LOLER in Residential Care Homes 27 September 2017

Slides:



Advertisements
Similar presentations
Risk Assessment. Objectives By the end of this presentation you will know: What risk assessment is; Where the need for risk assessment comes from; and.
Advertisements

COMPANY MAINTENANCE MANUAL
Managing the Health and Safety of Contractors
The Safe Use of Work Equipment. Overview This training tool is dedicated to work equipment and their associated hazards. Work equipment means any machinery,
Ron DeJuliis, Commissioner of Labor and Industry Rob McGeeney, Program Manager Larry Kreseski, Chief inspector Department of Labor, Licensing, and Regulation.
© 2010 FLTA Fork Lift Truck Safety Manage to be safe The Role of the Supervisor.
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
Pamela Simpson MCSP Moving And Handling Consultant.
Health and safety at work
Fire Safety Jonathan Harrison Fire Protection Inspector West Yorkshire Fire & Rescue Authority.
SHE Code 4: Safety and Safe Use of Work Equipment
A Guide to Fire Alarm Service and Maintenance Requirements.
ESSENTIAL SAFETY MEARURES IN BUILDINGS PRESENTED BY: BRUCE HOWIE.
WHS Management Plans.
SHE Code 26: Safe use of Lifting Equipment and Lifting Accessories Safety, Health and Environment (SHE) Group.
Risk Assessment – An Essential Standard
Hoist Slings Considerations on the management of hoist sling.
Asbestos Legal requirements in Jersey Colin Myers Director of Health and Safety.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
Section 54’s 54.Inspector’s power to deal with dangerous conditions – (1) if an inspector has reason to believe that any occurrence, practice or condition.
Lifting Operations & Lifting Equipment. LOLER 98  Lifting Equipment must be of adequate strength & stability, as must the load itself  Lifting equipment.
Unit 201: Health and safety in building services engineering
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
By Troy Budd and Kane Sharp.  Lifting Operations and lifting equipment Regulations (LOLER) came into force on the 5 th of December  The Regulations.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Managing Fire Safety In Common Parts of Flats and Mixed Use Buildings Simon Gibbins Merseyside Fire and Rescue Service.
Safety Management Standards. Introduction Health and Safety Procedures (which identify the risks, hazards and ways of mitigating these) are weak in that.
Health and Safety Executive Health and Safety Executive MANAGING CONTRACTORS Alec Ferguson HSE.
Firefighter Emergency Escape Systems New York State Department of Labor Public Employee Safety and Health (PESH)
Legal framework of telework – practical solutions for employers Dr. Jacek Męcina.
The Repairing Standard ELECTRICAL INSTALLATIONS AND APPLIANCES.
Lifting Operations and Lifting Equipment Regulations (LOLER) 1998
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
GREATER MANCHESTER FIRE AND RESCUE SERVICE The Fire Safety Order 2005 John O’Leary B.Eng (Hons) FIFireE Head of Risk Reduction.
MANAGING MANUAL HANDLING
Overview Role and function of the Authority
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
LOCKOOUT/TAGOUT THE ULTIMATE GOAL IS: To implement policies and procedures to prevent, as necessary, the release of hazardous energy from power sources--or.
Learning Engagement tool (LET)
Fire Risk Assessment Judith Evans BEng(HONS) CMIOSH
Handout 1: Health and safety at work
SAFETY OF ELEVATORS AND ESCALATORS IN BUILDINGS
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Lock Out & Tag Out.
ISO/IEC
Catherine Toozer HM Inspector of Health and Safety HSE, Carmarthen
Maintaining Safety Standards
Administration of a FIDIC Contract - Project Control
Behavioural Safety Use Of Work Equipment.
Maintaining Safety Standards
Falls from Height Window Restrictors Glass
Construction (Design and Management) Regulations (CDM) 2015
SAFE WORK INSTRUCTIONS
Temporary Works Co-ordination
AIRWORTHINESS OF AIRCRAFT
Project Development and Managing your Build Agenda
Who is Liable for a Construction Accident?
The Electricity at Work Regulations 1989
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Management of Change Report Errors to Management.
SAFE WORK INSTRUCTIONS
From AS :   Part 4— Commissioning, operation and asset management
Click to buy Frequency of Inspection/Test Low risk: Offices, Shops, Hotels, Nursing Homes Type Class I Class II insp. test insp. test Stationary 24.
Onsite Control of Visitors & Contractors
Definitions Hazard- the potential of a substance, activity or process to cause harm. They can take many forms such as chemicals, electricity or the use.
Lock Out Tag Out.
Elements of an Effective Safety and Health Program
Elements of an Effective Safety and Health Program
Welcome back to 2016 Memory Jogger – Mobil Retail M&R Activities
Presentation transcript:

LOLER in Residential Care Homes 27 September 2017 Jamie Davies BEng. (Hons.) CEng. MIMechE Principal Specialist Inspector (Mechanical Engineering)

Relevant Regulations Lifting Equipment and Lifting Operations Regulations 1998 (LOLER) Provision and Use of Work Equipment Regulations 1998 (PUWER) Management of Health and Safety Regulations 1999

Links to Guidance and ACOP’s Thorough examination and testing of lifts Simple guidance for lift owners http://www.hse.gov.uk/pubns/indg339.htm Thorough examination of lifting equipment. A simple guide for employers. http://www.hse.gov.uk/pubns/indg422.pdf Lifting Operations and Lifting Equipment Regulations 1998. Approved Code of Practice and guidance http://www.hse.gov.uk/pubns/books/l113.htm

Links to Guidance and ACOP’s Cont. How the Lifting Operations and Lifting Equipment Regulations apply to health and social care http://www.hse.gov.uk/pubns/hsis4.pdf

Passenger Lifts or Platform Lift Passenger lift has a lift car. Platform lift does does not. Passenger Lifts will serve several floors. Platform lifts generally will do two or three, but they are getting bigger. Platform lifts are slower and hold to run.

Passenger Lifts or Platform Lift Platform Lifts

Thorough Examination (TE) Report of Thorough Examination, not a Service Inspection. Think MoT not a service. Is it for 6 or 12 months? Rule of thumb 6 months as lifting people. Can be under a written scheme however, which can be more or less frequent. Insurance Cat A defect = Do not Use = Immediately Stop Using etc. Schedule 1 8. a & b

Thorough Examination (TE) Cont. Cat B is a time to be done by, e.g. 3 months. Schedule 1. 8. c Cat C is advisory and may remain over several TE’s as it isn’t A or B. Terminology isn’t set out in LOLER, hence variation on TE’s by various different Co.s Most importantly is it safe to use subject to repairing A and or B.

Need to Know Do you have a Report of Thorough Examination less than 6 months? If yes then complying with LOLER Do you have an in-service Inspection report? If yes not complying with LOLER, but could be with PUWER There should be a procedure for releasing trapped people in an emergency If it involves using an emergency key, it must be controlled and only carried out by personnel trained in its use, for emergcies

Inspection vs Thorough Examination Inspection, under PUWER, normally a service with a tick sheet. Thorough examination, under LOLER reg. 9, should look similar to schedule 1. - Does it say Report of Thorough Examination under Reg. 9 of LOLER at the top? - Does it say date of next thorough examination? - Does it show defects? Inspection – This should be done by the user and or its service provider. Simple checks like operational ones by the user and more complex checks by the service provider. They should be carried out by competent people. Thorough examinations should only be carried out by competent people who understand what a thorough examination is. They state that the machine is safe to use or will be once the defects they have identified have been dealt with.

