Road Pricing in the Netherlands

Slides:



Advertisements
Similar presentations
Tackling the Environmental Impact of Transport Presentation by David Jamieson MP to the Institute for Public Policy Research Wednesday 15th October 2003.
Advertisements

GREEN PAPER "TOWARDS A NEW CULTURE FOR URBAN MOBILITY" EUROPEAN COMMISSION.
Transport Study to support an impact assessment of the Urban Mobility Package on SUMPs CoR Meeting June 13 DG MOVE.
inter-regional road charging project in Belgium
Preparations for the Mileage Charging Electronic Toll Collection in Hungary Árpád G. Siposs, Toll Strategy Manager, KKK Coordination Centre for Transport.
Roadpricing in the Netherlands A story about ups en downs.
Road Safety Policy in the Netherlands Road safety policy in the Netherlands
Introduction to CIVITAS‘ Definition of “Collective Passenger Transport“ and a Snapshot of its Results 13 September 2011 Brussels, Belgium Siegfried Rupprecht,
Counting the Dutch, The Future of the Virtual Census in the Netherlands Presentation at the seminar Counting the 7 Billion 24 February 2012 * Geert Bruinooge.
Action Plan on Urban Mobility
0 Ministry of Transport, Water Management and Public Works Directorate-General Rijkswaterstaat Transport Research Centre Road Pricing Seminar Valencia,
Mobility Taxes in Germany – Experience and recent developments BrusselsMay 31, 2011.
COUNTRY STUDY - POLAND POLISH PROGRAMME OF MOTORWAYS CONSTRUCTIONS - BARRIERS OF IMPLEMENTATION Prof. Jan Burnewicz, dr Monika Bak University Of Gdansk.
Road charging and vehicle taxation - the EU perspective
Non-conventional Financing in Public Transport Francis Cheung AVV Transport Research Centre Ministry of Transport, Public Works and Water Management The.
Dynamic Speed Limits to improve local air quality Henk Stoelhorst Rijkswaterstaat, Centre for Transport and Navigation.
Car sharing in European CIVITAS cities lessons learned and evaluation May 21th, 2015 Utrecht, The Netherlands Janiek de Kruijff, CIVITAS & TNO.
1 Road Pricing in the Netherlands Workshop on Road User Charging Systems Warsaw, June 11 and 12, 2007 Ronald Keus and Jan Vis Ministerie van Verkeer en.
Quantifying Impacts of Transport- Related CO 2 Abatement Policies Roundtable on Transport - Related Climate Change Problems OECD Environment Directorate.
Harmonisation of the Public Transportation of Slovenia with the EU: A Need for New Financing and Organisation Solutions ? Stanislav Bozicnik University.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
环境保护部环境规划院 Study on Design of Wastewater Tax: from Wastewater Pollutant Discharge Levy to Environmental Tax Ge Chazhong Chinese Academy For Environmental.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
European Commission - Directorate General for Energy and Transport 1 European transport infrastructure charging policy Christophe Deblanc DG TREN.
EFC issues for NRA’s Conclusions & recommendations Status report activities EFC workgroup.
Gzim Ocakoglu European Commission, DG MOVE World Bank Transport Knowledge and Learning Program on Intelligent Transportation Systems (ITS), 24/06/2010.
PUBLIC TRANSPORT IN SKOPJE: NEW APROACH FOR BETTER QUALITY OF SERVICE
Pricing policies for reducing CO 2 emissions from transport Huib van Essen Manager Transport CE Delft.
UITP EUROPEAN POLICIES – A UITP PERSPECTIVE EMTA MEETING, LONDON, 09/10/14.
Transit Oriented Development in the city region; a dream? Reindert Augustijn Team manager traffic and transport Stadsregio Arnhem Nijmegen.
Flood Insurance in The Netherlands Ministerie van Verkeer en Waterstaat Dutch Ministry of Transport, Public Works and Water Management Directorate General.
Why reform transport prices? An overview of European transport infrastructure charging policy and research Chris Nash, Bryan Matthews and Batool Menaz.
Financing and regulating highway construction in Scandinavia – experiences and perspectives Svein Bråthen Molde University College
EFC issues for NRA’s Conclusions & recommendations.
Development of a Financing Model for oily and greasy ship waste Hans Berger via donau – Austrian Waterway Company Budapest,
Civil and Environmental Engineering 1 Norway’s toll rings: Full scale implementations of urban pricing Dr. Terje Tretvik - SINTEF, Norway IMPRINT-EUROPE.
STEPS FOR FUNDING ELI-NP March 11 st 2011 Dan Cutoiu.
IZABELLA K. LENTINO JORGE MARTINS MILENA BODMER presents Joint development feasibility.
Herry-Warsaw-Presentation – ppt MOT&WB- Charging-WS - Road User Charging in BULGARIA - Warsaw, June 2007 Folie 1 Ministry of Transport &
13 February 2007, Brussels Electricity Infrastructure Workshop Shaun Kent, co-chair Electricity Regional Initiative TF.
1 februari 2007 Martha Brouwer (program manager Traffic Management and Public Transport) Network Operations in the Netherlands.
Transport The new TEN-T guidelines Results of the legislative procedure Philippe Chantraine (MOVE B1), 24 June 2013.
EU Infrastructure charging and investment policy Christophe Deblanc DG TREN.
Planning for People – an overview of the SUMP concept and its benefits UBC Joint Commission meeting in the City of Tallinn10-12 April 2013 Maija Rusanen.
Jonathan Goldberg - EMTA Draft regulation on public passenger transport services by rail and by road Progress report - October 2006 EMTA General meeting.
Facilitation of use of green transport - electromobility Ministry of Transport Ministry of environmental protection and regional development of the republic.
Study on Regulatory Options for Further Market Opening in Rail Passenger Transport Stakeholder Meeting 10 February 2010 Session 2B Great Britain Case Study.
Amman October 1-2, 2003 Presentation Evolution of Saudi Telecom During Sector Reform 3 rd Annual Private Sector Cooperation Meeting in the Arab Region.
Finnish NGA state-aid scheme Antti Kohtala Ministry of Transport and Communications Finland Digital Agenda Assembly, Brussels, 16th June 2011.
Athens, Conference Hall, Ministry of Infrastructure, Transport and Networks, 5&6 November 2015 ALTERNATIVE-COLLECTIVE PATTERNS OF OWNERSHIP AND USE OF.
6/2008 Keeping Finland Moving. 2 6/2008 Jukka Hirvelä Facts about Finland km² of which 77% is forest and 10% lakes and inland waterways. Built-up.
EasyWay - conclusion.
in Croatian Track access charging system
Marek Stavinoha Legal officer DG MOVE A4 European Commission
West of England Joint Transport Study
Advertisement of prices: the Mexican experience
Welcome to CIVITAS.
Module 8 : Implementing Port Reform
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Can we have efficient and sustainable without adequate infrastructure
Third progress report on cohesion 17 May 2005
progress of the water reform in bulgaria
Recent developments in the EU transport policy
Task Force on Passenger Mobility Statistics 11 October 2018
European Economic and Social Committee
Road Pricing in the Netherlands
FINANCING ROAD INFRASTRUCTURE
Welcome to CIVITAS.
Ministry of National Economy of The Republic of Kazakhstan
Presentation transcript:

