Mooring operation at Strömmen

Slides:



Advertisements
Similar presentations
University of Kansas Sailing Club
Advertisements

mu Standard Marine Communication Phrases Multiple-Choice Test.
Sailing – A Beginners Guide
Forestay Topping Lift Painter Mast Boom Tiller Shroud Tabernacle Centerboard Starboard Port Boomvang Winch.
® 1 Seamanship Chapter 6 Anchoring, Mooring and Rafting.
USS Abraham Lincoln CVN-72 Everett, WA preparing for next cruise < 20mm Phalanx CIWS MK29 Sea Sparrow SAM Launcher > A private tour with Vern.
Copyright Coast Guard Auxiliary Association, Inc.
Chapter 5 : Effect of the Wind. Ch5. Effect of wind mostly experienced when proceeding at slow speeds can create major problems when: -During river passages.
Terms you need to know on the water!
Anchor Handling Changes. Basic Idea Barge with HYPACK SURVEY Tug 1 Tug 2 Tug 3 Home Office GPS & HDG WEBIF Or SURVEYVIEWER All vessels can see each other.
Rudyard Lake Sailing Club Towing & Being Towed. Fault Finding – Can we fix it? Engine Won’t Start / Has Cut Out Engine Won’t Start / Has Cut Out – Have.
Adapted from Skračić,T., „Waypoint”
BOAT HANDLING.
OPERATING YOUR BOAT SAFELY OPERATING YOUR BOAT SAFELY.
Boating Vocabulary Aft – towards the back of the boat.
Copyright Coast Guard Auxiliary Association, Inc. 1 Chapter 3 Navigating The Waterways.
Charting for Beginners. Essential Questions… How do you use a compass? How do you use a compass? How do you use the tools while charting? How do you use.
Shiphandling. Bridge Watch Team Bridge Equipment Radio hand Sets/speakers Status Boards Chart Table Gyro repeaters Magnetic compass Radar repeaters Alarms/light.
1 “ U.S. Aids to Navigation – Road Signs of the Waterways”
Petroleum Engineering 406 Lesson 9b Station Keeping.
To Share & To Absorb The Lessons Vessel Collision Incident Vessel Collision Incident Lecturer – Capt Cao jihui Aoxing Ship Management (Shanghai) Ltd.
ABL-7 Able Boat Handling Instructors: George Crowl.
Sail Course ® Section 19, Docking and Anchoring. Sail Course ® Figure 19–1 Docking under Sail.
At about 0615H in pos. Lat N E while the ship was at Alexandria Anchorage, M/V UNION BIENVENIDO Majuro Flag Call sign V7XR3 was observed.
CANADIAN COAST GUARD AUXILIARY - PACIFIC TOWING OPERATIONS AND SAFETY CANADIAN COAST GUARD AUXILIARY - PACIFIC January 2012.
Boating and Safety Boating safety- describe Alabama’s boating laws, basic vessel operation, required boating equipment, and possible hazards involved in.
Goddard Sailing Association
GSA Cruiser Qualification Course
Chapter 4 MOTION IN TWO DIMENSIONS. Two dimensions One dimension Position O x M x x y M Path of particle O x y.
LOUIS XIII CUP SAILING RACE Schedule 11:30 Introduction & Briefing 12:00 Yachting Experience 13:00 Launching Ceremony 14:00 Sailing Practice 15:00 Sailing.
HP UNIT 3 Motion in 2D & Vectors. Consider the following 3 displacement vectors: To add them, place them head to tail where order doesn’t matter d1d1.
QM-5 QuartermasterSafety Instructors: George Crowl.
Fwd. Anchor Windlass / Capstan
What Makes Up a Ship?.
SABOT Standardized Auxiliary Boat Operations Training
Anchoring (wind over tide) 1.Pick a safe place – protection, tides (clearance), holding (anchor type –v- sea bed); room (swing gets larger as sea level.
Sail Course ® Section 18, Storm Conditions. Sail Course ® Figure 18–1 Heaving To.
LESSON THREE OPERATING YOUR BOAT SAFELY
Buoy mooring at Stockholm ström. Wind restrictions anchoring at Strömmen.
QM-8 QuartermasterAnchoring Instructors: George Crowl.
ALOKRAJ. V - NA07B004. General All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
Victoria Nyanza Sailing Club Beginners Course Sailing.
Basic Boat Handling 1. Can undertake appropriate pre-start checks on the engine and hull. 2. Can start and stop the engine. 3. Can steer the boat ahead.
NAVIGATION LIGHTS PART C RULES Rule 20 - Application.
CANADIAN COAST GUARD AUXILIARY - PACIFIC BOAT HANDLING QUIZ CANADIAN COAST GUARD AUXILIARY - PACIFIC.
*Turning the Boat with the Bow Crossing the No-Go-Zone
 Come Sail Away With me in Oceanography……... This year  You will be voyagers upon the ocean  Navigating your sailboat  Visiting new countries and.
Goddard Sailing Association Hunter 27 Cruiser Qualification Course 1.
Linehandler. Disclaimer DISCLAIMER: The contents of this document are intended only for the informational use of the addressee. The information contained.
Contact Point Agent:Operating company: Stevedore:Harbor Master: Liner:Japan Coast Guard: Tug Company:Other: Earthquake, Tsunami is occur r red !! Earthquake.
Module 3 – Naval Skills Unit 3 - Basic Seamanship
Basic Boat Handling 1. Can undertake appropriate pre-start checks on the engine and hull. 2. Can start and stop the engine. 3. Can steer the boat.
Marine Kit – 2 Ship Construction
Conditions Around the Azores/Canaries
Shiphandling.
Spirit of South Carolina: Seamanship and Sail Theory
Mooring operation at Strömmen
Informal Document: ACSF Rev.1
Tug Boat 101 Coastal and Blue Water
RIB DRIVER SAFETY GC32 RACING TOUR
Basic Sailboat Maneuvering
Let’s enjoy a great days sailing together.
Terms you need to know on the water!
Basic Rules of Sailboat Sailing
Let’s enjoy a great days sailing together.
Visual Aids to Navigation
Mooring operation at Strömmen
Informal Document: ACSF-10-08
World Sailing Appendix C Match Racing Rules 2017 – 2020
표준해사통신용어 (SMCP) 용어 5.
Presentation transcript:

