION PROJECT MANAGEMENT Prepared by: sameh.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 3 part 2 Project Management.
An-Najah National University Faculty of Engineering Civil Engineering Department Terra Santa School Structural Design and Analysis Prepared By: Bara Shawahna.
LINE DIAGRAMS Learning objectives After this lecture you will be able to: Prepare and use line diagrams Demonstrate the effect that making activities ‘continuous’
SEEM 3530 Program Evaluation and Review Technique
An-Najah National University Engineering college Building Engineering Department Health Center Prepared by: Sobhi Ibrahim Islam Ammar Mohammad Odeh Supervisor:
An-Najah National University Engineering Faculty Civil Engineering Department Submitted in partial fulfillment of construction project management for the.
Structural Analysis and Design of
Construction Project Management “Tubas Governmental Hospital” Prepared by: Asma’a Abu-Aqel Naheel Al-Naser Presented to: Ir: Barraq Jumaa.
Tulkarem Multipurpose Sport Hall Prepared by: Moatasem Ghanim Abdul-Rahman Alsaabneh Malek Salatneh Supervisor: Dr. Shaker Albitar.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
Measuring Palestinian labors productivity Rates for Block, Steel and excavation works Measuring Palestinian labors productivity Rates for Block, Steel.
Construction Project Management Prepared By: Omar Al-Taher Supervised By: Dr Baraq Jum’aa.
Project title : Typical design of community college Supervisors: 1-Prof.Dr.abdulmohsion W. Dhowain 2-Dr. Mohammad Jamal AL Shannag 3-Dr. Ibrahim Hamouda.
P ROJECT M ANAGEMENT. Case study Assumptions Methodology Discussion.
What is the “Project”? A temporary endeavor undertaken to create a unique product or service.
PERT/Activity Diagrams, Completion Probability and the Z Score
7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.
The four basic types of structures are :
Cost Overrun in Construction Projects Supervisor : Eng.Reema Nassar.
PERT CPM assumes duration of activity is known with certainty.
PERT/Activity Diagrams, Completion Probability and the Z Score
An-Najah National University
Measuring Palestinian Labors Productivity
Construction Project management
{Beir Ziet Secondary Boys School }
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
Traffic System Management for “Tulkarem”
Design of shallow foundations for optical and nursing faculty
Hospital Establishment
Integrated design Of Fuel Station
Tamer Sultan Mousa Ziadeh
Construction Project Management
Graduation Project (II): Operations Improvement at Mhanna Factory
Construction Project Management
Graduation Project 2 Redesigning a Villa
An-Najah National University
Integrative Design of a Secondary School
Stock Exchange building design
Construction Project Management
What is the best method for constructing schools in Palestine ?
Environmental Friendly Multi purpose–Hall Design
Construction Project Management
Construction Project management
CPM, PERT & Schedule Risk Analysis in Construction
Villa Graduation Project 2 Prepared By : Abdalla Naem Dwikat
An-Najah National University
An - Najah national university Civil engineering department
An Najah National University Submitted to : Dr.Munther Diab .
Project Management CPM/PERT Professor Ahmadi.
" multifunctional building design"
An-Najah National University
Uncertain activity duration (P14)
Civil Engineering Department
Uncertain activity duration (P14)
Supervisor: Eng. Mohammad abu neama
PERT Program Evaluation and Review Technique
Planning and Managing Projects
PERT/Activity Diagrams, Completion Probability and the Z Score
Construction Project Management
Factors Affecting Bid/No Bid Decision Making IN The West Bank
Managing Risk Chapter 7.
An-Najah National University Faculty Of Engineering civil Department
Muskat Secondary School Project
Presentation transcript:

An-Najah National University Faculty Of Engineering Construction Project Management Iktaba Comprehensive Activity Center Done By : Hosny Jallad and Odai Abu Khadija supervisor : Eng. Barraq Jumaa

Two Parts of Our Project Part 1 :(Project Time Management) Preparing a theoretical research (The relation between Time , Cost and Quality also PERT analysis ) Part 2 : Apply all the principles that mentioned in part 1 on a real construction project.

Project Description Iktaba Comprehensive Activity Center is located in Iktaba Village at Tulkarem City. The center consist of 3 Floors contains : Hall Meeting, Multi Purpose Hall, Training area and Head master and Secretarial offices.

Project Description Assumptions: Price Assumption= 1$= 3.5 Shekles. Mechanical and Electrical Works Assumption= 7% of total cost of the project. Profit Assumption= 12% of total cost of project. Overhead cost assumption= 8% of total cost of project.

WBS

Objectives Apply the Principles of Part 1 at a real project to give us a better understanding of many issues and to get some experience in construction management. Solving engineering Problems in this construction project to achieve economic and safety factors. To highlight the impact of delaying project to avoid liquidated damages and to meet the dead line.

Methodology

Study Case The owener wants from the contractor to submit the project in 210 calendar day, and any delay will cost the contractor 150$/day. In order to meet the deadline we have to make a check on the probability factor, and this depend upon the safety of the structure, by making a check on all Structural elements (Slabs, Beams, Columns, Footings)

Study case (cont.) After we analyzed the structural elements by SAP we found there is problem in the footings design and so we made anew design for the footings. The old design is

Study case (cont.) The new design is : The New design is increased by 11% from the old one, which is equal to 664$ . We have anew type of footings (F4). Although it has same column dimensions like (F1), but it has high service load.

Study case (cont.) Other structural elements were Safe ( Columns, Slabs and Beams) The three types of durations (Optimistic, Most likely, Pessimistic). Optimistic: (a) the shortest possible time in which the activity can be completed in ideal conditions. Most Likely:(m) Every things go in normal way. Pessimistic:(b) Max. possible time if there is wrong and up normal situation.

Study case (cont.) The expected time for activity gives by :

Study case (cont.) We input activities with its description, expected time (Te), resources and costs.

Study case (cont.) :Analysis - Probability to meet the dead line:

Study case (cont.) Variance for each activity: Mean: Project duration from Primavera = 206 calendar day =172 Working day Total Variance= Sum of variances of durations for activity on critical path= 5.88 days. The dead line from owner = 210 calendar day = 175 working day.

Study case (cont.) Probability factor D = 175 days End = 172 day S.d.= 2.42487. Z = 1.237 using Normal distribution table Pr (Z<1.237)= 0.8925. The probability to completing the project = 89.3%

Results Project duration = 206 calendar day Cost/day = 1300 $ Total Project cost= 268,539 $ Price per meter= 356.7$

Result (cont.) Cost distribution :

Conclusion According to the golden triangle ( Time, Cost , Quality ) , saving 4 calendar days reduced the total project cost by 4000 $ with high quality . The probability to meet the dead line is 89.3% which good scheduling and that’s a good percent to complete the project in specific time

Thank You ,,