Pixel DQM Status & Plans

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

CSC DQA and Commissioning Summary  We are responsible for the online and offline DQA for the CSC system, a US ATLAS responsibility  We are ready for.
Data Quality Monitoring for CMS RPC A. Cimmino, D. Lomidze P. Noli, M. Maggi, P. Paolucci.
New Features of APV-SRS-LabVIEW Data Acquisition Program Eraldo Oliveri on behalf of Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer] NYC,
Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
Event display monitoring Giuseppe Zito : Infn Bari Italy Beliy Nikita : University of Mons-Hainaut Belgium.
Data Quality Monitoring of the CMS Tracker
Craft09 Visual Summary and Efficiency Trackermaps Giuseppe Zito : Infn Bari Italy Giuseppe Zito, Infn Bari.
Offline Tracker DQM Shift Tutorial. 29/19/20152 Tracker Shifts Overview Online Shifts at P5 (3/day for 24 hours coverage) – One Pixel shifter and one.
DQM Architecture From Online Perspective EvF wkg 11/10/2006 E. Meschi – CERN PH/CMD.
1 Alice DAQ Configuration DB
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
Bookkeeping Tutorial. Bookkeeping & Monitoring Tutorial2 Bookkeeping content  Contains records of all “jobs” and all “files” that are created by production.
ALICE, ATLAS, CMS & LHCb joint workshop on
CMS pixel data quality monitoring Petra Merkel, Purdue University For the CMS Pixel DQM Group Vertex 2008, Sweden.
DQM status report Y. Foka (GSI) Offline week from pp to PbPb.
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
Tracker Visualization Tool: integration in ORCA Maria S. Mennea, Giuseppe Zito University & INFN Bari, Italy Tracker b-tau Cosmic Challenge preparation.
September 2007CHEP 07 Conference 1 A software framework for Data Quality Monitoring in ATLAS S.Kolos, A.Corso-Radu University of California, Irvine, M.Hauschild.
Online Reconstruction 1M.Ellis - CM th October 2008.
February 07, 2002 Online Monitoring Meeting Detector Examines Should aid in: 1.Diagnosing problems early and getting it fixed 2.Making decisions on the.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
1 Offline Week, October 28 th 2009 PWG3-Muon: Analysis Status From ESD to AOD:  inclusion of MC branch in the AOD  standard AOD creation for PDC09 files.
The MEG Offline Project General Architecture Offline Organization Responsibilities Milestones PSI 2/7/2004Corrado Gatto INFN.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
PHOS offline status report Yuri Kharlov ALICE offline week 7 July 2008.
Straw VME Data Monitoring M. Koval Straw WG meeting
1 Status of Tracker Alignment b-tagging Workshop Nhan Tran (JHU) On behalf of the Tracker Alignment Group.
Overview of EMU Software Rick Wilkinson. Slice Test DAQ We succeeded in using Slice Test DAQ code to take test beam data, combining chamber and trigger.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Current Status of the Tracking Trigger Software Andrew W. Rose.
D. Elia (INFN Bari)Offline week / CERN Status of the SPD Offline Domenico Elia (INFN Bari) Overview:  Response simulation (timing info, dead/noisy.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
TGC L1 Trigger On-Line Monitoring Tel Aviv University:
Online – Data Storage and Processing
HCAL Database Goals for 2009
DCS Status and Amanda News
Christoph Blume Offline Week, July, 2008
Srećko Morović Institute Ruđer Bošković
CMS High Level Trigger Configuration Management
Tracker Upgrade Simulations Software Harry Cheung (Fermilab)
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Calibrating ALICE.
ALICE – First paper.
Commissioning of the ALICE HLT, TPC and PHOS systems
Hannes Sakulin, CERN/EP on behalf of the CMS DAQ group
Online Software Status
Remaining Online SW Tasks
Experience between AMORE/Offline and sub-systems
Data Quality Monitoring of the CMS Silicon Strip Tracker Detector
Tracking parameter optimization
CMS Feedback on the High pileup (PU) Fill
HLT Jet and MET DQA Summary
CMS Pixel Data Quality Monitoring
Status of RPC DQM for Global DAQ in CMSSW
CTP offline meeting 16/03/2009 A.Jusko and R.Lietava
DQM for the RPC subdetector
Station Management System
The CMS Tracking Readout and Front End Driver Testing
CMS Pixel Data Quality Monitoring
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Presentation transcript:

Pixel DQM Status & Plans R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University of Tennessee) S.Tentindo (Lausanne, PSI) 09/29/09

Changes in online Local Tracker DQM processes running on vmepcs2b18-25 (Pixel and Strips) for: Backup Development Interactive xdaq process / Expert GUI / TrackerMaps Would be good to have a backup VME machine for extended running (4MB RAM) Last week: installed our own storage manager proxy  expected no more time-outs of the DQM process; much more autonomy regarding process parameters (e.g. event rate into Pixel DQM) 09-29-09 Pixel DQM

Monitoring during timing scans Danek estimated 25 runs at 10-20 minutes of minimum bias running each Will explore if local Pixel DQM process can be used for high rate monitoring during timing scans for quick online feedback Will run stripped down light version, only looking at digi and cluster occupancy and cluster size, no tracking or error monitoring. Will increase input event rate as much as possible; needs some negotiations with central DQM due to network limitations 09-29-09 Pixel DQM

Other online DQM developments Errors monitored by FED# and channel# now, instead of by module FED TrackerMaps will be implemented soon Static TrackerMaps implemented and displayed in GUI Monitoring of Pixel clusters in the HLT in progress Basic usage of DCS info implemented, now waiting for real values to be available offline; will have to fine tune combination with DAQ and DQM info for good run flags 09-29-09 Pixel DQM

New: static TrackerMaps e.g. digi occupancy 09-29-09 Pixel DQM

Changes in offline Working on making QTest configuration based in DB (currently read from xml files inside the CMSSW release)  will provide more flexibility toward changing data or detector conditions; much faster turn around Machinery set up to tune QTest parameters to collision data; need to run it on min bias or RelVal samples to tune the cuts; will take geometry into account to some level (higher occupancy near IP, etc.) Coarse hit efficiency monitoring under development (implementation of a rough version of the existing prompt analysis) 09-29-09 Pixel DQM

Summary Valuable lessons learned from CRAFT09 Code development ongoing; there are still new features to be implemented Trying to be prepared for collisions New experts are being trained for on-call duty 09-29-09 Pixel DQM