International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock 2017-02-02.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
F. Savary. FSY - ColUSM #51 – Outline Mandate of the review panel Composition of review panel Programme Main outcomes/recommendations Actions.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Overview of the recommendation on LHC Splices Consolidation Frederick Bordry, head of the CERN Technology Department, has called for a series of three.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet.
11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
HL-LHC/LARP: International Review of the Inner Triplet Quadrupole (MQXF) Design Executive Committee Report International Review Committee held at CERN.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
LHC Enhanced Quench Protection System Review 24 – 26 February 2009.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 SC Link Protection A.Ballarino 28/10/2015.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
Third LHC Splices Review Production Readiness Review Introduction Why this 3 rd review ? Planning, committee, mandate Evolutions since last review: SMACC.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
Logo area Preparation meeting for the International Review of the Inner Triplet Quadruples (MQXF) for HL-LHC P Ferracin, J.Ph. Tock, E Todesco
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
Closing Session Report
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
First LHC Splice Review Introduction
News and Introduction from CERN June 15th, 2005
Cold mass design, assembly plans and QA/QC at CERN
HL-LHC IT STRING and Series test of SC link
SLHC –PP WP6 LHC IR Upgrade - Phase I.
2K Cold Box PDR Introduction
11 T Dipole Integration & Plans M. Karppinen
Equipment simplified model SMR UR safety
LHC Enhanced Quench Protection System Review
CSP 25th November 2010 Technical agreement number 3: overview
The HL-LHC Circuits: Global View and Open Questions
Circuits description and requirements
Document Plan & Milestones WP7
SPS cryogenic proximity equipment and SM18 validation
Opening Executive Session M.C.
e-lens Readiness Review Introduction
Hollow e- lens, Cryogenic aspects
Renovation of the 45-year old PS magnets
Lucio Rossi Project Leader
From Design to Installation courtesy R. Folch S. Atieh TS / MME
Powering from short circuit tests up to nominal
Circuits description and requirements - Closed Session-
Mauro Morandin & Antoine Daël
TASK 5.4 MAGNET conceptual DESIGn (preliminary) organization structure
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Detailed global view on protection and detection of the circuits
Superconducting Links and Cold Powering components for HL-LHC
TEST PLANS for HL LHC IT STRING
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Charge and Agenda of the 18th TAC meeting
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock 2017-02-02

Practical details Members of the Review Panel: 3rd – 4th of July 2017 At CERN https://indico.cern.ch/event/643197/timetable/#20170703 Monday 3.07 : [30-7-18] 8:30-9:00 : Closed session 9:00-12:30 : Presentations (with coffee break) 12:30-14:00 : Lunch 14:00-≈18:00 : Presentations (with coffee break) ≈ 19:00 Review dinner by invitation (all speakers are invited) Tuesday 4.07 : Morning : [30-7-18] Visit to 927 and SM18 Answers to questions (Make yourself available) 12:00-14:00 : Lunch Tuesday 4.07 : Afternoon: [112-2-023] 14:00-16:00 : Possible answers to questions (Make yourself available) 16:00-17:00 : Closed session 17:00 : Close out [30-7-18] Members of the Review Panel: Akira Yamamoto (KEK-CERN, Chair) Maciej Chorowski (WUT) Chen-yu Gung (ITER) Joe Minervini (MIT) Davide Tommasini (CERN) Pierre Vedrine (CEA) J.Ph. Tock - TE-MSC

Mandate and charges The High Luminosity LHC (HL-LHC) project has been approved by the CERN Council in the June 2016 session, with a financing profile covering till end of installation in 2026. For the first time the powering system is based on high current long (>100 m) superconducting lines (called Superconducting Links) employing superconductor operating in He gas, well above the usual LHe or HEII temperatures. The HL-LHC cold powering (WP6A in the Project Breakdown) is a complex system that has to enable transferring about 100 kA into the superconducting magnets of the upgraded LHC insertion magnets. The system is now in an advanced phase of design; SC links basic concept have been demonstrated about two years ago in a 20 kA - 20 m long demonstrators, while a long prototype (>60 m) of final size and current is under constructions. Other features of the system, like joint box, cold distribution box, etc. are being designed or under validation. However, due to various changes in the general powering scheme, some of them rather recent, the design of the full system still requires some time. The system must be fully designed and validated within 2018 to allow launching production of components for the final production in 2019 and 2020. The design must also live with the constraints given by the already defined technical infrastructure and integration, which at this stage cannot be substantially changed. A test of a system in Inner triplet String is foreseen in 2021-23, and installation in LHC P1 and P5 is foreseen in 2024 and early 2025. The present review has been called to examine the preliminary design, the main choices, to assess the presence of possible show-stoppers and to see if interfaces between WP3 (Magnets) and WP6B (warm powering), as well as Cryogenics and Circuit protection, are well defined. The review will cover both technical aspects and general integration, as well as the global planning. J.Ph. Tock - TE-MSC

Questions to be answered (1/2) Is the technical scope of the Cold Powering System well defined and interfaces with adjacent equipment well clarified, also regarding installation? And in particular is the design and validation of the components closely linked to the cold powering (for example: bus bars, quench detection and protection, warm powering, etc.) sufficiently defined to allow finalization of the design of the CPS? Is the general design correct and adequate to meet the scope? Is the design safe also with respect to the boundary conditions given by the magnets and circuit protection system? Is the basic design of each components or subsystem adequate to the scope with reasonable margins? For the items still under definition, is the plan to finalize the design sound? J.Ph. Tock - TE-MSC

Questions to be answered (2/2) Is the plan to complete the design, to develop demonstrators for each critical item (for example splices among different materials, cabling of many large conductors, handling of the heavy and long SC links, e.m. coupling inter-circuit at acceptable level, etc.) properly done and sound? Are any critical design and technological developments that are still missing or in severe delay? Is the test plan including the IT String test adequate (without too many details at this early stage)? Are there issues that have been neglected or underestimated? J.Ph. Tock - TE-MSC

Various While the cost and resources are not in the scope of the review (they have been reviewed by an international panel in HL-LHC C&S reviews on March 2015 and October 2016), the reviewers may comment on the level of resources allocated to design , prototyping and validations, as well as on the schedule. The review panel reports to the HL-LHC Project Leader and the panel chair is required to deliver a written report within one month after the review. Design robustness, reliability and availability are critical domains to be demonstrated J.Ph. Tock - TE-MSC

J.Ph. Tock - TE-MSC