Adriana Rossi, Sergey Sadovich

Slides:



Advertisements
Similar presentations
WG 4: High Power Proton Accelerators S. Holmes, J. Thomason PASI Collaboration Meeting April 3-5, 2013.
Advertisements

Heat load due to e-cloud in the HL-LHC triplets G. Iadarola, G. Rumolo 19th HiLumi WP2 Task Leader Meeting - 18 October 2013 Many thanks to: H.Bartosik,
Modelling of diagnostics for the ISIS ring Ben Pine, Chris Warsop, Steve Payne.
Low energy electron beam as a nondestructive diagnostic tool for high power beams. P. Logachev, D. Malutin, A. Starostenko, BINP, RUPAC’2006, Novosibirsk.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
AAC 2006V.Shiltsev 1 Electron beam generation and control in Tevatron Electron Lenses Vladimir Shiltsev, R.Hively, V.Kamerdzhiev, G.Kuznetsov, H.Pfeffer,
October 4-5, Electron Lens Overall Design Alexander Pikin October 4, 2010 Electron Lens.
Low Emittance RF Gun Developments for PAL-XFEL
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Overview of ERL MEIC Cooler Design Studies S.V. Benson, Y. Derbenev, D.R. Douglas, F. Hannon, F. Marhauser, R. A Rimmer, C.D. Tennant, H. Zhang, H. Wang,
CLIC meeting, Prospects for developing new tubes I. Syratchev, CERN.
CLIC Project meting #16. June 2014 I. Syratchev High efficiency power sources I. Syratchev, CERN.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Overview of Electron Cooling Activities at FNAL Thomas Kroc Fermilab – Electron Cooling EIC 2004 March 15-17, 2004 Jefferson Lab.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
RF source, volume and caesiated extraction simulations (e-dump)
Christopher Gerth DL/RAL Joint Workshop 28-29/4/04 Modelling of the ERLP injector system Christopher Gerth ASTeC, Daresbury Laboratory.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Progress of Bunched Beam Electron Cooling Demo L.J.Mao (IMP), H.Zhang (Jlab) On behalf of colleagues from Jlab, BINP and IMP.
RF System and EBIS of RAON
Electron lens studies in support of RHIC / LHC Wolfram Fischer 28 July 2010 Fermilab Accelerator Advisory Committee Meeting.
Space-charge compensation experiments at ASTA Vladimir Shiltsev, Moses Chung 16 July Advanced Accelerator Concepts Workshop, San Jose, CA.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
News from J-PARC: the system, the data and the simulation code
Beam Commissioning Adam Bartnik.
CALIFES A proposed electron beam test facility at CERN
Prospects for developing new tubes
Alexander Aleksandrov Spallation Neutron Source Oak Ridge, USA
High efficiency work and MBK development for accelerators
PIs: Riad Suleiman and Matt Poelker
Modelling of diagnostics for the ISIS ring
Preliminary results for electron lens with beam current of 20 A
E-beam scanner experience at FNAL
HEL design, magnet system, e-beam generation and disposal
M. Alcaide Leon, Paolo Fessia
ELENA – Electron Cooler
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Hollow e- lens, Cryogenic aspects
Additional ancillaries for the operation of the Hollow Electron Lens
WP11: electron and proton beam testing
DC Injector and Space Charge Simulation Status
Instrumentation CALIFES ideal for tests and development that requires frequent access to test setup. CERN BI members already using CALIFES and want to.
Experimental Overview
Magnetized Bunched Electron Beam from DC High Voltage Photogun
The Cornell High Brightness Injector
Cornell Injector Performance
CEPC 650MHz High Efficiency Klystron R&D
Performance Degradation cERL Injector Cryomodule
Electron Source Configuration
ELIC Injector Working Group High-P, high-I source issues (DC)
CEPC 650MHz Klystron Development
Injector: What is needed to improve the beam quality?
R. Suleiman and M. Poelker September 29, 2016
PIs: Riad Suleiman and Matt Poelker
Advanced Research Electron Accelerator Laboratory
Selected simulations for XFEL photo injector
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
PIs: Riad Suleiman and Matt Poelker
Update on ERL Cooler Design Studies
WP13 outsourcing: Hollow Electron Lens
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Plans for future electron cooling needs PS BD/AC
Presentation transcript:

Adriana Rossi, Sergey Sadovich List of ongoing studies and topics for a potential test facility and expected benefits for the reference design Adriana Rossi, Sergey Sadovich International Review on the e-lens concept readiness for integration into the HL-LHC baseline 19 Oct. 2017

Context HEL e-beam has different regime (highly space-charged limited) from existing e-lenses Simulations: UltraSAM (Track) CST (WARP) Not yet a direct comparison between different codes, but indications points towards a need for a higher accelerating voltage and magnetic field Need of increasing statistics Experimentally we have performed measurements at FNAL test facility Limitations: no bend, ratio beam pipe/beam very far from perveance limit, no compression RHIC e-lens or CERN tests stands Need to be confidence in the choice of parameters International Review on the e-lens concept readiness for integration into the HL-LHC baseline 19 Oct. 2017

Past and present test stand Summary of current measurements at FNAL Outline of this talk Past and present test stand Summary of current measurements at FNAL CERN test stand RHIC e-lens for tests without ion/proton beam? Conclusions International Review on the e-lens concept readiness for integration into the HL-LHC baseline 19 Oct. 2017

