Accelerator R&D for the Super-B Factory

Slides:



Advertisements
Similar presentations
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Advertisements

KEKB Design 1.Parameters 2.Collider Ring 3.Interact Region 4. Magnet, RF, Instabilities 5.Recent progress with crab crossing.
SuperKEKB Lattice and Dynamic Aperture H. Koiso Apr. 20, 2005 Super B Factory Workshop in Hawaii.
July 24, 2008Super-B Mini-MAC MeetingPage 1 Super-B Overview John Seeman Accelerator Systems Division SLAC.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Ion Polarization Control in MEIC Rings Using Small Magnetic Fields Integrals. PSTP 13 V.S. Morozov et al., Ion Polarization Control in MEIC Rings Using.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Nonlinear Dynamic Study of FCC-ee Pavel Piminov, Budker Institute of Nuclear Physics, Novosibirsk, Russia.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
SLAC Accelerator Development Program: SuperB Mike Sullivan OHEP Accelerator Development Review January 24-26, 2011.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Summary of Accelerator parallel sessions M.Biagini on behalf of 23 speakers SuperB09, LAL, Feb. 16 th 2009.
TDR and R&D Plans J. Seeman and M. Biagini For Super-B Staff.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
M Sullivan SuperB Workshop Elba, Italy May 31 - Jun 3, 2008
JLEIC simulations status April 3rd, 2017
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
SuperB Injection, RF stations, Vibration and Operations
Large Booster and Collider Ring
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
Accelerator Physics Technical System Group Review
The PEP-II Interaction e+e- Factories Workshop
Updates on IR and FF for super-B factory
Accelerator Overview M
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Super-B Overview John Seeman Accelerator Systems Division
Capture and Transmission of polarized positrons from a Compton Scheme
SuperB RF and Other Components
SuperB Accelerator Overview and Status
Interaction Region Design Options e+e- Factories Workshop
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Accelerator R&D Results from the B-factory
CLIC damping rings working plan towards the CDR
Accelerator and Interaction Region
AC Power for a Super-B Factory
Some notes on the SuperB Dynamic Aperture
Summary of Washington DOE Review
J. Seeman SLAC Paris Super-B 5th Workshop May 9-11, 2007
Super-B Accelerator Overview
BINP Tau-Charm Project Update E.Levichev, BINP, Novosibirsk
Polarization at the Super-B Factory
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
Ion Collider Ring Chromatic Compensation and Dynamic Aperture
J. Seeman Perugia Super-B Meeting June 2009
SuperB Accelerator Overview
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Electron Collider Ring Magnets Preliminary Summary
MEIC New Baseline: Luminosity Performance and Upgrade Path
Multi-Ion Injector Linac Design – Progress Summary
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
First Look at Error Sensitivity in MEIC
Update on JLEIC Electron Ring Design
Compensation of Detector Solenoids
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
JLEIC Collider Rings’ Geometry Options (II)
MEIC New Baseline: Performance and Accelerator R&D
Status of IR / Nonlinear Dynamics Studies
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Upgrade on Compensation of Detector Solenoid effects
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Current Status of Ion Polarization Studies
DYNAMIC APERTURE OF JLEIC ELECTRON COLLIDER
Report on Electron Polarization Study
Presentation transcript:

Accelerator R&D for the Super-B Factory J. Seeman SLAC Paris Super-B 5th Workshop May 9-11, 2007

CDR Very good technical start. All accelerator topics were covered and many at considerable depth. Several topics deserve further study to clarify issues. Some engineering and physicist time is needed to take the next step.

Accelerator Physics Study beam dynamics of two IRs. Studies needed to find acceptable dynamic aperture with crab waist sextupoles. Refine tuning procedures for small x and y emittances given probable lattice errors. Carry out further vibration tolerance studies and reduction.

Interaction Region Location optimization of Crab Waist sextupoles Vacuum system layout of +/- 10 m. Design the “magic flange” near the Be chamber. Masking and collimation in the +/- 50 m of the IR. Design for dynamic stabilization of the IR quadrupoles (active reactive masses?). Detector solenoid compensation and extra skew quadrupoles for vertical emittance control.

Vacuum System Extrusion design with ECI electrodes. How to best reuse PEP-II chambers. Make design of feedback cavities with 2 nsec bunch spacing.

Injection Clarify beam phase space for injection. Further define injection hardware parameters at the injector-ring interface. Define polarization manipulation for the injector.

Polarization Define IR geometrical layout with spin rotators. With above, determine the depolarization time and average longitudinal polarization.

Utilities Define next step of the surface building requirements. Start engineering cost validation. Make a first utility system layout.

Conclusions Great start. Looking forward to the next phase of the design study.