Mooring operation at Strömmen For ships shorter than 230m anchoring and mooring is still possible Mooring For mooring click on the blue mooring path for anchoring green anchor path Anchor

Mooring operation at Stockholm Ström

The anchor system is similar, as the offshore industry use for mooring in open waters 2 x ”MK5”-anchor, weight of 15 tons each

The blue and violett figurs show all of the anchors at Stockholms Ström

There is ~ 10 m slack in the chain for each buoy which means that the distance between buoys will be ~380m after the lines has been tightened

The system is designed for mean winds up to 14 m/s in all directions for a ship with a wind area of 10 000 sqm

Maximum 6 lines can be used for mooring at the western buoy and 8 lines at the eastern buoy The buoys are equipped with AIS and quick release hooks (SWL 125 ton) The anchor chain is the limitation for the buoy maximum work load for the buoy is 269 tons, break load 383 ton

Stockholm Port do not have any restrictions for bow out or in Stockholm Port do not have any restrictions for bow out or in. Its up to the ship to determine, but its appreciates if the ship will moor with the bow in Its possible to approach north or south of the eastern mooring buoy

If, mooring with the bow out, the yellowed marked area have an diameter of 340 m

There is one mooring boat It is recommended to start with the moorings to the forward buoy Before passing the eastern mooring buoy make fast the tug boat, tug line

-just drop the lines, no heaving line required The mooring boat will avoid working under tight lines and can handle two lines

Before all lines are tight and fast the ship will swing for a while Before all lines are tight and fast the ship will swing for a while. It is important to give this operation some time and adjust the lines so bow and stern lines will be tightened

On departure, slack lines so that the linesmen safely can embark the bouy Dont let go more lines than the crew can bring in, to aviod any problems with lines in the propellers etc

Anchor and buoy mooring at Stockholm ström

Wind restrictions anchoring at Strömmen

The positions for the anchors are calculated from the mooring buoys position in the chart and can be presented in the chart and/or given to the mooring boat for an optical heading

It´s possible to use western or

- estern mooring buoys, but only between the two buoys

Connect the tugboat aft with tugs line At certain wind and current conditions, the ship drift southward during the approach Connect the tugboat aft with tugs line

Use the mooringboat for an optical heading to the dropping position.

Manoeuver towards the mooringboat Before the anchor drops, the mooringboat will move towards the other anchor position

After the first anchor has been dropped, move the ship to the other anchor position. 7.5 shackles will be used to reach second anchor position.

Before the second anchor drops, the mooring boat will move to the mooring buoy. When the other anchor has been dropped, the tugboat will assist/tow the ship towards the mooring buoy Max two lines at the same time for the mooringboat

Maximum 6 lines can be used for mooring on the western buoy and 8 lines at the eastern buoy The buoy is equipped with AIS and quick release hooks The anchor chain is the limitation for the buoy maximum work load for the buoy is 269 tons, break load 383 ton

Well moored at Strömmen 5 Schackels Distance buoy – Ship 30-40m The bouy will pitch when the lines are tighted Drift of buoy ~10 m