of secondary light ion beams

Slides:



Advertisements
Similar presentations
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
Advertisements

Test Beam at IHEP,CAS ZHANG Liang sheng, Test Beam Group Introduction BEPC/BES Ⅱ will be upgraded as BEPC Ⅱ / BES Ⅲ, it is necessary to do beam test for.
Centauro and STrange Object Research (CASTOR) - A specialized detector system dedicated to the search for Centauros and Strangelets in the baryon dense,
March 13thXXXXth RENCONTRES DE MORIOND 1 The Alpha Magnetic Spectrometer on the International Space Station Carmen Palomares CIEMAT (Madrid) On behalf.
A. Bay Beijing October Accelerators We want to study submicroscopic structure of particles. Spatial resolution of a probe ~de Broglie wavelength.
Timing Properties of T0 Detectors At PHOBOS Saba Zuberi, Erik Johnson, Nazim Khan, Frank Wolfs, Wojtek Skulski University of Rochester.
Patrick Robbe, LAL Orsay, for the LHCb Collaboration, 16 December 2014
Supriya Das SQM 2006, 26th March 2006, UCLA 1 Event By Event Fluctuation in K/  ratio atRHIC Supriya Das § VECC, Kolkata (for STAR Collaboration) § Present.
The Time-of-Flight system of the PAMELA experiment: in-flight performances. Rita Carbone INFN and University of Napoli RICAP ’07, Rome,
Possible measurements with crystals in NA Test of single crystals for the SPS and LHC beam collimation.
JSPS Research Fellow / University of Tsukuba T. Horaguchi Oct for HAWAII /10/15HAWAII
1 NA49/NA61: results and plans on beam energy and system size scan at the CERN SPS Onset of deconfinement: - NA49 evidence - NA61 systematic study Critical.
Recent results from NA61/SHINE Seweryn Kowalski for the NA61/SHINE Collaboration University of Silesia, Katowice.
ハイパー核ガンマ線分光用 磁気スペクトロメータ -SksMinus- 東北大学 大学院理学研究科 白鳥昂太郎 ATAMI.
Tools for Nuclear & Particle Physics Experimental Background.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
RESEARCH POSTER PRESENTATION DESIGN © The RHIC Beam Energy Scan (BES) was proposed to search for the possible critical.
March 13thXXXXth RENCONTRES DE MORIOND 1 The Alpha Magnetic Spectrometer on the International Space Station Carmen Palomares CIEMAT (Madrid) On behalf.
Grazyna Odyniec STAR physics program and technical challenges with the RHIC Au+Au energy scan Grazyna Odyniec/LBNL for STAR collaboration QM 2008, Jaipur,
1 Behaviour of the Silicon Strip Detector modules for the Alice experiment: simulation and test with minimum ionizing particles Federica Benedosso Utrecht,
A search for deeply-bound kaonic nuclear states in (in-flight K -, N) reaction Hiroaki Ohnishi RIKEN.
A.N.Sissakian, A.S.Sorin Very High Multiplicity Physics Seventh International Workshop JINR, Dubna, September 18, 2007 Status of the project NICA/MPD at.
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
Light nuclei production in heavy-ion collisions at RHIC Md. Rihan Haque, for the STAR Collaboration Abstract Light nuclei (anti-nuclei) can be produced.
A. Zelenski a, G. Atoian a *, A. Bogdanov b, D.Raparia a, M.Runtso b, D. Steski a, V. Zajic a a Brookhaven National Laboratory, Upton, NY, 11973, USA b.
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
20/12/2011Christina Anna Dritsa1 Design of the Micro Vertex Detector of the CBM experiment: Development of a detector response model and feasibility studies.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
J-PARC でのハイパー核ガンマ線分光実験用 散乱粒子磁気スペクトロメータ検出器の準備 状況 東北大理, 岐阜大教 A, KEK B 白鳥昂太郎, 田村裕和, 鵜養美冬 A, 石元茂 B, 大谷友和, 小池武志, 佐藤美沙子, 千賀信幸, 細見健二, 馬越, 三輪浩司, 山本剛史, 他 Hyperball-J.
The ALICE Experiment Event by Event fluctuations ALICE TOF Calibration 30th November 2007Chiara Zampolli1.
Master thesis 2006 Shirotori1 Hypernuclear gamma-ray spectroscopy at J-PARC K1.8 beam line 東北大学大学院理学研究科 原子核物理 白鳥昂太郎.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
1 - Onset of deconfinement NA60+ - Existence (or non existence) of QCD critical point - Chiral symmetry restoration  Measuring dimuons at different energies.
Heavy stable-particle production in NC DIS with the ZEUS detector Takahiro Matsumoto, KEK For the ZEUS collaboration.
P.F.Ermolov SVD-2 status and experimental program VHMP 16 April 2005 SVD-2 status and experimental program 1.SVD history 2.SVD-2 setup 3.Experiment characteristics.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
2008 European School of High-Energy Physics - Trest, Czech Republic - 19 August - 1st September Target Tracker Data Analysis In OPERA Experiment S. Dmitrievsky,
H. Matis, S. Hedges, M. Placidi, A. Ratti, W. Turner [+several students] (LBNL) R. Miyamoto (now at ESSS) H. Matis - LARP CM18 - May 8, Fluka Modeling.
1 Activation by Medium Energy Beams V. Chetvertkova, E. Mustafin, I. Strasik (GSI, B eschleunigerphysik), L. Latysheva, N. Sobolevskiy (INR RAS), U. Ratzinger.
1 Furture of heavy ion collisions: → Fluctuations: → M.G., Frankfurt, Kielce, Why event-by-event fluctuations? Towards ideal detectors Experimental.
1 M. Gazdzicki, Frankfurt, Kielce for the NA61 Collaboration Onset of Deconfinement and Critical Point: Nucleus-Nucleus Program of NA61/SHINE Fundamentals.
K2K and JHF-nu muon monitor Jun Kameda (KEK) 1. K2K muon monitor 2. JHF-ν muon monitor 3. Summary International workshop on Neutrino Beam Instrumentation,
1 NA61/SHINE: Status and Data taking with ion beams Proposal: CERN-SPSC , SPSC-P-330 (November 3, 2006) LoI: CERN-SPSC , SPSC-I-235 (January.
Multi-Strange Hyperons Triggering at SIS 100
NA61 news and plans (May 2013-October 2013) Publications:
The Transition Radiation Detector for the PAMELA Experiment
(SHINE – SPS Heavy Ion and Neutrino Experiment)
NA61 revised beam request
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
? ? Nucleus-nucleus collisions in NA61/SHINE
EHS/NA22 Collaboration Na Li Institute of Particle Physics
A heavy-ion experiment at the future facility at GSI
How to measure E-by-E fluctuations of identified particles
Diagnostics of FRIBs beam transport line
K2K and JHF-nu muon monitor
NA61 news and plans Progress in 2010 Revised data taking
Search for the critical point of strongly interacting matter
of secondary light ion beams
Global Beam Energy Scan Global Beam Energy Scan
Viacheslav Duk, INFN Perugia
NA61/SHINE: status and energy scans with Pb+Pb collisions
NA61 status and plans Preliminary spectra for T2K 2009 run
András László (for the NA61/SHINE Collaboration)
Single trigger, no target
STAR Geometry and Detectors
A summary of world-wide test beam facilities
Tatsuya Chujo University of Tsukuba (for the PHENIX Collaboration)
CNGS Project Overview Konrad Elsener.
ACCELERATORS AND DETECTORS
Presentation transcript:

