The Nuclear Power Sector in the Republic of Korea: Nuclear Materials Management/ Fuel Cycle Practices, Plans and Policies Jungmin KANG CISAC, Stanford.

Slides:



Advertisements
Similar presentations
Interim Dry-cask Storage vs. Spent-fuel Reprocessing Frank von Hippel, Princeton University Co-chair, International Panel on Fissile Material (IPFM) Senate.
Advertisements

Nuclear Power Generation in China WANG Jie, YU Xiaoli, YANG Xiaoyong INET, Tsinghua University, China Sept. 24, 2010.
April PART I : Status of nuclear industry in Korea PART II : Romania-Korea Cooperation status PART III : Cooperation with Korea PART I : Status.
Line Efficiency     Percentage Month Today’s Date
Hydrology and Hydraulics. Reservoir Configuration.
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
Indian strategy for management of spent fuel from Nuclear Power Reactors S.Basu, India.
Nuclear Training & Education Center
Mid-long term R&D step by step plan in order to implement the recycling at the maximum extension possible Gunnar Olsson and Lise-Lotte Spontón TW5-TSW-001,
TACSS Workshop Korea’s Experience on Nuclear Technology Transfer, Its Indigenous Development and Future Planning 19 September 2006 Poong Eil Juhn, Ph.D.
International Relations (13) Korean Nuclear Power/Weapons 김 병 구
June 8, CMBG Conference. 2 Part  What is KHNP? KHNP : Korea Hydro & Nuclear Power Company - Korea’s largest power generator, sole utility.
Nuclear Energy in Korea
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
CANDU Fuel Options: Practical Adaptability Jerry Hopwood Vice President, Marketing & Product Development World Nuclear Association, Annual Symposium September.
PBNC- 1 Overview of US Nuclear Energy Initiatives /06- 1 Harold McFarlane President American Nuclear Society.
Nuclear Issues in South Korea Introductory Brief of Spent Fuel Management Reform & Nuclear Power Debates in South Korea Kwanghoon Seok, Green Korea United.
Potential Regional Nuclear Spent Fuel Management and Regional Uranium Enrichment /Reprocessing Paths for Asia Jungmin KANG CISAC, Stanford University 2007.
1 RIC 2009 Current Research Issues in PSA: Korean Status Joon-Eon YANG Integrated Safety Assessment Division Korea Atomic Energy Research Institute 10.
1 Massimo SALVATORESiemtp 8 – November th Information Exchange Meeting on Actinide and Fission Product Partitioning and Transmutation University.
Current Status and Challenging Issues of Nuclear Energy in Korea Park, Yong Taek President & CEO Korea Power Engineering Company, Inc. 18th World Energy.
Update on Recent International Cooperation on National Accounts in China Shuchang QI 6-10 Nov, 2006.
International Relations (9) Nuclear Power in ROK 김 병 구
Korea & the World (9) Nuclear Power in ROK 김 병 구
Korea & the World (9) Nuclear Power in ROK 김 병 구
Report on Spent Fuel Research and Analysis in the Republic of Korea Jungmin KANG CISAC, Stanford University EASSC 2006 Meeting Beijing, China, November.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
1 Upper Basin Snowpack as of 3/26/2014
The Egyptian Nuclear & Radiological Regulatory Authority (ENRRA)
July 11-13, 2005 Chan-Hee Cho Korea Electric Power Research Institute Data Analysis Performance Demonstration in Korea.
Natural Resources Defense Council
Project Manager of Project Department
Jan 2016 Solar Lunar Data.
IT Strategy Roadmap Template
János Krutzler Hungarian Atomic Energy Authority
Maximum and Minimum Nuclear Power Paths for the Republic of Korea
The 6 steps of data collection:
Q1 Jan Feb Mar ENTER TEXT HERE Notes
Average Monthly Temperature and Rainfall
Apr-Jun Jan-Mar Jul-Sep Oct-Dec
Regulatory Control Training Workshop
2014 YEAR PROGRAM (based on decisions made)
2017 Jan Sun Mon Tue Wed Thu Fri Sat
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com

