ET-CTS 2016 ASECNA, Dakar. Senegal Date: April 2016

Slides:



Advertisements
Similar presentations
STATUS AND UPGRADATION PLAN OF RTH NEW DELHI AND TELECOMMUNICATION NETWORK OF IMD N.K.Pangasa Director RTH New Delhi.
Advertisements

INTERNATIONAL SATELLITE COMMUNICATIONS SYSTEM (ISCS) SUCESSOR TCP/IP SYSTEM Background - Status – Backup RA IV/WG-PIW-04/Doc. 5.2(1) ISCS Status (13.X.2004)
WAN Technology Overview Lecture 3: Introduction to WAN.
1xE1/T1 over Ethernet Multiplexer (TDMoIP) Slide 1Updated: April 2010Orion Telecom Networks Inc xE1/T1 over Ethernet Multiplexer (TDMoIP) Product.
National Institute of Meteorology and Hydrology BAS WIS Implementation in DCPC- SOFIA National Institute of Meteorology and Hydrology BAS.
NOAA’s NWS Telecommunication Gateway RTH Washington
CMA’s new GTS system Submitted by YANG Genlu, China
WE Surface-based Global Observing System for Weather Dr Alexandre Karpov Task POC.
The WMO Information System (WIS)
Gianni,José Luis. COUNTRYCITYCIRCUIT TYPESPEEDTRANSFER PROTOCOL EXCHAN GE DATA REMARKS USA Washington (WMC) Leased Line 64K TCP/IP SOCKETS A/N,GRIB T4.
Status of the Global Telecommunication System connected with RTH Tokyo Japan Meteorological Agency Presented by Masahiro Kazumori Eighth Meeting on Asia-Pacific.
Air Operations Division AIM System for ASECNA organisation (17 African countries) Description:  Full AIM solution composed of AIXM / eAIP / Charting /
STATUS OF IMPLEMENTATION AT RTH BEIJING SHI Peiliang, China
Status of the Global Telecommunication System connected with RTH Tokyo Sixth Meeting on Asia-Pacific Satellite Data Exchange and Utilization (APSDEU-6)
1 Development of GTS and Data Exchange in China National Meteorological Information Center, CMA.
Status of RTH Tokyo Japan Meteorological Agency Presented by Tatsuya Noyori Expert Team on WIS-GTS Communication Techniques and Structure (TOULOUSE, France,
Status of RTH Tokyo Japan Meteorological Agency Presented by Kenji Tsunoda Joint implementation-coordination meeting on the GTS-WIS MTN and meeting of.
Status of Implementation TCP/IP at RTH Beijing NMIC, CMA.
1 Towards Full GISC Compliance for IMD in
RTH Moscow 1 STATUS OF RTH MOSCOW (Submitted by Expert Russian Federation) ________________________________________________________________ Summary and.
1 Eiji (aka Eizi) TOYODA Japan Meteorological Agency Cg-XVI May 2011, Geneva WMO Information System at Japan Meteorological Agency.
GISC Brasilia status report Doc25 (AI 2)
(CBS/OPAG-ISS ) November 2007 Washington, USA
Météo France GISC and DCPCs
RMDCN Status Report Submitted by: Oliver GORWITS (ECMWF) (Doc 20)
Status report of GISC Beijing
GISC Tehran Status Feb, 2016 TT-GISC 2016-Doc18.
GISC Status WIS Portal based on a commercial solution
Requirement for Full Global Operation on WIS Survey on the WIS Doc
STATUS OF TCP/IP PROCEDURE RTH OF DAKAR, NIAMEY AND BRAZZAVILLE
Current Status of Implementation of MTN at RTH Toulouse
Status Report of GISC Beijing
Progress Report on WIS Implementation, Hong Kong Observatory, Hong Kong, China Submitted by: S.T. CHAN (Hong Kong, China) (Doc 12) Expert team on WIS centres.
GISC PRETORIA STATUS REPORT.
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
RTH Exeter Status Report
Status of IRIMO Data Center Submitted by: Farah Mohammadi (I. R
Mariane Diop Kane, Chair
Review of the current status of implementation of TCP/IP procedures and applications at GISC Beijing ET-CTS, Dakar, 5-8 April 2016.
RTH Prague Czech Hydrometeorological Institute Ladislav Keller
ET-CTS 2016 ASECNA, Dakar. Senegal Date: April 2016
Expert Team on WIS Centres Task Team on GISCs
Status Report of GISC Tokyo
WIS overview Submitted by: Secretariat (Doc 02b)
Status of Implementation at RTH Tokyo
Status Report – GISC Melbourne
GISC Washington Status Submitted by: Robert BUNGE (USA) (Doc 20)
Feed back to HMEI Submitted by Secretariat) (Doc 10)
GISC Moscow status report Submitted by: Sergey BELOV (Russia) (Doc 17)
(Submitted by José Mauro de Rezende)
GISC xxxx Status Report Submitted by: xxx XXX (Country) (Doc xx)
Toulouse GISC Status Doc 29
Status Report of RTH Tokyo
ET-CTS 2016 ASECNA, Dakar. Senegal Date: April 2016
WIS Project Office WMO WIS Data Exchange WIS Project Office WMO
Status of RA II WIS Implementation Plan
Toward WIS2.0 Shigeharu NISHIKAWA Japan Meteorological Agency
Status Reprot GISC SEOUL
Status report of GISC CASABLANCA
GISC Offenbach – Status Report 02/2014 (Doc 19)
- Measurement of traffic volume -
GISC Offenbach Kai Wirt Task Team GISC TT-GISC2018
GISC Brasilia Status Doc 30
Status Report – GISC Melbourne
Status report of GISC Beijing
GISC Status Report GISC Pretoria
GISC New Delhi Status Dr. S. L. Singh
Background - Status – Backup
RTH Exeter Status Report – 2014 (Doc 22)
GISC Beijing Status Report
Presentation transcript:

ET-CTS 2016 ASECNA, Dakar. Senegal Date: 05-08 April 2016 Review of the current status of implantation of TCP/IP at WIS Centres Submitted by: SOUGUE Bissa (ASECNA) (Doc 26 – AI 2) ET-CTS 2016 ASECNA, Dakar. Senegal Date: 05-08 April 2016 WMO. ET-CTS 2016

Air Navigation Service Provider 17 African Countries& France ASECNA IN A GLANCE Air Navigation Service Provider Created in 1959 : 17 African Countries& France More than 16 Millions km² Six Flight Information Regions Five Meteorological Monitoring Centers Three RTH A satellite VSAT based Network (more than 100 nodes) ET-CTS 2016

Overview of AFISNET STANDARDS (TYPE) SERVICES (TYPE) SFA / SMA/MET QUANTITY F1 (3,7m) SFA, METand SUR 30 F1 (3,7m-4,5m) SFA,MET,SMA and SUR 07 SMA 54 F2 (7,3m) 7 B (11m) 2 TOTAL 100 ET-CTS 2016

AFISNET Topology ET-CTS 2016

ASECNA FULL IP INFRASTRUCTURE ET-CTS 2016

ASECNA FULL IP INFRASTRUCTURE (Bandwith) 27/8 Mb/s Internet (Intelsat Fusschtadt teleport) (equivalent 2 to 4 Mb/s by site) 20/14 Mb/s corporate applications (Internet backup ) Dedicated circuits 19.2 to 64 Kb/s (RTH to NC and RTH to RTH) ET-CTS 2016

IP INFRASTRUCTURE UPGRADE (Bandwith) ET-CTS 2016

GTS implementation status ET-CTS 2016

INTERCONNEXION DES CRT ASECNA RTH interconnected in triangle and each RTH connected to Toulouse GISC with mutual backup. Implementation of an AFISNET VSAT node in Toulouse to ensure reliable links between Toulouse GISC and ASECNA RTH candidate to DCPC ET-CTS 2016

AUTOMATIC MESSAGES SWITCHING SYSTEMS MESSIR COMM (in 17 countries) Including the following fonctionalities; Data format : TAC, BUFR et CREX; Satellite images; Various format conversion (TAC-TDCF); AGM, IWM… fonctions; Multiple protocols interfaces : TCP/IP(FTP, Socket, Emails, …), SMS, Asynchrone, Fax Able to support WIS applications ; ET-CTS 2016

Regional Opmet Data Base (Dakar) Web server for the retrieval of Opmet Data Ongoing extension ET-CTS 2016

Thank you for your attention souguebis@asecna.org ET-CTS 2016