NG Strawman – Ofgem Response

Slides:



Advertisements
Similar presentations
Mod 0260 Post-Emergency Claims: Implementation Update Transmission Workstream - December 2009.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
3 June 2010 energynetworks.org 1 SPEN Pre 2005 DG Draft Modification Report currently with Ofgem Proposed methodology for charging pre April 2010 EHV generators.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
Xoserve Services Workgroup. xoserve Funding Arrangements - Model Comparison ModelKey Benefits User Pays Model AUser Pays Model B Baseline Services (Core)
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
10 November 2015 GAZ DE FRANCE ESS Modification Proposal 0086 “Introduction of gas demand management reserve arrangements” 1 st June 2006 Phil Broom and.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
Supplier Energy Theft Scheme 10 th August Introduction The following slides are only intended as a strawman proposal on how a Supplier Energy.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 To re-define the Aggregate Reconciliation Period to reflect the period to which the charge relates.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Modification 0232 Presentation for Total By Gareth Evans.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
European Developments Transmission Workgroup 3 rd May 2012.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
SoS Report PAC – 13th December 2016.
Loss of Mains Protection on DG Rectification Programme
Background Current balance of LDZ System and Customer charges
Public Consultation : main conclusions (1/2)
Gas System Operator Incentive Review
Conclusions STC Core Group 8 September 2009 The Hague
Review Group 291- Ofgem Update
Review of UNC Section Q “Emergencies”
UNC Modifications 061 & 062 – An Overview
UNC Modification Proposal 0373
Kick-off meeting of the project UMBRELLA
Pay for Performance Regulation
Incentives 26 September 2018.
NG Strawman – Ofgem Response
NG Strawman – Ofgem response
Action: DX0602 Xoserve; to look to provide performance related data appertaining to the confirmations / reconfirmations process. The following values are.
Code Administration Code of Practice
Gas Security of Supply SCR Proposals: Credit Implications for the GB Gas Market Introducing a new Transmission Workgroup Topic 4 October 2012.
Transmission Workgroup June 7th 2012
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
Joint Office Presentation for Modification 0678
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – User Pays Options Review Group August th November.
Review Group 291- Ofgem Update
Ritchard Hewitt – September 2010
Mod Proposal 0268 : AQ Backstop Date
Meeting Friday 13th September 2013 Hayley Burden
EU Balancing Code – Mod 494 Imbalance Charge Amendments
Mark Freeman 29th January 2007
Entry Overrun Calculation
Options for the Development of a Demand Side Response Mechanism
Ofgem presentation to Gas Transmission Workstream
Code Modification Proposal No 0315
UNC Modification Performance Assurance Framework Incentive Regime
195AV “Future work” – system flexibility
Commercial Arrangements For Gas Quality Service – Introduction
MOD 565 Standards of Service
UNC MOD 213: USER PAYS GOVERNANCE ARRANGEMENTS
Modification Proposal 136
Mod565 TSL8 - Nominations Referred Calculations
30th November 2007 Beverley Grubb SGN
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

NG Strawman – Ofgem Response Review of Emergency Claims Arrangements, 16 March 2009

Issues to Consider Should there be a deadline for placing offers on the OCM? Is there an incentive to wait until the end of the day to place offers? When would claims be submitted and paid? Might the three month cost recovery process deter shippers from sourcing additional gas? On what basis are claims assessed? No single model (FSC, Black Start, Network Code Modification Proposals) upon which to base changes Should claimants be paid for losses incurred or according to a “market value” of gas? Recommend a working group is established to develop proposal/guidelines

Issues to Consider How will the costs of emergency claims be calculated? Would offers on the OCM be adjusted by the frozen SAP? Should short shippers be targeted with the marginal or average cost of validated claims? What is appropriate level of incentive?