OptiFrame WP1: Project Management

Slides:



Advertisements
Similar presentations
Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
Advertisements

1 CARE-ASAS Action Plan Francis Casaux CARE-ASAS Action Manager on behalf of EUROCONTROL.
Project L.O.F.T. Report May 2007 through October 2007 Creating a design to meet stakeholder desires and dissolve our current set of interacting problems.
CIRAS PROJECT OVERVIEW
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
BIOMASS FUTURES: Biomass role in achieving the Climate Change & Renewables EU policy targets. Demand and Supply dynamics under the perspective of stakeholders.
Enterprise Architecture
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
SESAR Single European Sky Air traffic management Research
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
David Bowen Head of ATM Operations and Systems
3 – 4 September 2015 Delhi, India Piyawut Tantimekabut (Toon)
CLARIN work packages. Conference Place yyyy-mm-dd
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
Presentation of the TITAN project for the stakeholders.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
Recent Developments of the PEFA Program Video-conference of the PEMPAL BCOP PEFA Working Group February 20, 2009 Frans Ronsholt Head of PEFA Secretariat.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Kathy Corbiere Service Delivery and Performance Commission
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
Future outlook and next steps for ESPON The ESPON 2013 Programme OPEN DAYS Bruxelles, 10 October 2007.
Implementation plan for Strategic Research and Innovation Agenda for Traditional Food Prof. Đuro Kutlača, PhD Institute “Mihajlo Pupin”, University of.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
PUBLIC FINANCE IN THE REPUBLIC OF MOLDOVA: REFORMS AND THE DEVELOPMENT STRATEGY PLENARY SESSION OF THE TREASURY COMMUNITY OF PRACTICE JUNE 1-3, 2015, KISHINEV,
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision SAFETY ASPECTS SAFETY ASPECTS  Juan Vázquez,
Monitoring Visit to NatRisk Project
Building an ENI CBC project
Economic issues Formulation of Business cases H. Sudarshan
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Collaborative Decision Making (CDM) Saulo Da Silva
COmbining Probable TRAjectories — COPTRA
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Development and Energy in Africa
Introduction of TBO within OptiFrame
Integrated Management System and Certification
Introduction - Final activity reporting
OptiFrame WP6: Overview, status and contents
WP1 – Smart City Energy Assessment and User Requirements
Interreg V-A Romania-Bulgaria Programme
OPTIFRAME : Project Overview
TechStambha PMP Certification Training
OptiFrame WP7: Implications for Decision Makers and Dissemination of results LANCASTER UNIVERSITY Centre for Transportation Systems and Logistics (CENTRAL)
Work Package 3 Data Management
OptiFrame WP2: State-of-the-art and Stakeholders Expectations
Software Requirements
Application Form Sections 4-9 Christopher Parker & Kirsti Mijnhijmer 28 January 2009 – Copenhagen, Denmark European Union European Regional Development.
ATFM IMPLEMENATION IN INDIA – FUTURE PLANS
MAES Working Group Meeting Brussels
London 14 October 2015 Freek De Witte Head of Stakeholder Relations
ASSTAR Project Overview & User Forum Objectives
The Single European Sky Implementation Programme: SESAME
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
RECARE set-up Rudi Hessel on behalf of coordination team
Helene Skikos DG Education and Culture
Albania 2021 Population and Housing Census - Plans
ESS.VIP ADMIN EssNet on Quality in Multi-source Statistics, progress report 19TH WORKING GROUP ON QUALITY IN STATISTICS, 6 December 2016 Fabrice Gras,
Reportnet 3.0 Database Feasibility Study – Approach
The approved ESPON 2013 Programme
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
Presentation transcript:

OptiFrame WP1: Project Management Lancaster University Centre for Transportation Systems and Logistics (CENTRAL) Lancaster, March 24th 2017

Table of Contents Project Objectives Expected Project Outcome Project Structure Project Schedule Current Project Status WP1 WP2 WP3 WP4 WP5 WP6 WP7 Concluding Remarks

Project objectives (1/2) Main objective Application of principles of mathematical modelling and optimization to configure and assess the performance of the Trajectory Based Operations (TBO) concept. Viability of the concept Major issues (e.g., barriers, constraints, stakeholders’ expectations, etc.) Whether and to what extent the objectives of flexibility of airspace users and predictability of the ATM system can be achieved 3

