ISO New England System R&D Needs

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

Software Analysis Tools
Electrical and Computer Engineering Mississippi State University
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
Improving Transmission Asset Utilization through Advanced Mathematics and Computing 1 Henry Huang, Ruisheng Diao, Shuangshuang Jin, Yuri Makarov Pacific.
PacifiCorp-CAISO EIM Initiative Overview
ERCOT OCITF 3/23/ ISO Comparison – NEISO Alex Lee (ERCOT) Lee Blaede (NEISO) ERCOT OCITF 3/23/2015.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
Supervisory Systems.
Year 2006 Report “Better” Managed and Controlled Transmission Grids using Advanced Technological Concepts Aty Edris EPRI Power Delivery & Markets
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
 Can we calculate, measure, predict the GICs?  How will the GICs affect transformers?  How will the power network respond?  What could we have done.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
Integrated Security Analysis Pete Sauer, PSERC – Illinois Kevin Tomsovic, PSERC – WSU Steve Widergren, PNNL January 27-29, 2004 Washington, D.C. Transmission.
Optimization for Operation of Power Systems with Performance Guarantee
Peak RCCo Performance Metrics Draft –November 2013.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
1 Security assessment: decision support tools for power system operators James D. McCalley, Iowa State University, Ames, Iowa September.
Enhancing Reliability of the North American Transmission Grid Enhancing Reliability of the North American Transmission Grid Presented By Dejan J Sobajic.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
PS ERC 1 Reactive Power Considerations in Linear Load Flow with Applications to Available Transfer Capability Pete Sauer (With a lot of help from Santiago.
Optimal Power Flow- Basic Requirements For Real Life.
Todos los derechos reservados para XM S.A E.S.P. Luis Alejandro Camargo S. Wholesale Market Manager XM S.A. E.S.P. Colombian Market Stress Experiences.
Criticality and Risk of Large Cascading Blackouts Ian Dobson PSerc, ECE Dept., University of Wisconsin, Madison, WI Benjamin A. Carreras Oak Ridge National.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
A new Nomogram Development POM- based tool - Application results in the Idaho Power System. Orlando Ciniglio, IPC Marianna Vaiman, V&R Energy WECC TSS.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
PS ERC EC Meeting Systems Stem New Research Initiatives.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
Southern Cross Directives Planning Items
ECEN 460 Power System Operation and Control
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Defect and Enhancement Severities Levels
Grid Integration of Intermittent Resources
System Control based Renewable Energy Resources in Smart Grid Consumer
Lec3: Network Management
RESEARCH, EDUCATION, AND TRAINING FOR THE SMART GRID
Project WECC-0100 Update Load Modeling Task Force
Planning Tools Overview
EU-IPA12/CS02 Development of the Renewable Energy Sector
Transmission Planning in a Modern Market Environment
Module 4 Smart Grid Implementation Issues
Load Flow Studies Eng. Edvan Moyo BEng, MEng, MBA
James D. McCalley, Iowa State University, System Stem Leader
DEC System Voltage Planning - June 2018
Impacts and Actions Resulting from the August 14, 2003 Blackout
ECEN 460 Power System Operation and Control
Security assessment: decision support tools for power system operators
PacifiCorp-CAISO-NVE EIM Initiative Overview
GENESYS Current Functionality
Planning Tools Overview
Project WECC-0100 Update Load Modeling Task Force
Software Analysis Tools
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Market Pricing Initiatives Update September 9th, 2003
Supplemental Project Planning Process Under Order 890 Within PJM
Jim Mcintosh Director, Executive Operations Advisor California ISO
Author: Italo Fernandes
Backtesting.
Lec1: Introduction to Network Management
Presentation transcript:

ISO New England System R&D Needs Eugene Litvinov, Senior Director, Business Architecture & Technology PSERC 2008 Summer Planning Workshop South Lake Tahoe, August 2008

Day Ahead and Real Time Markets Accurate automated calculation of thermal interface limits subject to N-1 and N-2 contingency protection in real time The task is to adopt an automated off-line process for on-line studies. Accurate calculation of transfer limits for on-line requires AC model of the system instead of currently used DC model. Replace commonly used for planning the system loading approach with pre-defined Source and Sink by more appropriate for Real Time operation loading based on economic dispatch. Improve quality of power flow model for Day-Ahead and Real-Time via introduction of dynamically updated load tree The objective is to minimize load model error on zonal and bus levels for Day-Ahead studies and modeling of non-metered load for State Estimator. This development is particularly important for on-line voltage stability calculation based on the EMS model where an accurate estimation of reactive power of load significantly impacts results Business Architecture and Technology © 2008 ISO New England Inc.

