Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.

Slides:



Advertisements
Similar presentations
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
Advertisements

:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
LHC status Friday 11 th September 2015 Coordination: Mike Lamont, Jorg Wenninger.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday 3rd October - morning
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
Thursday morning – optics correction
LHC Morning Meeting - G. Arduini
Summary of Week 11: 14 – 21 March
Wednesday 31 October: Morning
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
LHC Morning Meeting - G. Arduini
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
LHC Operations overview Week 28 – Getting back
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
LHC Morning Meeting - G. Arduini
Yesterday’s morning’s controls issues
Finally.... We had to wait a long time.... We had many problems....
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
(on behalf of the LHC team)
Sunday/Monday & :30 Stable beams. Fill #1851.
Monday – Morning Fill 3265 stable beams since 1:31
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday Fill 1364 (24 bunch) dumped at 07h
Monday 3rd September - morning
Tuesday morning 08:30-09:00 Squeeze with probe.
Saturday 3rd November - morning
LHC Morning Meeting - G. Arduini
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Thursday 17/3 Morning: evaluation of the origin of the timing problem occurred over night and the implication on machine protection 09:00 – 12:00 Dry ramp.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
LHC - Week 38 Technical stop: Katy Foraz
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 24 September 2011.
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Thursday 20th July - morning
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Wednesday 26 October 2011.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Wednesday 6.10 Morning: Quench test at 450 GeV
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Monday 5 July Morning: Continued with the Physics fill, 7b x 7b, 1e11/bunch Stable beams from 2:30 am to 13:30 : 11 hours.
Tuesday
Presentation transcript:

Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded from V387 to V390.  This new version has a patch for the two I_MEAS fault trips seen recently in operation (on Friday June 3rd, 13:00 and Tuesday June 7th, 07:28) Pierre Dejoue, Quentin King 8/6/2011 LHC 8:30 meeting

Tuesday morning End of the ramp-down fault on the TCL.5L1.B2, and had to call the STI piquet, who found a broken resolver. This was fixed in about half an hour. QPS crate was lost and required an access before ramping. Abandon attempt to measure Q’ on flat bottom Access was organized for 10 am QPS (S12 and S56) Experiments who had requested 2 hours. Pending RB cable inspections in P4 and P2 done; the new version of the FGC software deployed MKD power supply for B2 replaced new version of Post Mortem server has been released + tested Re-deployed BQBBQLHC FESA process on all continuous and on-demand systems. During the QPS access in P5 the patrol was lost in two access sectors due to a malfunctioning switch in the PAD. 8/6/2011 LHC 8:30 meeting

Tuesday – early afternoon The access team started to work on the PAD while the other interventions were still ongoing, their initial hypothesis was that the PAD door synchronization had to be retuned. Later on they found the faulty switch. In the meanwhile the SPS announced that they would not be able to deliver beam between 1 and 2 pm due to a scheduled intervention of EDF. It was then decided to postpone the replacement of the PAD switch, which required one hour, in order to try and inject 12 bunches for the test ramp with the new longitudinal blowup settings, before the intervention in the SPS. Tried to close the machine, after the patrols. But there was a problem with the sirens in P2 (same as Sunday night), and TI had to call the piquets to fix it. Also, another quench heater had discharged in S56, so we could not switch on the RB. At this point we called the access team back and let them repair the switch in parallel with the access for QPS. The intervention on the PAD dropped the patrol for the second time. At the end of the shift the patrol is being re done, after that we should be ready to recycle the machine. 8/6/2011 LHC 8:30 meeting

Tuesday afternoon 16:50 Pre-cycle started 17:00 problem with energy tracking on MKD power supply for B2 that was replaced this morning. Back in to replace replaced beam dump power supply 8/6/2011 LHC 8:30 meeting

Injection kicker temperatures SoftStart with the MKIs at 54 degrees this morning. Mike Barnes analysed the data and the delays are fine.  For this reason we will increase the interlock temperature from 55 to 60 degrees. Would be good to get a measurement with beam sometime - this would mean injecting a pilot in inject and dump for maybe 1 hour as soon as possible after the end of a long fill, and checking for any systematic on the injected trajectory. 8/6/2011 LHC 8:30 meeting

Tuesday evening 20:15 Beam back 22:30 #1856 Stable beam In the presence of a full blown German film crew… Ratty old fill – just over 1e33 Some blow-up at 450 GeV but decided to go with anyway … - B1 blow up in V on 2nd, 3rd, 5th 108b injection; - B2 blow up in V on 2nd, 4th and last 108b injection. 8/6/2011 LHC 8:30 meeting

BBQ amplitude during injection Clear visible on BSRT as well 8/6/2011 LHC 8:30 meeting

bunch intensities 8/6/2011 LHC 8:30 meeting

Specific luminosity 8/6/2011 LHC 8:30 meeting

Incoming Dump early afternoon Test ramp for RF blow-up (12 nominal bunches) Re-fill for physics 144 bunch injection no 12 observation bunches Outstanding TCLs Q’’ Q’ decay following long fill 8/6/2011 LHC 8:30 meeting