E-lenses test stands: overview FERMILAB – Tevatron BNL – RHIC https://cdcvs.fnal.gov/redmine/projects/elens/wiki/Test_Stand Operational, up to 10 kV, 8us x 1Hz pulses (or higher at lower current) Used to test CERN guns, will be used for testing guns for space-charge compensation at IOTA ring. Could be used to test HF modulators. International Review on the e-lens concept readiness for integration into the HL-LHC baseline 19 Oct. 2017

HG1B 25 cathode – 63 chamber

magnetic field in main solenoid (gun solenoid at 0.2T) CHG1B 25 cathode – 63 chamber peak collector current [A1/2] magnetic field in main solenoid (gun solenoid at 0.2T) cathode-anode voltage [kV1/2]

We can see beam deformation already at <0.5A

Main differences with HEL Ratio between the pipe and beam size is ~3  pipe perveance ~ 10A Uniform pipe  No bends (we cannot see effect of drifts due to B x gradB) Uo = 10kV International Review on the e-lens concept readiness for integration into the HL-LHC baseline 19 Oct. 2017

Test facility at CERN (1) Foreseen for ARIES studies WP16 – Intense, RF modulated E-beams (IRME) Design and build a test stand for testing this gun including instrumentation suitable for measuring the transverse and longitudinal profiles of the RF modulated electron beam Measure the properties of the RF modulated electron beam created by the gun using this test stand 50x70mm oval e-beam, 5-10A, 22kV for the ion beam at the Heavy Ion Synchtron SIS18 (to be used as injector to SIS100) for Space Charge Compensation matched transversally and longitudinally International Review on the e-lens concept readiness for integration into the HL-LHC baseline 19 Oct. 2017

Test facility at CERN (2) Foreseen to test high intensity e-gun for Beam-Beam Long Range compensation Few mm round e-beam, up to 20A, 20-35kV Modulated at 40MHz for bunch by bunch Could be modulated at 4MHz (102nd HiLumi WP2 Meeting https://indico.cern.ch/event/662031/) If HEL becomes baseline tests at CERN beam instrumentation, modulators, interlocks, understanding safety and technical aspects of e-lenses operation preparation infrastructure for test and commissioning of components of HEL@LHC International Review on the e-lens concept readiness for integration into the HL-LHC baseline 19 Oct. 2017

Test-stand development at CERN: Example of diagnostic box at RHIC e-lenses Basic configuration – stage 1 Up to 0.42T (400A) Up to 0.2T magnets at CERN Purpose of this stage: Preparation: Commissioning diagnostic procedures (current, profile, position) Commissioning HV system Safety and technical aspects of operation Electron gun tests: characterization & simulations Design diagnostic box Tests with Beam Gas Curtain monitor Gun solenoid (twins), collector solenoid, diagnostic box (pin-hole Faraday cup + YAG screen monitor), HV system. International Review on the e-lens concept readiness for integration into the HL-LHC baseline 19 Oct. 2017

Test-stand development at CERN. Upgrade Addition of main solenoid – stage 2 Main solenoid could be 0.4-0.5Tx1m or higher (in the latter case a dry SC solenoid may be cheaper and would expand range of investigation) Purpose of this stage: Allow drift and see beam deformations/rotations/… Test Beam Position Monitor ‘shoe-box’ with very HF modulation Test effect of very HF modulation (%current) on beam dynamics (microbunching?) Study electron beam dynamics in regime close to virtual cathode Computer model validation Study electron beam dynamics with compression For ~200 kGBP we can find a dry SC solenoid with 4T, 240mm bore, 980mm length. 5G stray field around 500 mm Price include a cold head, compressor and lines. International Review on the e-lens concept readiness for integration into the HL-LHC baseline 19 Oct. 2017

Test-stand add on with upgrade cathode-anode voltage [kV1/2] peak collector current [A1/2] magnetic field in main solenoid (gun solenoid at 0.2T)

Test-stand development at CERN. The future! Addition a bend – stage 3 Purpose of this stage: Measure effect of B x gradB on deformation of beam with high current density Computer model validation For ~200 kGBP we can find a dry SC solenoid with 4T, 240mm bore, 980mm length. 5G stray field around 500 mm Price include a cold head, compressor and lines. International Review on the e-lens concept readiness for integration into the HL-LHC baseline 19 Oct. 2017

RHIC RHIC will be used to test effect of hollow e-beam: hollow electron gun in construction RHIC e-lens has all features to be the ideal test stand for hollow electron beam International Review on the e-lens concept readiness for integration into the HL-LHC baseline 19 Oct. 2017

RHIC e-lens TEST STAND! International Review on the e-lens concept readiness for integration into the HL-LHC baseline 19 Oct. 2017

Conclusions: a test stand at CERN Studying/characterisation e-lenses’s modules: E-gun (5A DC - 20A DC), Modulator of electron beam Beam diagnostics: profile, position, … Prototype of collector * Compatibility with elliptical beams Investigate electron dynamics Testing computer models and studying beam dynamics UltraSAM, Trak, CST, WARP LHC e-lenses simulation Understanding safety and technical aspects of e-lenses operation Software control (correctors, etc.) Interlocks Preparation infrastructure for test and commissioning of components of HEL@LHC International Review on the e-lens concept readiness for integration into the HL-LHC baseline 19 Oct. 2017

Thank you With special thanks to Giulio Stancari, Alexander Pikin, Alexey Valichev and BINP team