6th srf collaboration meeting @ lasa 13 June 2017 - CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF accélérateurs au SACM Je suis au CEA depuis janvier 2006
Two types of interfaces Internal interfaces: Cavity with helium tank welded, equipped with flanges, brackets (on tuner), pick-up antennas and vacuum valve Interfere closely with cold tuner, MLI, magnetic shielding, cavity support, intercavity below / cold warm transitions and cryogenic lines External interfaces: Vacuum vessel fully equipped Connectors of instrumentation fixed on the cryomodule (for its vacuum integrity) Interfere with warm-units, waveguides, cryomodule supports, valve box, auxiliary lines, exhaust lines, isolation vacuum pumping systems, cables for instrumentation 13/06/2017 Technical interfaces
Cavity Interface drawings 14 different drawings called by the interfaces document including: 7 sheets defining the footprints, dimensions, tolerances, interfaces, and shipment configuration of the cavity: 71 HAAV DM-9000 000 RD sheets 1 to 7 3 for the blind flanges: 71 HAAV DM-3000 004 RD 71 HAAV DM-3000 009 CB 71 HAAV DM-3000 011 RC One for the bracket clamp: 71 HAAV DM-0040 001 RB (for M-Beta cavity) 71 HAAV DM-0050 001 RB (for H-Beta cavity) 3 for hexagonal aluminum gaskets: 71 HAAV DM-0023 008 RC (vacuum beam tube) 71 HAAV DM-0023 010 RC (coupler) 71 HAAV DM-0023 013 RB (pick-up) 13/06/2017 Technical interfaces
Cavity interfaces document Document written by CEA and adjusted after many iterations with LASA Last issue sent by ESS on 08th of June 2017 Internal review Warning : Ti tube specification 3/06/2017 Technical interfaces
Cavity Interface drawings – sheet 1/7 Tank geometry Footprints for cavity handling Cryo Inlet/outlet 13/06/2017 Technical interfaces
Cavity Interface drawings – sheet 2/7 Blocks for tuner and brackets 13/06/2017 Technical interfaces
Cavity Interface drawings – sheet 3/7 Blocks for tuner and brackets 13/06/2017 Technical interfaces
Cavity Interface drawings – sheet 4/7 Beam ports flanges 13/06/2017 Technical interfaces
Cavity Interface drawings – sheet 5/7 Coupler port flange and pick-up connector 13/06/2017 Technical interfaces
Cavity Interface drawings – sheet 6/7 Bellows characteristic and engraving area 13/06/2017 Technical interfaces
Cavity Interface drawings – sheet 7/7 Belimed/ reception configuration 13/06/2017 Technical interfaces
Cavity accessories drawings 13/06/2017 Technical interfaces
Cavity accessories drawings Design for M-Beta cavity Design for H-Beta cavity 13/06/2017 Technical interfaces
Cavity configuration Optimization of the configuration process and production at CEA CEA is mastering the configuration of the interfaces documents Specific needs of STFC not specified by CEA Important changes to be submitted to CEA through an ESS change request ESS is in charge of the configuration management of its CATIA folder supplied by CEA, corresponding to the 3D mockup for engineering support given to STFC 13/06/2017 Technical interfaces
Thank you Technical interfaces Commissariat à l’énergie atomique et aux énergies alternatives Centre de Saclay | 91191 Gif-sur-Yvette Cedex T. +33 (0)1 69 08 76 11 | F. +33 (0)1 69 08 30 24 Etablissement public à caractère industriel et commercial | RCS Paris B 775 685 019