Updates to the Path Rating Process for Approval by the PCC

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

WECC Operating Committee Request for Discussion and Guidance MOD-001-WECC-RBP-0 Reliability Data Exchange (MOD) October 24, 2013.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
Operating Transfer Capability Policy Committee Report Board of Directors Meeting April 21 & 23, 2004 Thomas A. Delawder OTCPC Chair Western Electricity.
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Western Electricity Coordinating Council Status of NERC Standards Activity WECC PCC Meeting March 6-7, 2008.
POTF Status update.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Phase II – Analyze the Identified Issues from Perspectives of Alternative Approaches Determine which of the identified issues remain under alternate approaches.
Western Electricity Coordinating Council 1 WECC MIC Meeting Report on Operating Transfer Capability Policy Committee (OTCPC) Marina Del Ray October 30.
MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.
Path Operator Task Force Recommendation
PER
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
Path Operator Implementation Team Report to OC March 25, 2015.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
WECC Path Concept Task Force Report to PCC March 26, 2014 Chifong Thomas.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
Business Practices Subcommittee Update Executive Committee Meeting October 20, 2015.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Western Area Power Administration Transmission Customer Meeting October 17, 2007.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Business Practices Subcommittee Update Executive Committee Meeting February 23, 2016.
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Bert Peters Chair, Path Operator Task Force
WECC – NERC Standards Update
Kenneth Silver Los Angeles Department of Water & Power
RASRS Report to Operating Committee March 21, 2017
Western Electricity Coordinating Council
Transposition of European Network Codes
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Unscheduled Flow Administrative Subcommittee Report
WECC Regional Standards Update
Path Operator Implementation Task Force
Business Practices Subcommittee Update
Western Electricity Coordinating Council
WECC-0118 Removal of Interchange Authority
Unscheduled Flow Administrative Subcommittee MIC/OC Report
Kenneth Silver Los Angeles Department of Water & Power
Merrill Brimhall – Engineer, Staff
Project WECC-0100 Update Load Modeling Task Force
Planning Tools Overview
Determine Facility Ratings, SOLs and Transfer Capabilities
Reliability Assessment Committee Reliability Workshop Priorities
Vic Howell – Mgr. Operations Engineering Support
Enhanced Curtailment Calculator (ECC)
Reliability Assessment Committee Reliability Workshop Priorities
Planning Tools Overview
Project WECC-0100 Update Reliability Subcommittee
Unscheduled Flow Administrative Subcommittee ISAS Report
Steve Rueckert – Director of Standards
Palo Verde-COI RAS Retirement
Project WECC-0100 Update Load Modeling Task Force
WECC – NERC Standards Update
Palo Verde-COI RAS Retirement
Peak Reliability IRO Webinar
Document Categorization Policy
Bert Peters Chair, Path Operator Task Force
Presentation transcript:

Updates to the Path Rating Process for Approval by the PCC Chifong Thomas October 14-15, 2015

Western Electricity Coordinating Council In PCC meeting in July 2015 Peak RC with change its SOL methodology to be implemented, only Paths that are stability limited with have “Path SOL” Path that are thermal limited will have Path TTC SOL Exceedance is not allowed; TCC will respect the SOLs Action Item: Review and identify language updates needed for path rating process to replace references to System Operating Limits (SOL) and bring back to PCC for review in October. Western Electricity Coordinating Council

Western Electricity Coordinating Council Review Results There were 4 instances where the word “System Operating Limit” or “SOL” appear in the “Project Coordination, Path Rating and Progress Report Processes” Page 29 – on Criteria for Paths subject to the Path rating Process Page 97 – no change needed because the reference is on “WECC SOL Methodology” in general Western Electricity Coordinating Council

Changes Proposed on Page 29 Transmission paths shall complete the Path Rating Process specified in this document and obtain an Accepted Rating if any of the following criteria apply: The limiting condition (e.g., thermal limit, stability, or voltage) in determining the Total Transfer Capability of the path or the Ssystem Ooperating Llimit for transmission facilities that impact the path is on another system and the affected member system requests the path be rated. The path must be operated within the constraints of a nomogram to meet NERC Reliability Standards and WECC Criteria, the elements of the nomogram (e.g., path flows or generation levels) are in different systems, and one of those systems or a neighboring member system requests the path be rated. The path owners or operators have requested a seasonal or operational Total Transfer Capability System Operating Limit for a new path or the path owners or operators have requested a seasonal System Operating or operational LimitTotal Transfer Capability that is in excess of an existing path’s rating (Accepted, Existing, or Other). A facility (generator, series, or shunt reactive equipment; Remedial Action Scheme; etc.) that an Existing or Accepted Rating depends on is modified9 or retired from service, without regard to whether the facility is owned by the same system as the rated path. Western Electricity Coordinating Council

Western Electricity Coordinating Council Proposed Motion PCC approves the proposed changes to be implemented after WECC approves the elimination of the Path SOL for non-stability limited Paths. Western Electricity Coordinating Council