Luminosity lifetime – fill 2932

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
LHC Status Tue Morning 22-Aug
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday fill with 1092 bunches (6 h stable beams)
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
Saturday 12:00 Fill 1992 in stable beams.
Monday 6th August & night
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Monday Morning – recovery from cryo.
Chromaticity can make a difference…
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Thu 15/9 – Fri 16/9 09:30 Controls network problem fixed The network problems have been fixed since 9:30am when the network switch for the Service IP57.
Finally.... We had to wait a long time.... We had many problems....
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
(on behalf of the LHC team)
Wednesday 10/5 Cryo recovery until 18:30
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
LHC Morning Meeting - G. Arduini
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Saturday 3rd November - morning
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Thursday 22 September 2011.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Saturday 24 September 2011.
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Monday 10th December - morning
Monday 27th August & night
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
31/3/2010 Difficult day… but at the end stable beams.
Wednesday 6.10 Morning: Quench test at 450 GeV
Saturday 26 November 2011.
Tuesday
Presentation transcript:

Luminosity lifetime – fill 2932 Octupoles, Q’ reduced 08-08-12 LHC status

Thursday 9th August - morning 11:52 Fill 2932 dumped by Faulty electrical distribution on network switch SIS dumped the beam due to communication time-out 103 pb-1 in 6h26m, peak lumi 6.63e33 cm-2s-1 12:30 Access ATLAS, di/dt intervention at point 4, RAMSES reset point 7, TDI inspection point 8, LBDS controls intervention point 6 BI at point 4. ALICE and CMS also went in. 16:30 Start pre-cycle 08-08-12 LHC status

Dump of 2932 Report by Alastair Bland (BE/CO) and Gyorgy Balazs (IT/CS) on the electrical problem that caused the LHC SIS to dump the LHC Beam at 11:53. Three Multiprise in the IT/CS Starpoint and one in the CCR lost power, all due to 30mA differential protections. The equipment connected to the Starpoint Multiprise was the CESAM IP7 switch + other systems with dual sources of power that were not lost. The equipment connected to the CCR Multiprise was much more important: IP91 for the Technet IP71 for the General Network On IP91 there are: CS-CCR-NQPS* (all New QPS) -CS-CCR-CIS/CIRCUIT/CMW4/OAS1/OASIS1/QPSM/RADE2/TIM1/TIM11/TIM12/TIM6/VACLHC On flipping up the Multiprise breaker around 12:20 power returned but was lost in about 2 minutes. At this point it was noticed that the IP91 switch and the Reserve Power Supply were on the same Multiprise which explains why IP91 was lost, normally power input should have been redundant. This has been fixed now by Gyorgy. After that around 14 machines still had no network. It was found the the BE/CO Blade enclosure switch for CS-CCR-NQPS/TIM1/TIM6/CIS/DIAM3 did not work. After a reset it worked. Karsten Kahle had many years ago lent BE/CO and IT/CS some electrical transient recorders. By chance one of them was on one of the Multiprise that tripped… some indications of effects of 18 kV cable testing in SPS 08-08-12 LHC status

Thursday evening ~18:00 Inject, ramp 2933 – no problem Heavy losses on beam 2 end squeeze – no sign of coherent instability Appears high vertical tune, plus bump in function plus sidebands, high chromaticity – pushing beam on to 1/3 order resonance – see below 08-08-12 LHC status

Now manually checking these as well… (QFB in ramp issues) QTD squeeze functions 2933 Now manually checking these as well… (QFB in ramp issues) 08-08-12 LHC status

Beam 2 vertical tune From whence cometh the sidebands? Long-term coherent synchrotron oscillations? 08-08-12 LHC status

Beam 2 – vertical tune function in squeeze 08-08-12 LHC status

Thursday night 22:00 injecting for physics again 23:25 Stable beams #2934 Initial lumi 6.47 cm-2s-1 Now routine adjustment of Q’ and octupoles once in collisions Decrease of the chrom in V had a positive effect on beam 1 life-time and the decrease of the octupole on beam 2 life-time. Beam 2 still very sensitive to any orbit correction/ lumi scan 23:56 LHCb called to announce 1 fb-1 recorded (Alice luminosity low) 08-08-12 LHC status

Incoming Beams just dumped – CMS solenoid 130 pb-1 Octupole polarity check (~4 hours) LHCb polarity flip Test ramp – also to be used for ADT tune measurement test 08-08-12 LHC status

ADT tune measurement Wolfgang Hofle 08-08-12 LHC status

Wolfgang Hofle 08-08-12 LHC status