Active Data Management in Space 20m DG

Slides:



Advertisements
Similar presentations
best practice project management methodology ©Platinum Services Group Limited What is XPRODi ?
Advertisements

Configuration Management
The OAIS experience at the British Library Deborah Woodyard Digital Preservation Coordinator ERPANET OAIS Training Seminar, Nov 2002.
Digital Preservation - Its all about the metadata right? “Metadata and Digital Preservation: How Much Do We Really Need?” SAA 2014 Panel Saturday, August.
Chapter 3 Project Initiation
SCIDIP-ES Components Oct ,Brussels. Basic Preservation Strategies Often stated as: “Emulate or Migrate” OAIS concepts change these to: Add Representation.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
An Overview of Selected ISO Standards Applicable to Digital Archives Science Archives in the 21st Century 25 April 2007 Donald Sawyer - NASA/GSFC/NSSDC.
Project Management Fundamentals Project Organization and Integration
MDC Open Information Model West Virginia University CS486 Presentation Feb 18, 2000 Lijian Liu (OIM:
David Giaretta Associate Director (Development) Funders: DCC Development Digital Curation Centre a centre of expertise in data curation and preservation.
Database Systems COMSATS INSTITUTE OF INFORMATION TECHNOLOGY, VEHARI.
Reference Model for an Open Archival Information System (OAIS) ESIP Summer Meeting John Garrett – ADNET Systems at NASA/GSFC ESIP Summer Meeting.
Preservation Strategies: Intro to the OAIS Reference Model Curt Tilmes NASA Version 1.0 Review Date.
Chapter 6 Supporting Knowledge Management through Technology
CRM Prep Workshop Part 4 Records Appraisal, Retention, Protection and Disposition.
Illustrations and Answers for TDT4252 exam, June
Producer Questions 6 December Producer Questions 2 Purpose The SIP standard envisions the development of a formal model of the data for.
Digital Preservation: Current Thinking Anne Gilliland-Swetland Department of Information Studies.
C. Huc/CNES, D. Boucon/CNES-SILOGIC, D.M. Sawyer/NASA/GSFC, J.G. Garrett/NASA-Raytheon Producer-Archive Interface Methodology Abstract Standard PAIMAS.
FEA DRM Management Strategy Presented by : Mary McCaffery, US EPA.
Archival Workshop on Ingest, Identification, and Certification Standards Certification (Best Practices) Checklist Does the archive have a written plan.
PREMIS Implementation Fair, San Francisco, CA October 7, Stanford Digital Repository PREMIS & Geospatial Resources Nancy J. Hoebelheinrich Knowledge.
MODEL-BASED SOFTWARE ARCHITECTURES.  Models of software are used in an increasing number of projects to handle the complexity of application domains.
Metadata By N.Gopinath AP/CSE Metadata and it’s role in the lifecycle. The collection, maintenance, and deployment of metadata Metadata and tool integration.
Foundations of Information Systems in Business. System ® System  A system is an interrelated set of business procedures used within one business unit.
May 2007 Registration Status Small Group Meeting 1: August 24, 2009.
Software Requirements Specification Document (SRS)
Lifecycle Metadata for Digital Objects November 15, 2004 Preservation Metadata.
Possibilities for Social Tagging in a VR Collection Jenn Riley Metadata Librarian Indiana University Digital Library Program.
Active Data Management Plans (ADMP) - Helen Glaves British Geological Survey.
1 Active Data Management Plans (ADMP) Interest Group -
International User Group Information Delivery Manuals: Exchange Requirements Courtesy:This presentation is based on material provided by AEC3. Contact.
Phase-1: Prepare for the Change Why stepping back and preparing for the change is so important to successful adoption: Uniform and effective change adoption.
CESSDA SaW Training on Trust, Identifying Demand & Networking
Iterative Risk Management Workflow Tool
Workplace Projects.
Component and Deployment Diagrams
Dependency Management
OAIS Producer (archive) Consumer Management
Project Management (x470)
Exercise: understanding authenticity evidence
Persistent Identifiers Implementation in EOSDIS
The Systems Engineering Context
IEEE Std 1074: Standard for Software Lifecycle
Instructional Design Gibran Carter.
C2CAMP (A Working Title)
Campus Locator – Definition Phase (May04-04)
Outline Pursue Interoperability: Digital Libraries
Defining the Activities
Software Project Management
Data Management: Documentation & Metadata
Service-centric Software Engineering
Meeting LIS Competences to Serve Inclusive Community through Curriculum: Case Study in LIS Study Program UIN Sunan Kalijaga Yogyakarta Indonesia Marwiyah.
Introduction to Research Data Management
Logical information model LIM Geneva june
Health Ingenuity Exchange - HingX
Metadata for digital long-term preservation
Project Management Process Groups
The Generic Statistical Information Model
Archives and Records Professionals for Research Data IG
Lecture 1 File Systems and Databases.
An Open Archival Repository System for UT Austin
Open Archival Information System
Metadata The metadata contains
Subject Name: SOFTWARE ENGINEERING Subject Code:10IS51
Time Scheduling and Project management
Template for methodological application
Research Data Dr Aoife Coffey, Research Data Coordinator
Gender Training Workshop Name of Institution Place Date
Presentation transcript:

Active Data Management in Space 20m DG The group that produced OAIS and related standards are working on one which is closely aligned with the ADMP work. It should lead to an ISO standard which defines terms and concepts relevant to ADMP The RDA-ADMP group work will be able to build on this

CCSDS/ISO related work There is a well-recognized need to capture digital information associated with a great variety of endeavours in virtually all areas of society. However it is widely recognized that many such endeavours are not able, for one reason or another, to leave a sufficient legacy of information so others can reuse and fully leverage the effort that has gone into the endeavour. The purpose … is provide guidance for projects about the Additional Information that needs to be captured and/or generated, and retained in order to ensure that the information created by the project, either as part of its main objectives, or as a by-product of achieving those objectives, can be exploited over the long term. …. deals with the aspects of a project, in particular the terminology used. Many of these terms are already used with various definitions within the target communities for this standard – e.g. space, science, records management and archival communities. It is expected that other communities can easily map this terminology to the terminology used within those communities. The OAIS Reference Model provided a starting point and inputs from a variety of other sources were used to arrive at the terms used within this standard. Aim to do the following: identifies the data and Additional Information to be collected or improved at various points; forms a basis for the specification of Data Management Plans forms a basis for the identification and/or development of additional standards and implementation guides including those that address particular concerns in more detail; forms a basis for identification and/or development of a set of software tools that will assist the development, operation and checking of the different parts of the project.

Many models – why another? See http://blogs.loc.gov/digitalpreservation/2012/02/life-cycle-models-for-digital-stewardship /

Data Lifecycle Models and Concepts by CEOS, 2012, see http://www. ceos …and more

Project Management Body of Knowledge (PMBOK) concepts Planning Processes Initiating Processes Closing Processes Executing Processes Monitoring and Controlling Processes

Example of project with three phases Project Phase 1 Project Phase 2 Project Phase 3 Example of project with three phases

OAIS Archival Information Package Logical container for everything needed for Long Term Preservation

Additional Info. to collect/update at each type of process – some examples  [MC1]What are you trying to say here?  [DG2]Needs discussion – I meant that the funders may not be experts in the subject yet may need to check quality Additional Information Topic Detailed area Initiating Planning Executing Closing Content Data Inventory of data produced/ expected Rough idea Increasingly detailed Becoming complete Complete Types of data (raw, processed, etc.) which should be preserved? Type of data e.g. images, tables – which generic interfaces? Volume that would require preservation Quality constraints Quality checks which may be performed on the data by non-experts  

Additional Information Topic Detailed area Initiating Planning Executing Closing Representation Information Choice of data format Rough idea Increasingly detailed Becoming complete Complete Format definitions and formal descriptions Up to date and accumulating Semantics of the data elements Almost complete Data dictionaries and other semantics Information Model Other Data Documentation Applicable standards Hardware and Software Dependencies Up to date and accumulating Other software which may be used on the data   Growing Calibration and system test tools and system test data that will be delivered. Relationships between data items

Additional Information Topic Detailed area Initiating Planning Executing Closing Reference Information DOI or other unique identifiers Rough idea Becoming complete Up to date and accumulating Up to date and accumulating; New methods could be introduced Rules, methods, tools for referencing data Up to date and accumulating Up to date and accumulating; New methods could be introduced What standards will be used to format, identify and reference the data and metadata What may be used in future to identify the Information Fairly firm Increasingly detailed Evolving

Additional Information Topic Detailed area Initiating Planning  [MC1]CRIS?  [MC2]What does this mean?  [MC3]What does this mean? Additional Information Topic Detailed area Initiating Planning Executing Closing Provenance Information Record of origins of the project e.g. in a CRIS  system Fairly firm Complete Completed Documentation about the hardware and software used to create the data, including a history of the changes in these over time   Rough Idea then Increasingly detailed Becoming complete Up to date and accumulating Processing workflow Rough idea Increasingly detailed Processing inputs Processing parameters Who was responsible for each stage of processing When each stage was performed Becoming complete Record of any special hardware needed Calibration System Testing Up to date and accumulating Up to date and accumulating; New methods could be introduced Resident Archives  Who was responsible for each stage of processing (Fixity) 

Additional Information Topic Detailed area Initiating Planning Executing Closing Issues Outside the Information Model Schedule of deliveries Fairly firm Increasingly detailed Complete   Cost Complete, but may Evolve Pointers to the components to be transferred to the archive Potential preservation aims of the archive Rough idea Potential risks to preservation and exploitation of the data The target archives and designated community for the solicitation. The budget for archiving. Complete, but may Evolve The schedule for major project milestones and deliveries to the archive. Change Management The mechanism for communication between project and archive.

Relationship between standards

Relationship to RDA ADMP CCSDS document would define terminology and basic concepts which are consistent with OAIS etc would become an ISO standard RDA ADMP can contribute to the review of the document and example cases could/should use ISO terms and concepts to define exchange formats and semantics for plans – ideally machine processable specify/collect/implement tools to create the Additional Information reach out to funders, data creators and archives

DISCUSSION