Radioactive Waste and Spent Fuel Management in Hungary
Jan Sun Mon Tue Wed Thu Fri Sat
Model 7: Results and Sensitivity Analysis
Electricity Cost and Use – FY 2016 and FY 2017
CYCLE 2019 Application Process & Timeline
Grouping Programs by Market Sector
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Advancing the Development Of Nuclear Power In China
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com
Information on work related to
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Conducting Multi-program Visits with
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Regulatory system in Hungary
Presentation transcript:

The Nuclear Power Sector in the Republic of Korea: Nuclear Materials Management/ Fuel Cycle Practices, Plans and Policies Jungmin KANG CISAC, Stanford University 2006 AES Meeting Beijing, China, November 6-7, 2006

Contents The ROK nuclear power plants deployment scenario Generation of spent fuels and storage capacities in the ROK Recent issues in the ROK spent fuel management Concluding remarks

I. ROK nuclear power plants deployment scenario Figure 1. Nuclear power plants sites in the ROK

I. ROK nuclear power plants deployment scenario (cont’) Figure 2. Current and planned nuclear power capacity in the ROK, based on the long-term electricity plan in 2006

I. ROK nuclear power plants deployment scenario (cont’) Table 1. Current and planned nuclear power capacity in the ROK Site Unit Type Capacity (MWe) Initial Operation Kori Kori-1 Kori-2 Kori-3 Kori-4 Sinkori-1 Sinkori-2 Sinkori-3 Sinkori-4 PWR 587 650 950 1000 1400 Apr. 1978 Jul. 1983 Sept. 1985 Apr. 1986 Dec. 2010 Dec. 2011 Sept. 2013 Sept. 2014 Yonggwang Yonggwang-1 Yonggwang-2 Yonggwang-3 Yonggwang-4 Yonggwang-5 Yonggwang-6 Aug. 1986 Jun. 1987 Mar. 1995 Jan. 1996 Apr. 2002 Oct. 2002 Ulchin Ulchin-1 Ulchin-2 Ulchin-3 Ulchin-4 Ulchin-5 Ulchin-6 Sinulchin-1 Sinulchin-2 Sept. 1988 Sept. 1989 Aug. 1998 Dec. 1999 Jul. 2004 Jun. 2005 Dec. 2015 Dec. 2016 Wolsong Wolsong-1 Wolsong-2 Wolsong-3 Wolsong-4 CANDU 679 700 Apr. 1983 Jul. 1997 Jul. 1998 Oct. 1999 Sinwolsong-1 Sinwolsong-2 Oct. 2011 Oct. 2012

I. ROK nuclear power plants deployment scenario (cont’) Table 2. Number of NPPs in the current sites of the ROK Site Type Current and planned by 2016 Maximum deployable Kori PWR 8 12 Yonggwang 6 Ulchin 10 Wolsong CANDU 4 2

I. ROK nuclear power plants deployment scenario (cont’) Table 3. Assumed cases for the conceivable NPPs deployment scenario in the ROK Case Assumption Case 1 No replacement of NPPs once they are decommissioned Case 2 Replacement of NPPs with decommissioned ones in 10 years after shutdown by 2050 (1.4GWe PWRs for decommissioned PWRs while 0.7 Gwe CANDUs for decommissioned CANDUs) Case 3 Replacement of NPPs with decommissioned ones in 10 years after shutdown by 2050 (1.4GWe PWRs for decommissioned PWRs and CANDUs) Case 4 In addition to Case 3, further deployment of eight 1.4GWe PWRs since 2017 (one in each year) (i.e., +4 units at Kori, +2 units at Ulchin, +2 units at Wolsong)