of secondary light ion beams NA61 summary of the 2010 test of secondary light ion beams MG, CERN, December 6, 2010 Test goals NA61 test set-up Results Conclusions

Test goals Test production of secondary light (B, C) ion beams at the CERN SPS (13A-158A GeV/c) needed for the NA61 physics Production of primary ion beams needed by NA61 is possible technically, but is significantly (several years) delayed due to a schedule conflict with the LHC Thus, secondary ion beams are very crucial for a timely execution of the NA61 program

NA61/SHINE at the CERN SPS Ion program of NA61/SHINE at the CERN SPS Physics goals: -search for the Critical Point of strongly interacting matter -study properties of the Onset of Deconfinement Experimental strategy: -first two dimensional scan in collision energy and size of the colliding nuclei Detector: -large acceptance hadron spectrometer, upgraded NA49 facility Beams and energies: -secondary beams: p and B at 10A, 20A, 30A, 40A, 80A, 158A GeV -primary beams: Ar and Xe at 10A, 20A, 30A, 40A, 80A, 158A GeV

Progress and plans in data taking for CP&OD Pb+Pb NA49 (1996-2002) Au+Au STAR (2008-10) NA61 ion program Xe+La 2014 Ar+Ca 2012 B+C T T T 2010/11(13) p+p p+p 158 2009/10 p+Pb 2011/12 13 20 30 40 80 158 energy (A GeV) T -test of secondary ion beams

Study the onset of deconfinement and Search for the critical point strongly interacting matter water Temperature (MeV) Baryochemical potential (MeV) critical point 1st order phase transition

Search for the onset of the horn in collisions of light nuclei Study the onset of deconfinement ? 10 20 30 40 80 158 energy (A GeV) Search for the onset of the horn in collisions of light nuclei

T µB Search for the critical point energy A Critical Point: freeze-out close to critical point, and system large enough, expected signal: a hill in fluctuations T energy Pb+Pb A µB

Secondary ion beam: basic idea H2 and NA61 test set-ups Secondary ion beam: basic idea Pb primary Pb beam from the SPS fragmentation target Pb fragments fragment separator