Operations Increase efficiency of the power system transfer capabilities utilization via introduction of Adaptive Transient Rates (ATR) of equipment Novel ATR concept allows to increase operational limits without degradation of system reliability by accounting for actually available in Real Time dispatchable resources to be used for relieving post-contingency thermal overloading. ATR will allow to increase operational transfer limits up to 3-5% for overhead lines and up to 10% for underground cables. ATR concept is different from commonly known temperature sensitive “dynamic” line ratings and could be applied complementary to “dynamic” line rates. Research on feasibility of implementing cascading preventive actions in power system operation Evaluation of methods and tools for on-line identification of possible cascading events, and optimization of corresponding preventive actions based on economic dispatch. Develop a metrics for a decision implementing preventive actions based on the cost of these actions and probability of cascading. Business Architecture and Technology © 2008 ISO New England Inc.

Operations Increase the reliability of control center operation Establish backup tools providing security constrained dispatch in case of failure of the regular SCED. A Backup tool to provide secure dispatch solution for credible contingencies in case of Market software failure. Visualization Investigate and implement advanced visualization technology to help operators make real-time decisions (contingency visualization, 3D, Google Earth, etc). Standardization of visualization solutions and architecture. Visualization components exchange. Voltage control area and voltage profile optimization Robust OPF program to optimize system voltage profile On-line voltage stability calculation Upgrade EMS model to make it usable for voltage stability studies. Adjust and implement software tools for consistent on-line calculation of thermal and voltage stability limits. Business Architecture and Technology © 2008 ISO New England Inc.

Operations and Planning Load ranking and modeling Load ranking for voltage stability analysis based on sensitivity of load margin with respect to the bus load; detailed load modeling developed for high-ranked loads while using simple P-Q loads for low-ranked loads so as to minimize the efforts of developing accurate load models for voltage stability analysis. System Restoration Current status is off-line restoration planning; real system condition might be different than off-line planned; Need on-line tools and decision support system to optimize restoration; Need tools to help operators visualizing system restoration Power system dynamic reduction Dynamic simulation is on a 50,000 buses eastern interconnection system. Investigate tools of dynamic reduction to improve efficiency. For on-line dynamic stability assessment, need dynamic reduction to represent external areas. Business Architecture and Technology © 2008 ISO New England Inc.

Capacity Market Security Evaluation ISO needs to perform reliability assessment during qualification process (QP) and at each round of the dynamic range of the forward capacity auction. The number of studies in QP is very large and requires the time window is comparatively short. The time constraint during the auction are even much tighter. This creates the need for a very fast security evaluation process. It is not very clear what the criteria should be used in the planning stage vs. operation. ISO is required to perform security assessment for monthly capacity reconfiguration auction. Due to variation in load level, transmission and generation maintenance, the most severe condition may not occur at the extreme peak or light load condition. ISO therefore needs to perform detail security analysis of all 744 hours within a month to determine whether the capacity obligation change is allowed. The time window is very short as well. Business Architecture and Technology © 2008 ISO New England Inc.

FTR Risk Management FTR collateral is based on historical returns. However past returns do not guarantee future performance due to planned/unplanned transmission outages , generation additions/outages/retirements. This creates high risk of FTR/CRR holder defaults. The need for new approaches of estimating and monitoring risk exposure of FTR portfolios using probabilistic assessment of future congestion patterns. Possibly daily monitoring to detect situations that could “flip” the portfolios. Business Architecture and Technology © 2008 ISO New England Inc.