SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.

Slides:



Advertisements
Similar presentations
Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
Advertisements

Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
March 2011Particle and Nuclear Physics,1 Experimental tools accelerators particle interactions with matter detectors.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
27 April ’12 MINER A meeting Alessandro Bravar Université de Genève UniGE Miner a Application Motivation UniGE neutrino group MINER UniGE NA61 / SHI.
Antiproton Physics Experiments Keith Gollwitzer -- Fermilab Antiproton Sources Accumulator Antiproton Physics Experiments –Precision measurements Method.
J.-P. Riunaud PS/AE PSMB 16/09/2002 Report from 59 th SPSC meeting 03/09/2002 OPEN SESSION on Tuesday, 3 September 2002 at 09:00, Main Auditorium 1. Proposal.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
SPSC116 Summary Lau Gatignon, 14 January Accelerators Ion preparations are well under way, including de-bunching and recapture. Ion interlock against.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
Status of North Area Target (TCC2) & prospects EATM 28/07/2015D. Grenier1 Targets (T2, T4, T6 and T10) replaced in 2014 during LS1 (+ 4 spares) Previous.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
SPSC106 summary for EATM Lau Gatignon / EN Open Session:COMPASS, ICARUS, OPERA, LBL  (E-007  g PBAR (I-241) Closed Session: P347 (SBL ), AD EXPERIMENTS,
SPSC119 Summary Lau Gatignon / EN-MEF, Rende Steerenberg / BE-OP DIRAC, NA61, CAST, OSQAR, CAST, UA9, AWAKE, Baby-MIND, Neutrinos, SHiP, P348, P349, ELENA.
General Information New members in ABP (RTL): –M. Samson Restructuring should be finalized by the end of the year to be effective for beginning of the.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
CERN: The ATRAP Experiment. Preview Overview of the ATRAP Experiment  History  Ongoing work  Goals Presentation of my jobs and projects.
Lau Gatignon, EATM,  The construction of the CHARM and IRRAD zones is completed and operation at nominal intensity started yesterday.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
SPSC113 summary for EATM Lau Gatignon / EN-MEF Open Session:WA104, WA105, RD52, NA62, AEgIS, GBAR Closed Session:Neutrinos, P348, AD experiments, DIRAC,
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
SPSC120 Summary L.Gatignon, EATM, AD experiments, P348, SHiP, NA61, tour of experiments.
1 Heavy-Ion Physics at J-PARC Shoji Nagamiya RIKEN / KEK / JAEA January 20, 2016 Tokai 1) Motivation 2) J-PARC vs. FAIR.
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
RF separated beam and other beam issues Lau Gatignon, COMPASS workshop, 22 March 2016.
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
SPSC114 summary for EATM Lau Gatignon / EN EATM, 15 July 2014 Open Session:OPERA, ICARUS, NA63, COMPASS, CLOUD, P349 (pbar polarization) Closed Session:Neutrinos.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Slide 1 Overview Introduction Stochastic Cooling History of the Antiproton machines at CERN The AD and ELENA Conclusion.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
ELENA installation progress F. Butin / ELENA collaboration.
Jayakar Thangaraj Fermilab Accelerator Advisory Committee November 7-9, 2011 PROTOPLASMA: Proton-driven wakefield experiment at Fermilab.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
1 NA61/SHINE Collaboration Metting, Dubna, April 7-11, 2014 NA61/SHINE news and plans (October 2013-February 2014) Published papers: Measurements of production.
ICE SECTION The coolest place to be! Elias Métral
SPSC125 Report Open Session: NP01 (WA104) NP02 (ProtoDune-DP)
NA61 news and plans (May 2013-October 2013) Publications:
Francois and Lau EATM 17 July 2012
Outlook by the Physics Coordinator
CONVENTIONAL BEAMS WG Lau Gatignon, Markus Brugger, CERN/EN/EA
News and brief overview of Beamline plans for the next few months
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Olof Bärring LCG-LHCC Review, 22nd September 2008
LIU, ABP-CWG, PBC, miscellaneous
NA61 news and plans Progress in 2010 Revised data taking
NA61 news and plans News from other labs/experiments
of secondary light ion beams
of secondary light ion beams
nuSTORM and the Physics Beyond Colliders workshop
YETS Dec 2017 – March 2018 LS Experiments requirements / Services (un)availability F.Butin / EN-EA EACM meetings outcome, thanks to all participants.
NA61 status and plans Preliminary spectra for T2K 2009 run
András László (for the NA61/SHINE Collaboration)
Snowmass on the Mississippi
Alpha, Beta, and Gamma Decay
Summary SPSC meeting November 2005 for EA section meeting
2003 test beam with 25 ns bunched muons
ELENA Extra Low ENergy Antiproton Ring
Present and Future test facilities for High-intensity Targetry CERN
Beam Dump Experiments with Photon and Electron Beams
Experimental Areas – LS2 planning
Laser Und XFEL.EU Experiment
PAC47 Charge Robert McKeown PAC47 July 29, 2019.
Presentation transcript:

SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016

Accelerator and EA reports The SPSC supports the replacement of the TIDVG during the EYETS, as the intensity limitations will be problematic otherwise. The AEGIS ECR for a new zone is almost ready for submission. The cryogenic line for the AD experiments is still considered important for those experiments and installation during LS2 at the latest is strongly recommended by the committee. The SPSC notes the on-going effort of the review of the experimental magnets in the secondary beam areas and is looking forward to the measures taken to ensure stable future running of the experiments. A new MPS will be funded for the Morpurgo magnet. The SPSC encourages the Neutrino Platform teams to perform muon flux measurements in the pits asap. LG, EATM, 25-10-2016 SPSC123 Summary

ALPHA-g PROPOSAL This is a full proposal for adding a vertical trap to ALPHA for gravitational measurements. This will be installed in the extension of the ALPHA zone and start operation in late 2017. In a first phase the sign of the gravitational force on anti-matter will be measured and at a later stage the strength to 1%. Alpha-g has been recommended for approval. The Helium consumption has to be checked, where in the worst case Alpha-2 and Alpha-g may not be able to run in parallel. LG, EATM, 25-10-2016 SPSC123 Summary

ALPHA-g Use vertical trap to measure gravitational constant for anti-Hydrogen. Phase 1: measure sign Phase 2: measure the strength to 1% Slow Hbar release through the atom trap Could start running late 2017 Relies on the ALPHA zone extension (approved by IEFC) No significant request to CERN otherwise, apart from possibly the Helium consumption? If problem, can run in alternation with Alpha-2. LG, EATM, 25-10-2016 SPSC123 Summary

LG, EATM, 25-10-2016 SPSC123 Summary

Open presentations NA61 has very significant beam requests for 2017 and 2018, which will be in conflict with requests from other users. In particular they request 60d of Pb running in 2018. Their request for long periods of low energy may be incompatible with H4 operation. They repeat that more low-energy protons would be an advantage. For running beyond LS2 (open charm, multistrange baryons, etc) major upgrades will be required. The committee is worried about the FTPC delays. UA9 has essentially reached its main objective of demonstrating collimation. They had many good results in H8, but have difficulties with the CpMT Cerenkov counter. The committee wants more precise justification and details for their significant 2017 beam request. The committee recognizes the excellent progress of AWAKE, who are still on schedule, but the plasma wakefield acceleration physics has yet to start. It is therefore too early to make recommendations for the Run-II plans and resources. DIRAC will submit a LOI for an experiment at the SPS in April 2017. LG, EATM, 25-10-2016 SPSC123 Summary

Expressions of Interest EOI012 for the measurement of charged baryon magnetic moments at the SPS and LHC is rather vague and will initially be followed via PBC. EOI013 proposes to measure the spectrum of muons emerging from a SHiP replica target exposed to a 400 GeV beam in NA61. There is no agreement yet on details of financing and on the planning. The committee encourages SHiP to continue discussions, as the measurements of these spectra are important for the muon shield design. EOI014 (ENUBET) has received a 2 Meuro ERC grant to study a neutrino beam (slow extracted) with tagging of the kaon component via Ke3 decays. For the moment this is a study requiring some manpower and expertise from CERN for supervision of postdocs. The collaboration has to provide more details on their request. LG, EATM, 25-10-2016 SPSC123 Summary

Ongoing experiments ATRAP suffered from air conditioning problems and they claim that one laser failure may have been caused by that. BASE is still running on 2015 antiprotons and would like a zone enlargement once ELENA is operational. Most AD experiments request power, cryogens and cooling during LS2 and SPSC supports this request. NA63 will request a 2-week run for radiation reaction measurements in 2017 – need proposal for January meeting. The SPSC recommends the COMPASS Drell-Yan run for 2018 and encourages COMPASS to upgrade the Cedars (mainly electronics and temperature stabilization). NA64 showed extremely encouraging results from their July run. LG, EATM, 25-10-2016 SPSC123 Summary

Other experiments Many AD experiments (ALPHA, AEGIS, BASE) need LHE, power, cooling during LS2. Experiments activity in LS2: implications to be understood soon. BASE requests a small extension to their zone once ELENA is operational (space should be available) They are still running on 2015 antiprotons! COMPASS: the SPSC recommends a second Drell-Yan run in 2018 with an upgraded CEDAR (COMPASS electronics, temperature stability) LG, EATM, 25-10-2016 SPSC123 Summary

General News PBC next steps LG, EATM, 25-10-2016 SPSC123 Summary

PBC next steps (2) LG, EATM, 25-10-2016 SPSC123 Summary