Secondary in beam: fragment separator The beam line is a double spectrometer with 0.04% resolution that helps to separate the ion fragments corresponding to a selected magnetic rigidity : B Target length optimized to fragment production, degrader with variable length – optimization to be determined from the tests Be 18 cm Cu 4 cm 500 m

Secondary in beam: NA61 beam test set-up Z-DET BPD-1 BPD-1 BPD-2 BPD-3 150 m S1 and S2 - scintillators for ion charge measurements A – scintillator for ion charge and mass measurements BPD – Beam Position Detectors (proportional chambers) Z – prototype of the charge trigger detector (Cherenkov: problems with radiator discovered)

Results Pb beams at 13.9A and 80A GeV/c for FT are set-up First attempts to get 80A GeV/c Pb beam in SPS Real time: several days

Test of different injections schemes and debunching were performed Nine injections One injections NA61 count on S1 per spill: 157k NA61 count on S1 per spill: 16k The NA61 rate scales approximately in proportion to the number of injections

Beam intensity is spill is strongly non-flat 13A GeV/c 80A GeV/c

Beam time structure around NA61 trigger After-pulses, rejected in the analysis

Number of beam particles surrounding a trigger particle within a given time window Scaled from 50k to 500k particles per spill on S1 A large (about 50%) of all triggered events have another beam particle within a several micro-seconds window. Flatter and longer spills are needed (a single injection cycle should significantly help)

Optimization of Pb beam on the T2 target Initial Pb beam profiles at the T2 target Horizontal Pb beam profile Vertical Pb beam profile The T2 target thickness: 2 mm After optimization the maximum beam intensity in NA61 increased by a factor of several We hope that the width of the beam at the T2 target can be still decreased and/or the target thickness increased

Tests of secondary light ion beams 80A GeV/c beams were delivered to NA61 only for several hours at the beginning of the test period, and for 30 min at the very end 80A GeV beams were delivered to NA61 only for several hours At the beginning of the test period, tests were not possible The tested 13.9 A GeV/c secondary beams (about 36 hours) are the most difficult (lowest yields and beam line stability …) among beams needed by NA61. Results presented below mainly concern the 13.9A GeV/c beams

Ion identification: charge B Be Li He

Ion identification: mass Li He Be B C O

T2 target: 18 cm Be Degrader: none Beam line: A/Z = 11/6, with energy loss correction COLL12: -10 / +20 mm He Li Be B C N O

T2 target: 18 cm Be Degrader: 4 cm Cu Beam line: A/Z = 11/6, with energy loss correction COLL12: +/- 10 mm He Li Be B C N O

T2 target: 18 cm Be Degrader: 4 cm Cu Beam line: A/Z = 11/6, with energy loss correction COLL12: -5 / -3 mm He Li Be B C N O

T2 target: 18 cm Be Degrader: 4 cm Cu Beam line: A/Z = 11/6, with energy loss correction COLL12: +8 / +12 mm He Li Be B C N O

Isotope composition Be Only single isotope (7) is seen C Two isotopes (12,11) seem to be present, possibly due to use of the long Be target

T2 target: 18 cm Be Degrader: 1 cm Cu Beam line: A/Z = 11/6, with energy loss correction COLL12: -20 / -15 mm He Li Be B C N O 20%

Beam intensity study T2 target: 18 cm Be Degrader: 1 cm Cu Beam line: A/Z = 11/6, with energy loss correction COLL12: -20 / -15 mm Carbon fraction of about 20% and can be still significantly increased by optimization of the COLL12 position/opening Carbon yield scaled to 106 particles on S1 gives 4000 C per spill The measured Carbon flux is about ten times lower than the expected one. Clearly an significant improvement can be reached by: -further optimized beam profile on the T2 target (more all-ions), -optimized beam line. -at higher energies the flux is expected (simulation) to be much higher

30 min of the beam at 80A GeV/c on December 6, 2010 Pb

30 min of the beam at 80A GeV/c on December 6, 2010 no degrader degrader

Conclusions Secondary ion beams were produced in the H2 beam line at 13A and 80A GeV/c The results of the test suggest that it is possible to reach physics requirements of NA61 The following improvements are needed before the 2011 physics run: -preparation of the SPS cycles which allow to run NA61 during the LHC fillings, -improve spill structure (make it as much as possible flat), -decrease time density of particles in spill (spills longer or less injections per spill) -more efficient use of the primary beam at the T2 target (better focus, thicker target), -dedicated instrumentation of H2 and NA61 for a fast tunning of secondary ion beams (charge measurement at high particle rates), -allow for more precise setting of the magnet currents, -allow users to check status of all relevant beam line elements (target, degrader, wobbling angle, ...) via CESAR,

Many thanks to all of you!!! (wine and cheese end-of-run meeting: today at 17:00 in 892-1-B09) Pb