Schedule 1 - LOLER (1) The name and address of the employer for whom the thorough examination was made. (2) The address of the premises at which the thorough examination was made. (3) Particulars sufficient to identify the equipment including where known its date of manufacture. (4) The date of the last thorough examination. (5) The safe working load of the lifting equipment or (where its safe working load depends on the configuration of the lifting equipment) its safe working load for the last configuration in which it was thoroughly examined. (6) In relation to the first thorough examination of lifting equipment after installation or after assembly at a new site or in a new location — (a) that it is such thorough examination; (b) (if such be the case) that it has been installed correctly and would be safe to operate.

Schedule 1 – LOLER Cont. (7) In relation to a thorough examination of lifting equipment other than a thorough examination to which paragraph 6 relates — (a) whether it is a thorough examination — (i) within an interval of 6 months under regulation 9(3)(a)(i); (ii) within an interval of 12 months under regulation 9(3)(a)(ii); (iii) in accordance with an examination scheme under regulation 9(3)(a)(iii); or (iv) after the occurrence of exceptional circumstances under regulation 9(3)(a)(iv); (b) (if such be the case) that the lifting equipment would be safe to operate.

Schedule 1 - LOLER Cont. (8) In relation to every thorough examination of lifting equipment — (a) identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; (b) particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; (c) in the case of a defect which is not yet but could become a danger to persons — (i) the time by which it could become such a danger; (ii) particulars of any repair, renewal or alteration required to remedy it; (d) the latest date by which the next thorough examination must be carried out; (e) where the thorough examination included testing, particulars of any test; (f) the date of the thorough examination. (9) The name, address and qualifications of the person making the report; that he is self-employed or, if employed, the name and address of his employer. (10) The name and address of a person signing or authenticating the report on behalf of its author. (11) The date of the report.

LOLER/PUWER which do I need? Both are needed, it isn’t either or. LOLER is often done by insurance companies, but it can be done by a service company (MoT). If a service company does the Thorough Examination they can be checking their own work and or not documenting issues seen/ repaired at service on a TE. If a service company states do not use, it isn’t the same as a TE with an immediate, cat A or do not use note. No TE issued and won’t be sent to HSE/LA.

Can the Care Home do the Work? PUWER covers a service inspection and possibly some maintenance. This maybe within the capability of the care home. More often fulfilled by a 3rd party maintenance company. LOLER TE Rarely available within care home staff, but can be provided by the insurance company or a maintenance company.

Current Issues Thorough Examinations-Lack of Installation and Maintenance-Lack of or poor Allowing use when Unsafe-accessing lift with the emergency key routinely

When Enforcement can happen A TE is needed for the lift to be used safely at work (<6 months). This could attract an Improvement Notice (IN) or Prohibition Notice (PN). Servicing must be done by the home, or a contractor, to ensure continued safe use during use. IN if not and in use. If the equipment is in use and has obvious defects and no TE - PN. No maintenance, or TE, equipment looks in a poor condition and in use – PN. TE overdue by 1 month IN. If the equipment is not in use then this will not attract enforcement.

Enforcement Cont. TE present with repair of, within 3 months, not repaired/replaced at 4-6 months. IN/PN. A floor has a defective door lock it has been locked and signed not for use, but other floors are being used. No action necessary unless defective floor being opened routinely, then a PN on the procedure.

Other LOLER Items Stairlifts under LOLER 6 month or written scheme Patient Hoists and Bath Hoists Under LOLER – 6 Months or WS Patient Slings Under LOLER – 6 Months If it doesn’t leave the ground LOLER unlikely to apply, but exceptions are present like stairlifts for e.g.

Standards BS EN 81 series: BS EN 81-1 Electric Lifts BS EN 81-2 Hydraulic Lifts Replaced by BS EN 81-20/50 for both 2014 BS EN 81-41 Platform Lifts, under revision

LOLER, Yes/No Stairlift Yes Platform Lift Passenger Lift Bath Hoist

LOLER, Yes/No Patient Hoist Yes Patient Sling Standing Aid

LOLER, Yes/No Lifting Cushion No Profiling Bed Riser Chair Riser to Sitting position

Questions?