Road Pricing in the Netherlands Workshop on Road User Charging Systems Warsaw, June 11 and 12, 2007 Ronald Keus and Jan Vis Ministerie van Verkeer en Waterstaat

Contents History of Pricing Policy in the Netherlands Current pricing policy in the Netherlands Scope of the Kilometre Charge (KMP) Cabinet’s decision

The Netherlands Population: 16.2 million 8+ million vehicles 2400 km motorways >134.000 km roads in total >100 billion km made on yearly basis Daily congestion problems, in particular related to the economic centre (Amsterdam, Utrecht, The Hague and Rotterdam) Total 6.8 billions of vehicle taxes (BPM and MRB taxes) on a yearly base (including provincial taxes) 350 border crossings The Netherlands

Previous Dutch RUC attempts 1988: Rekening Rijden I 1992: Spitsvignet 1994: Rekening rijden II 1999: Spitstarief + investments package 2001: Kilometer Charge Untill 2005 without success. Failed because of insufficient political support

Lessons learned From our own history: From experiences abroad: Political and public acceptance is the biggest problem, and not the technique Show the (tax)payer where the revenues are spent on Show the (tax)payer that the system is fair: To pay for use of the road To pay for pollution From experiences abroad: ‘Keep it simple’ ‘start at a small scale, but start at least’ Pricing policy requires politicians with courage

Recent history The Platform and their advice (2005) A breakthrough was needed Introduction of an advisory Platform The main social and business society where involved E.g. motorists association, environmental groups, representatives of employers and employees, regional governments, etc. Chairman was mr Nouwen (1999 former opponent) The Platform came with their advice in May 2005: Several concepts of charging discussed Selected option: price per kilometre (KMP) for all vehicles on all roads. Based on time, location and environmental aspects. Feasible by 2012-2014. Chairman Nouwen was former chairman of the motorists association. He was responsible for the campaign against Rekeningrijden at the time of Minister Netelenbos Market principles: prices instead of taxes, paying for possession I.s. paying for use, revenues used for infrastructure, one national organization for collecting the revenues, private involvement in infrastructure development, independent Road Authorities