Project objectives (2/2) Research questions How TBO aligns with SESAR Master Plan? What are the barriers, enablers and potential benefits from the TBO concept implementation? How stakeholders priorities and preferences can be incorporated into mathematical models? What are the scalability issues associated with the development and implementation of these models and algorithms? 6

Expected Project Outcome (1/4) Development of a framework to address the identified objectives and provide guidance to decision makers on the potential and conditions of deployment of the TBO concept. This framework, consisting of mathematical models, solution algorithms and conditions of applicability, can be used: as a “simulator” to fully understand the benefits and limitations of the TBO approach; to investigate trade-offs between different competing objectives relevant to the TBO concept ; as an engine for the preliminary identification, on a daily basis, of promising ATM interventions regarding the ECAC-wide area. 4

Expected Project Outcome (2/4) Innovative aspects of the proposed approach It explicitly takes into account the route preferences and flight criteria and priorities of the airspace users. Holistic view of the ATM system (by considering all ATM system components for the entire ECAC area). 5

Expected Project Outcome (3/4) Expected project impact Project impact will be assessed in relation to ICAO’s KPIs Capacity Access & equity Cost effectiveness Efficiency (environment) Flexibility Predictability 7

Expected Project Outcome (4/4) Expected impact on SESAR target concepts Moving from airspace sectors to 4D Trajectory Management Traffic Synchronisation Network Collaborative Management and Dynamic Capacity Balancing Airport Integration and Throughput 8

Project Structure (1/2) Project work breakdown (WPs) WP1 Project Management [ULANC] WP2 State-of-the-art and Stakeholder Expectations [CFR] WP3 Data Management [CFR] WP4 Modelling of TBO [ULANC] WP5 Development and Implementation of Solution Algorithms (exact and heuristic) [ULANC] WP6 Validation of the OptiFrame approach in normal and disturbance cases [NLR] WP7 Implications for Decision Makers and Dissemination of results [EUROCONTROL] WP8 Ethics requirements [ULANC] 9

Project Structure (2/2) Interrelation of project activities WP5 Development & Impl. of Algorithms WP1 Project Management WP2 State-of the-art and Stakeholder Expectations WP3 Data Management WP4 Modelling TBO WP6 Validationon of OptiFrame Approach WP7 Implications for Decision Makers and Dissemination 11

Project Schedule 10

Current Project Status 12

Project Schedule Mid-term review 10

WP1: Project Management Objectives: To develop and implement a project management plan, To carry out the overall administrative and financial project management, To manage contacts with SESAR JU and European Commission, To manage the new knowledge generated by the project, To monitor quality and ensure timely delivery of project results, To establish effective internal and external communications procedures, To coordinate the interaction of the project with all relevant stakeholders, To develop and implement a project risk management plan.

WP1: Project Management Status: ongoing Resources: Output: D1(D1.1): Project Management and quality plan – submitted and approved. 1st YEAR 2nd YEAR Partners Effort available Effort used Effort TOTAL ULANC 5.00 2.64 2.36 NLR -- ECTRL CFR

WP2: State-of-the-art and Stakeholder Expectations (1/2) Objectives: To review the current state of development of the TBO concept, To review the state-of-the-art Air Traffic Flow Management (ATFM) literature, Consultation with the ATM stakeholders (NM, ANSP, AU) to identify their expectations, preferences and priorities in relation to the TBO concept. Status: completed 13

WP2: State-of-the-art and Stakeholder Expectations (2/2) Resources: Output: D7(D2.1): Technical report reviewing the state of the art on ATFM – submitted and approved, Stakeholders’ Workshop – successfully organized. 1st YEAR 2nd YEAR Partners Effort available Effort used Effort TOTAL ULANC 4.00 3.25 0.75* NLR 1.00 2.50 -1.50* ECTRL 2.00 0.90 1.10* CFR 0.00 14

WP3: Data Management (1/2) Objectives: Goal: provide ATM instance data required by the OptiFrame Tools for testing and validation purposes Expected output: Data Management Platform (DMP). Routines for data extraction and for the generation of ATFM algorithms input data [MS5, D3.1] Tasks 3.1: Design of the DMP. Analysis of requirements and data sources, modular design of DMP. 3.2: Implementation of DMP. Basic data extraction routines, procedures for instance generation. Task 3.3: Validation of DMP. Cross-checking instance coherence. Execution of ATFM instances. Status:

WP3: Data Management (2/2) Resources: Output: Modular design of the DMP [MS3 – 08/16] – completed, Implementation of the initial DMP [MS4 – 10/16] – completed, Implementation of the final DMP and DMP validation [MS5 – 02/17] – first version completed, D8(D3.1): Routines for data extraction and for the generation of ATFM algorithms input data – submitted (February 2017), Integration test and execution of ATFM instances for Optiframe validation – ongoing. 1st YEAR 2nd YEAR Partners Effort available Effort used Effort TOTAL ULANC -- NLR ECTRL 0.50 0.10 0.40 CFR 10.00 8.00 2.00

WP4: Mathematical models for TBO (1/2) Objectives: Task 4.1: Develop trajectory based optimisation models for the ATM system. Task 4.2: Model the ATM stakeholders’ preferences and priorities. Status: completed 17

WP4: Mathematical models for TBO (2/2) Resources: Output: D9(D4.1): Mathematical model for TBO – submitted (28th February 2017). 1st YEAR 2nd YEAR Partners Effort available Effort used Effort TOTAL ULANC 11.00 8.21 2.79* NLR 4.00 0.00 ECTRL 0.50 0.30 0.20* 0.5 CFR 2.00 18

WP5: Solution algorithms (1/2) Objectives: Design and implementation of heuristic algorithms Work performed so far: initial implementation of a simple heuristic Design and implementation of exact optimization algorithms implementation of the model to be solved using commercial solvers, formulation of the column-generation version of the problem Computational comparison of the algorithms Status: ongoing

WP5: Solution algorithms (2/2) Resources: Output: D10(D5.1): Heuristic algorithm for TBO model (30 June 2017), D11(D5.2): OptiFrame computational framework (31 October 2017). 1st YEAR 2nd YEAR Partners Effort available Effort used Effort TOTAL ULANC 19.00 1.52 17.48 NLR 4.00 0.00 ECTRL -- CFR 1.00 0.30 0.70

WP6: Validation of the approach (1/2) Objectives: Task 6.1: Identification of disturbances and operational scenarios of TBO Task 6.2: Qualitative assessment of OptiFrame models in normal and disturbance cases In progress Task 6.3: Assessment of the OptiFrame computational framework in normal and disturbance cases Status: ongoing 21

WP6: Validation of the approach (2/2) Resources: Output: D1(D6.1): Disturbances and operational scenarios for TBO – submitted (January 2017), D13(D6.2): Qualitative assessment of OptiFrame models in normal and disturbance cases – in progress (30 JUN 2017), D1(D6.3): Detailed assessment of OptiFrame models in normal and disturbance cases (31 JAN 2018). 1st YEAR 2nd YEAR Partners Effort available Effort used Effort TOTAL ULANC 1.00 0.00 NLR 9.00 2.50 6.50 ECTRL 0.50 0.15 0.35 CFR 2.00

WP7: Implications and dissemination of results (1/2) Objectives: Task 7.1: Setting up of the project website Task 7.2: Dissemination of results in progress Task 7.3: Implications for the Decision Makers Task 7.4: Organization of a workshop Status: ongoing

WP7: Implications and dissemination of results (2/2) Resources: Output: D16(D7.1): Project Web Site Initial set up – completed and approved Updating website – continuous activity, D17(D7.2): Final Project Results Report (December 2017). 1st YEAR 2nd YEAR Partners Effort available Effort used Effort TOTAL ULANC 1.00 0.72 0.28 NLR 0.00 ECTRL 1.50 CFR 0.20 0.80

WP8: Ethics requirements Objectives: To ensure compliance with the ethics requirements set out in this work package Status: ongoing Output: D8.1: POPD – Requirement No. 3 – submitted and approved. D8.2: POPD – Requirement No. 1 – submitted and approved.

Concluding remarks Work has been performed and delivered according to schedule, All submitted deliverables have been accepted, The dissemination activity has been satisfactory and will be intensified in the second year, Work has been performed without exceeding resources Some transfer of resources from WP4 to WP1, WP5 and WP7 is foreseen.

Thank you very much for your attention! OptiFrame Project Management Thank you very much for your attention!