-9:00: Test IP transverse adjustment (CMS) and optics verification.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Saturday ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40:
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Day :00-11:30: Optics at 3.5 TeV Optics re-measured with AC-dipole. Excellent reproducibility. Small emittance increase from AC-dipole. Collapsed.
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 11/07: Recovery Plenty of accesses.
Saturday 30th June - Sunday: Rocky !
Status of LHC Operations
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Tuesday TOTEM and transverse loss map (1) OK
LHC commissioning Week 38
Thursday morning 09:30 Dump of pPb fill.
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Monday Morning – recovery from cryo.
Monday February 28th 8h00: Injection
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Wire almost entirely through beam before BLM triggers dump
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Tuesday 17/5 10: TeV - colliding. Start roman pot alignment ...
Thursday Fill 1364 (24 bunch) dumped at 07h
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Summary for LPC (March 7th, Ralph Assmann)
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Wednesday 23/2 Thanks CRYO!!!.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
31/3/2010 Difficult day… but at the end stable beams.
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Tuesday
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Daniel, Gianluca and Belen (for the Collimator team)
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

11.12.2009 -9:00: Test IP transverse adjustment (CMS) and optics verification. Done in parallel: -First commissioning of Synchrotron light monitor (mirror adjustments)  light for Beam2 now available!  abort gap monitor -Optics measurements – verification (good optics reproducibility) 11-12-09 Summary of 11.12.2009

ScanY: CMS BX = 51 51

11.12.2009: Synchrotron Light Monitor Beam 2: 11-12-09 Summary of 11.12.2009

11.12.2009: Synchrotron Light Monitor Beam 2: 11-12-09 Summary of 11.12.2009

11.12.2009: Synchrotron Light Monitor Beam 2: Horizontal profile: Vertical pprofile: 11-12-09 Summary of 11.12.2009

11.12.2009: Abort Gap Monitor Beam2: Bunch1 – bucket 1 Bunch2 – separation 3microsec 11-12-09 Summary of 11.12.2009

11.12.2009: Abort Gap Monitor Beam2: 11-12-09 Summary of 11.12.2009

11.12.2009: Optics reproducibility 3.12 & 10.12 Top: Horizontal beta-beat Bottom: Vertical beta-beat 11-12-09 Summary of 11.12.2009

11.12.2009: Optics reproducibility 5.12 & 10.12 Top: Horizontal beta-beat Bottom: Vertical beta-beat 11-12-09 Summary of 11.12.2009

11.12.2009 -10:00: Continue beam setup for higher intensities until ca. 19:00 (TCSG/TCDQ; Transfer line collimators and TCDIs; ‘abort gap keeper’) Done in parallel: -Tune feedback commissioned for Beam1! -Injection correction for Beam1. -RF phase loop studies -dump test with new filling scheme (‘abort gap keeper’ compatible) -study on losses in MQXA IP8  linked to beam on TDI -lifetime optimization Beam2 by swapping horizontal & vertical tunes (few hours to over 25 hours) 11-12-09 Summary of 11.12.2009

11.12.2009: Tune Feedback Beam1 11-12-09 Summary of 11.12.2009

11.12.2009: Injection Oscillation Correction Beam1: 11-12-09 Summary of 11.12.2009

11.12.2009: Dump with new filling scheme Beam1: Beam2: 11-12-09 Summary of 11.12.2009

11.12.2009: Losses on MQXA in IP8 Over injection without injected beam 11-12-09 Summary of 11.12.2009

11.12.2009: Lifetime optimization Swapping horizontal and vertical tunes in Beam2: No lifetime drop if horizontal tune is on noise bump (consistent with 8 kHz) 11-12-09 Summary of 11.12.2009

11.12.2009 -19:45: Injection test with higher bunch intensity (single bunch). SPS scrapers on!  losses at end of transfer lines OK ✔ Dump and post mortem OK ✔ Change between high intensity - probe beam done via SPS scraper ✔ 20:30: Collimator setup verification with higher intensities (2 1010 / bunch) 20:50: RF cavity loss for Beam1 (only 2 cavities running) reset requires intervention by RF experts [up again at 21:50] 21:30: Problems injecting Beam2 21:40: RF low level loss for Beam2 in 2 cavities 22:00: RF OK again (problem related to crow bar fault) 11-12-09 Summary of 11.12.2009

11.12.2009: Dump of high intensity Beam1 Probe beam plus high intensity 11-12-09 Summary of 11.12.2009

11.12.2009: Summary 22:30: Continuing collimator setup verification -loss patter on 1/3 resonance -asynchronous dump with un-bunched beam -off momentum los studies 01:30: Stable beam collisions at 450 GeV with high bunch intensities:  4 x 2 1010 per beam (plus one probe bunch per beam) problem of 4 bunch filling with ‘abort gap keeper’ solved with new filling scheme: (1) – 1001 - 18821 – 22081 – 27731 Beam1 (1) – 1001 - 13141 – 18791 – 27731 Beam2 06:00: Beam lost due to a trip of the circuit RPMBA.UJ33.RQTL11.L3B2. This caused an emergency beam dump. 07:00: New fill after pre-cycle 11-12-09 Summary of 11.12.2009

11.12.2009: Collimator Setting Beam2 Losses on 1/3 resonance 11-12-09 Summary of 11.12.2009

11.12.2009: Collimator Setting Beam1 Injection losses high intensity: 11-12-09 Summary of 11.12.2009

11.12.2009: Beam Dump Beam2: 4 high intensity bunches plus pilot: 11-12-09 Summary of 11.12.2009

11.12.2009: Asynchronous Beam Dump RF off – de-bunched beams - 4 high intensity bunches plus pilot Beam1: Beam2: 11-12-09 Summary of 11.12.2009

12.12.2009: Stable Beams 11-12-09 Summary of 11.12.2009

12.12.2009: Stable Beams 11-12-09 Summary of 11.12.2009

11.12.2009: Plan for the day -test transverse IP adjustments in all IPs -need one hour for RF adjustments -continue high beam intensity stable beams at 450 GeV until ??? Other tasks on the agenda from the machine point of view: -nQPS quench threshold test with beam (bunch intensity < 2 109) -Ramp test: Orbit correction at end of ramp! MPS and beam dumping system at 1.1 TeV (end of ramp?) Protection devices and collimation system setup at 1.1 TeV Other miscellaneous work: -finish circuit polarity checks -finish kick response measurements -orbit feedback commissioning 11-12-09 Summary of 11.12.2009