When should you fix a stream????

Slides:



Advertisements
Similar presentations
Lowermost Pajaro left-bank bench vegetation just downstream from Thurwatcher Bridge.
Advertisements

Characteristics of High Gradient Streams
Riparian Zone Habitat Assessment Vegetation and More.
MONKEY RUN, ARCADE, NY. HISTORIC RAILROAD PROTECTION & DEMONSTRATION PROJECT, 41 METHODS AND TECHNIQUES IN COMBINATION.
In-Stream Habitat Survey
Rock Riffle Design Course
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
SAND THE FOOT OF KANOPOLIS DAM, KANSAS Let’s build Engineered Rocked Riffle #5 the most upstream of the five riffles that will be constructed.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
Mitigation Categories 3 and 4 February 15,  Reminders:  Mitigation Category 3  WWH – GHQW  CWH – Inland Trout Streams  Class III PHWH  Mitigation.
The Mission Reach Ecosystem Restoration Project: Floodplain Management Within a Multi-Objective Project Paradigm Steven Schauer San Antonio River Authority.
Lewis Creek Reach M19 Phase 1, Phase 2, and Phase 3.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Streams and Rivers.
Yonggil River - 2D Proposed Design. Water Depth Froude #
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
Project Activity: Riparian Zone Restoration Scott Compton, Watershed Program Manager Valles Caldera National Preserve.
Channel Modification Washington Dept. Forestry, 2004, Channel Modification Techniques Katie Halvorson.
THE CHANNEL EVOLUTION MODEL (CEM), CHANNEL INCISION, FLOODPLAIN BENCHES, & CAN STREAMS REPAIR THEMSELVES?
Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University BAE 579: Stream Restoration Lesson.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.  Bank erosion is threatening a farm road  NRCS –Environmental Quality Incentives Program {EQIP} cost.
LOCKED LOGS (LL). THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
 Four measures related to channel condition  Sinuosity (pool formation)  Pool/Riffle Development  Channel Modification  Channel Stability.
Coos Watershed Association Watershed Restoration Projects.
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
An Experience In Conducting A Longitudinal Profile… A Study of the Response of San Pedro Creek to the US Army Corps of Engineers (USACE) Flood Control.
Additional Primary Headwater Habitat Stream Parameters.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
McKinstry Creek, Delevan, NY This was a complete stream and floodway realignment. Constructed June-July The stream had been straightened prior.
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
Hangman Creek Fisheries Enhancement BPA Project & Hangman Restoration Project: Wildlife BPA Project
Design and Implementation of Large Wood Structures at Twelvemile Creek Prince of Wales Island Tongass National Forest The Nature Conservancy TEAMS Enterprise.
Qualitative Habitat Evaluation Index Bradley Hansen John Nieber Department of Bioproducts and Biosystems Engineering For BBE 4535/5535 Fall 2011.
McKinstry Creek NYS DOT Mitigation Project STREAM & RIPARIAN COORIDOR RESTORATION, WETLAND REWETTING, VERNAL POOLS, “RPM” PLANT EXPERIMENTAL TEST PLOTS,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
Bitter Creek Stream Restoration Preliminary Engineering Report Neighborhood Meeting.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
Half-Drowned Bushes with Traffic Control Stones & additional plantings.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
Headcut gets taller & ACM mat flips out of the upstream key trench of the downstream pipe crossing, which causes problems. Project.
GRADE CONTROL.
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
ONONDAGA CREEK, NEAR SYRACUSE, NY
VINES – THE OVERLOOKED RESTORATION TECHNIQUE
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
Power of a Rain drop.
Fluvial Geomorphology
VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
Stream Geomorphic Assessment of Allen Brook
Water Testing Project for the North Fork River
River Systems Part 2 Features of a Meandering River Levees
Jason Throneberry Aquatic Ecologist.
CHESAPEAKE BAY BASICS.
CHESAPEAKE BAY BASICS.
Milltown Phase II Draft Restoration Plan
Iowa’s River Restoration Toolbox Level 1 / Base Training
Module # 8 Channel Evolution Implications & Drivers of Instability
When should you fix a stream????
Longitudinal Profile Survey for Successful Culvert Replacement
Guadalupe Williams Pipeline Crossing, South of Victoria, TX
Presentation transcript:

When should you fix a stream???? Let’s look closer at this one

Susquehanna River with Interstate 88 at top of slope

McKinstry Creek existing planform, three bends and 2 crossings over 540 ft of length. Only one good habitat pool. Note 300 ft long straight stretch.

McKinstry Creek near Delevan, NY, 5-18-2006, flow left to right New channel planform (blue line)

(Elton Creek, Freedom, NY) Looking DS, Elton Creek, Freedom, NY. Floodplain on both sides has been filled, stream straightened. At 30 ft wide no habitat pools, when stream is 20 ft wide 2 ft deep pools with 40-50 trout per pool!! What should we do??? (Elton Creek, Freedom, NY) Looking Downstream Photo by Maureen Mayer

What do we do here???? (North Carolina)

What about here?? (North Carolina)

What about this stream?? (West Virginia)

Same Stream (West Virginia) Straightened Incised Over - widened Very little pool-riffle-pool Very little wood in stream or high quality aquatic habitat (cover, depth, etc) Single row of ageing veg as riparian corridor Same Stream (West Virginia)

Same Stream (West Virginia) Lots of room in the valley

Abandon channel, start fresh!! Transform old channel into connected wetland cells Abandon channel, start fresh!! Use dirt from new channel to create wetland cells in old channel (maximize diversity) Use some old veg for LWD in new channel Plant all riparian areas (shade, wildlife, pollinators) Maximize all stream functions New stream channel with all bells & whistles

Active headcut. Do which first, bank stabilization Active headcut. Do which first, bank stabilization? Or grade stabilization????

This is where the headcut has been

Stream cutting into a tall unstable bank

Bob’s Creek. Where to start??

House here What about this one??

In stream restoration “you have to have that brain thing going on !!

QUESTIONS????