Recent history Advice of the Platform Effects of KMP, differentiated on the basis of time, place and environmental characteristics Calculations based on average rate of 3,4 eurocent per kilometre, and a congestion rate of 11 eurocent per kilometre Reduction of travelling time during congestion Improvement environment road safety Investment costs Introduction Prosperity KMP, Differentiated on the basis of time, place and environmental aspects ± 60% upto 10% ± 3 billion 2012-2016 ± 1 billion

Road pricing in the Mobility Plan (September 2005) Advice of Platform leading principle in the Mobility Plan It‘s effective, fair and transparent And contributes to accessibility and environment quality Strategic considerations: To preserve the public support: stay close to the opinion of the Platform It presents a step-by-step approach A quick start with famous traffic black spots or bottlenecks And step by step towards full-scale road pricing (kilometre price)

Current pricing policy Current Coalition Agreement Objectives and scope of the KMP Tentative schedule KMP Main additional requirements Market consultation Joint Fact Finding How further? Cabinet’s decision

Coalition Agreement, 7 February 2007 “To improve the accessibility by road in general, and in particular in the Randstad, the system of a kilometre charge (differentiated on the basis of time, place and environmental characteristics) will be introduced in the coming cabinet period, if necessary in stages. This under the conditions that the current taxes (BPM, MRB, Eurovignet) will be converted into a kilometre charge, and that the system costs and costs of billing and payment collection are not higher than 5% of the revenues.” Randstad = (urban agglomeration of Western Holland), BPM = tax on purchase of passenger cars and motorcycles MRB = vehicle tax

Will he make the difference ?

Objectives and scope of the KMP Primary: pay for usage (‘fairness’) Secondary: congestion/economy and environment Scope of the KMP All motor vehicles, passenger + freight All roads in NL Differentiate by time of day and location Differentiate by (environmental) characteristics of vehicle Conversion of current tax system (for purchase and ownership of a vehicle) into a new system (use of the vehicle)

Main additional requirements Free-flow operation European interoperability directive … Easy to use and understand the scheme Accuracy sufficient for credibility 99% of invoices less than 1% deviation (?) Respect user privacy Costs visible in the vehicle (?) System should be able to support toll/point charges System scalable and to allow stepwise implementation Adequate prevention / detection of fraud Flexibility for changes in road network, tariff structure

Tentative schedule KMP 2005 2006 2007 2008 2009 2012 Km-price Research agenda = go/no go N Price per kilometre draft bill O T Joint Fact Finding A Preparing for policy choices M Implementation strategy Including tax transition issues O B I Realisation of public component L I Cost monitor Cost monitor T Cost Monitor E I Requirement Specifications T Tender Realisation of private component 3 Social implementation en communication

Main questions Market Consultation (2006) Can the KMP be achieved? Which requirements are difficult to realise ? Can the KMP be achieved at acceptable costs ? Investment << € 3 billion Operational cost < 5% of revenues Involved: industry, toll operators, consultants Phase 1: 42 interviews (industry, operators, consultants) Phase 2: 12 assignments

Main message market consultation Yes, the KMP can be achieved 2012 is feasible, provided that .... Estimates initial investment: 30% lower Estimates operational costs: scattered image, but tendency towards 5% objective can be observed Limitations of results of market consultation: Requirements not sufficiently clear yet Organisation & business model / public – private undecided (including allocation of risks) No operational examples to compare Commercial bias

Joint Fact Finding (2006 and beginning 2007) Together with local governments, social and business society, other Ministries Preparation of policy choices: Rate structure, congestion mark-up, differentiation on the basis of environmental characteristics Conversion of current vehicles taxes Organisational issues: public/private division of task and responsibilities enforcement Communication with citizens and companies

How further? Second half of 2007: Planning legislation Cabinet’s decision Implementation strategy and policy choices Planning legislation December 2007: Draft to Lower House and EU for notification Beginning 2008: start discussion with Lower House Preparations for tendering procedure: End of 2007; New cost monitor

Cabinet’s decision (second half of 2007) Scope of Cabinet’s decision Conversion of current (fixed) vehicle taxes into the kilometre charge (KMP) Amount of reduction of the current vehicle taxes; How to introduce the kilometre charge and to reduce the vehicle taxes?; Rate structure Differentiation according to environmental characteristics and according to time en place Organisational and legislative issues Who decides about the rates?, Is the kilometre price in legal terms a tax or a levy? Exemptions

Thanks for your attention www.verkeerenwaterstaat.nl  English  Roadpricing