Briefing on 2017 CAISO Policy Initiatives Roadmap

Slides:



Advertisements
Similar presentations
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Advertisements

Update on CAISO / PacifiCorp Energy Imbalance Market
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
Ancillary Services Market, Day-Ahead Load Response and Special Case Nodal Pricing Implementation Vamsi Chadalavada FERC Technical Conference March 4, 2005.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.
Update on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Market Interface Committee March 25, 2014 Jim Price, Senior Advisor, Market Development.
JANUARY 14-15, 2014 | NEPOOL MARKETS COMMITTEE Matthew Brewster MARKET DEVELOPMENT | Conceptual design.
PacifiCorp-CAISO EIM Initiative Overview
Tax Risk Management Keeping Up with the Ever-Changing World of Corporate Tax March 27, 2007 Tax Services Bryan Slone March 27, 2007.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time.
Presentation to WECC Market Interface Committee March 24, 2015
NV Energy Energy Imbalance Market (EIM) Presentation to ISAS
ECM Project Roles and Responsibilities
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Public Market Surveillance Panel Consultation on CMSC Issues Related to Constrained off Payments to Generators and Imports Market Operations Standing Committee.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
Bulk Power Transmission System
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
ISO Comparison – CAISO Alex Lee (ERCOT)
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
1 October 2003 Electricity Markets Regional Evolution Randy Berry
Reliable Power Reliable Markets Reliable People AESO Integrated Market Roadmap March 2009 Stakeholder Session.
Update on Energy Imbalance Market Presentation to WECC Market Interface Committee October 15, 2015 Jim Price, Senior Advisor, Market Development & Analysis,
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 12, 2006.
MISO Wisconsin Relationship Public Service Commission Randel Pilo, Assistant Administrator August 7, 2008.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management August 18, 2011.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. Southwest Connecticut RFP Markets Committee November 14, 2003.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Nodal Readiness Plan Update Ron Hinsley Update for TAC November 3, 2005.
Commodity Exchange Act Exemption Status Mark Ruane ERCOT Vice President of Credit and Enterprise Risk Management October 26 th 2011 ERCOT Public.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Energy Imbalance Market (EIM) Dan Dettmer Board Meeting February 16, 2011.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
EIM/EDT Update ColumbiaGrid Planning Meeting June 2, 2011.
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
CAISO Market Design Initiatives Update Donald Tretheway Senior Market Design and Policy Specialist CPUC Storage Proceeding January 14, 2013.
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
Bert Peters Chair, Path Operator Task Force
IPC’s Energy Imbalance Market OATT Stakeholder Meeting
Transmission-Distribution Interface Working Group Meeting
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Asia-Pacific Energy Regulatory Forum
TAC Report to the ERCOT Board
Defect and Enhancement Severities Levels
2 Selecting a Healthcare Information System.
FERC Order 1000 One Transmission Owner’s Perspective
MIC Committee Discussion
Benefits of New England’s Proposed Capacity Market
Convergence Bidding Working Group – 10/22/09
Pay for Performance Regulation
PacifiCorp-CAISO-NVE EIM Initiative Overview
An Update of COSO’s Internal Control–Integrated Framework
Update on Energy Imbalance Market
MIC Committee Discussion
Standards Development Process
Bert Peters Chair, Path Operator Task Force
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

Briefing on 2017 CAISO Policy Initiatives Roadmap Presentation to WECC Market Interface Committee March 22, 2017 Jim Price, Senior Advisor, Market & Integration Studies, CAISO

Stakeholder Initiatives Roadmap process includes stakeholder participation ISO receives potential initiatives through stakeholder input, among other sources (ISO analysis, FERC decisions, etc.) Stakeholder web conferences 11/3/2016 & 12/22/2016 Stakeholder Initiatives Catalog process updates descriptions, categorization and status of all identified policy initiatives Revised draft catalog published 11/4/2016 Policy Initiatives Roadmap ranks discretionary initiatives Briefing to EIM Governing Body 2/1/2017 & ISO Board of Governors 2/16/2017 Final documents (posted 3/6/2017) available: www.caiso.com/informed/Pages/StakeholderProcesses/StakeholderInitiativesCatalogProcess.aspx

Discretionary initiatives are ranked using a high level cost/benefit analysis Criteria High (10) Medium (7) Low (3) None (0) Benefit Grid Reliability Significant improvement Moderate improvement Minimal improvement No improvement Improving Overall Market Efficiency Desired by Stakeholders Universally desired by stakeholders Desired by majority of stakeholders Desired by a small subset of stakeholders No apparent desire Feasibility Market Participant Implementation Impact ($ and resources) No impact Minimal impact Moderate impact Significant impact ISO Implementation Impact ($ and resources)

Ranking results prioritize the top discretionary initiatives Grid reliability Improving overall market efficiency Desired by stakeholders Market participant implementation impact ISO implementation impact Total score Real-time market enhancement 7 3 31 Management of EIM imbalance settlement for bilateral schedule changes Risk-of-retirement process enhancement 10 29 CRR auction efficiency 28 Donation by third party for transmission capacity available for EIM transfers 27 EIM wheeling charge (narrow issue) 23

2017 Policy Initiative Roadmap shows ongoing, non-discretionary, and 6 discretionary initiatives (and some in initiative analysis phase)

Policy Initiatives Roadmap and Stakeholder Initiatives Catalog provide details of potential enhancements Real-time market enhancement: Enable 5-minute dispatch to perform functions of 15-minute unit commitment, ancillary services procurement, local market power mitigation, and shorten lead time for intertie scheduling Management of EIM imbalance settlement for bilateral schedule changes: Following Oct. 2016 FERC technical conference on EIM intertie bidding, use wheel-through function to manage bilateral schedule changes, with bid price for schedule change Risk-of-retirement process enhancement: Extend current “risk-of-retirement” backstop procurement beyond single year to keep capacity in operation for future reliability CRR auction efficiency: Address persistent shortfall of CRR auction revenue relative to payments to CRR purchasers, potentially by replacing auction with market for sale of CRRs Donation by third party for transmission capacity available for EIM transfers: Extend allocation of congestion revenue among EIM entities to compensate third parties who would make transmission available to support EIM transfers EIM wheeling charge: Address narrow issue of compensation for wheels between BAAs within EIM footprint