I. ROK nuclear power plants deployment scenario (cont’) Table 4. Assumed cases for the conceivable NPPs deployment scenario in the ROK (cont’) Sub-case Assumption Sub-case 1 No life-time extension: 40y for less than 1.0 GWe PWRs, 60y for 1.4GWe PWRs, and 30y for CANDUs Sub-case 2 Life-time extension: 50y for less than 1.0 GWe PWRs, 60y for 1.4GWe PWRs, and 30y for CANDUs Sub-case 3 Life-time extension: 60y for less than 1.0 GWe PWRs, 60y for 1.4GWe PWRs, and 30y for CANDUs Sub-case 4 Life-time extension: 50y for less than 1.0 GWe PWRs, 60y for 1.4GWe PWRs, and 40y for CANDUs Sub-case 5 Life-time extension: 60y for less than 1.0 GWe PWRs, 60y for 1.4GWe PWRs, and 40y for CANDUs

I. ROK nuclear power plants deployment scenario (cont’) Figure 3. Installed nuclear capacity in the ROK (case 1)

I. ROK nuclear power plants deployment scenario (cont’) Figure 4. Installed nuclear capacity in the ROK (case 2)

I. ROK nuclear power plants deployment scenario (cont’) Figure 5. Installed nuclear capacity in the ROK (case 3)

I. ROK nuclear power plants deployment scenario (cont’) Figure 6. Installed nuclear capacity in the ROK (case 4)

II. Generation of spent fuels and storage capacities in the ROK Figure 7. Projection of accumulated spent fuel in the ROK

II. Generation of spent fuels and storage capacities in the ROK (cont’) Table 5. Spent fuel inventories and storage capacities in the ROK as of the end of 2004 Site Unit Accumulated spent fuels (tHM) Current storage capacity (tHM) Year all pools at NPP site filled Kori Kori-1 Kori-2 Kori-3 Kori-4 Sinkori-1 Sinkori-2 Sinkori-3 Sinkori-4 116 254 633 412 209 360 953 485 292 2020 Yonggwang Yonggwang-1 Yonggwang-2 Yonggwang-3 Yonggwang-4 Yonggwang-5 Yonggwang-6 375 332 194 172 47 20 283 279 2012 (The ROK prepared a measure to expand the pool capacities of Yonggwang site to accommodate all the spent fuel discharged from the site till 2016 at least.) Ulchin Ulchin-1 Ulchin-2 Ulchin-3 Ulchin-4 Ulchin-5 Ulchin-6 Sinulchin-1 Sinulchin-2 319 297 127 99 470 370 2017 Wolsong Wolsong-1 Wolsong-2 Wolsong-3 Wolsong-4 2021 710 638 520 827 734 734 + 2040 (dry storage) 2007 (The CANDU spent fuel can be stored at dry storage facilities after stored in the pools for several years.) Sinwolsong-1 Sinwolsong-2 2025

III. Recent issues in the ROK spent fuel management NEC* AEC MOCIE MOST KHNP KAERI Figure 7. Authority bodies regarding spent fuel management in the ROK (* NEC is supposed to be established and have its first meeting in November 2006)

III. Recent issues in the ROK spent fuel management (cont’) Table 5. Functions of the authority bodies regarding spent fuel management in the ROK Authority Functions NEC Decision making authority in national energy and spent fuel management under the ROK President MOCIE Supporting NEC and controlling KHNP KHNP Storage of spent fuel AEC Decision making authority in nuclear energy research and development under the ROK Prime Minister MOST Supporting AEC and controlling KAERI KAERI Nuclear research and development, including R&D, so called advanced nuclear fuel cycles

III. Recent issues in the ROK spent fuel management (cont’) The National Energy Committee (NEC), chaired by the ROK president, established in November 2006, will examine plans for the spent fuel management. The Radwaste Management Division of MOCIE will support the NEC for the work of the spent fuel management. MOCIE appears has not shown much interest in recycling spent fuel. On the other hand, MOST has recently shown much interest in recycling spent fuel, especially in pyroprocessing. I think the operation of Rokkasho reprocessing plants and GNEP influenced in strengthening the MOST’s stance on the recycling policy.

IV. Concluding remarks The ROK should prepare an alternative to acquire additional storage capacity its spent fuel as pools of NPPs sites are running out of their storage capacities roughly within a decade. The newly established National Energy Committee will evaluate alternatives and make policy decisions for the long-term spent fuel management in the ROK.