Security WG: Report of the Fall 2013 Meeting

Slides:



Advertisements
Similar presentations
1 CCSDS Security Working Group Fall 2008 Meeting October 2008 Berlin Germany.
Advertisements

0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
PS 1 16 June 2006 SEA CESG SUMMARY Rome, Italy, 16 June 2006.
Security WG: Report of the Winter 2007 Meeting Colorado Springs, CO USA January 20, 2007 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > www.DLR.de/rb Slide 1.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Security WG: Report of the Fall 2014 Meeting BSI, London UK 14 November 2014 Howard Weiss NASA/JPL/PARSONS
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Fall 2005 Meeting Atlanta GA September 16, 2004 Howard Weiss NASA/JPL/SPARTA.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
1 CCSDS Security Working Group Fall 2010 Meeting October 2010 British Standards Institute London, UK Howard Weiss NASA/JPL.
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/PARSONS November 2014 BSI, London.
1 CCSDS Threat Document Discussion CCSDS Security Working Group Fall 2004 Meeting CNES, Toulouse FR Howard Weiss NASA/JPL/SPARTA
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Security WG: Report of the Spring 2005 Meeting April 14, 2004 Howard Weiss.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Security WG: Status Briefing Noordwijkerhout, The Netherlands) 31 March 2014 Howard Weiss NASA/JPL/PARSONS
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
1 Information Security Planning Guide CCSDS Security WG Spring 2005 Athens, GR Howard Weiss NASA/JPL/SPARTA April 2005.
Security WG: Report of the Spring 2008 Meeting Marriott Courtyard Crystal City, VA March 14, 2008 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
November SECURITY WORKING GROUP REPORT November 2004.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
1 CCSDS Security Working Group Spring 2014 Meeting 31 March – 1 April 2014 Noordwijkerhout, The Netherlands Howard Weiss NASA/JPL/PARSONS* Identity crisis:
1 Document Status CCSDS Security Working Group March 2008.
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
Security WG: Report of the Fall 2015 Meeting ESA/ESOC, Darmstadt DE 12 November 2015 Howard Weiss NASA/JPL/PARSONS
Security WG: Status Briefing BSI, London UK 10 November 2014 Howard Weiss NASA/JPL/PARSONS
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Security WG: Report of the Spring 2004 Meeting May 13, 2004 Howard Weiss, NASA/JPL/SPARTA.
Security WG: Report of the Spring 2006 Meeting Rome, Italy June 16, 2006 Howard Weiss NASA/JPL/SPARTA
Security WG: Status Briefing Cleveland, Ohio USA 15 October, 2012 Howard Weiss NASA/JPL/SPARTA skype: hsweiss.
Wireless WG Monthly Teleconference
KM SDLS Extended Procedures YB
CCSDS Security Credentials Blue Book
The CCSDS Security WG is chartered to:
Security WG: Status Briefing
Security WG: Report of the Fall 2005 Meeting
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
Network Layer Security Update
[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)
CCSDS Systems Engineering Area: Security Working Group
Security WG: Report of the Spring 2016 Meeting
SPACE INTERNETWORKING SERVICES (SIS) AREA
Space Communication Cross Support Architecture WG
Digital Repository Audit and Certification BOF
Wireless WG Monthly Teleconference
Wireless WG Monthly Teleconference
SLS AREA REPORT November 2004 November 2004.
Delta-DOR WG: Report of the Fall 2010 Meeting
CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code Oct 2002 ******************************************************
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACECRAFT ONBOARD INTERFACES SERVICES
CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572 April 2003.
SPACE LINK AREA MID-TERM REPORT
Presentation transcript:

Security WG: Report of the Fall 2013 Meeting Southwest Research Institute (SwRI) San Antonio, TX 31 October, 2013 Howard Weiss NASA/JPL/PARSONS howard.weiss@parsons.com +1-443-430-8089 skype: hsweiss

Meeting Agenda 28 October 2013 08:30 – 09:30: CCSDS Plenary 09:30 – 12:30: Systems Engineering Area (SEA) Plenary 13:30 – 17:00: Security WG Welcome, introductions, logistics, agenda review Review results of Spring 2013 (Bordeaux) meeting Status of documents, action items Charter review Key Management Blue Book (Fischer/Aguilar-Sanchez) KM for SDLS extended procedures ESA Secure Software Development

Meeting Agenda (cont) 29 October 2013 (08:30 – 17:00) Network Layer Security 1st Draft Review (Weiss) Network layer security over non-IP (Weiss) Testing (Sheehe) Threat book re-write (Black/Weiss/Biggerstaff) Link Layer Security Update (Biggerstaff/Weiss/Aguilar-Sanchez) AERO algorithm (Weiss) Other areas of discussion Proposed new areas of work 30 October 2013 08:30-17:00: Space Data Link Security WG 31 October 2013 08:30-12:30: Space Data Link Security WG 13:30-17:00: SEA Wrap-up Plenary

Attendance Name Organization Email Address Howard Weiss (Chair) NASA/JPL/PARSONS howard.weiss@parsons.com Gordon Black UK Space Agency/CGI gordon.black@cgi.com Daniel Fischer ESA/ESOC daniel.fischer@esa.int Martin Pilgram DLR martin.pilgram@dlr.de Craig Biggerstaff NASA/JSC craig.biggerstaff-1@nasa.gov Ignacio Aguilar-Sanchez ESA/ESTEC ignacio.Aguilar.Sanchez@esa.int Chuck Sheehe NASA/GRC charles.j.sheehe@nasa.gov Dorothea Richter dorothea.richter@dlr.de Julian Airaud CNES julien.airaud@cnes.fr Ed Greenberg (Mon PM) NASA/JPL ed.greenberg@nasa.gov

Executive Summary Attendees from UK Space Agency, ESA/ESTEC, ESA/ESOC, DLR, CNES, NASA/JSC, NASA/GRC, and NASA/JPL. Due to sequestration budget issues NASA Goddard representative was unable to travel. No charter or framework changes were required. Reviewed action items from Bordeaux. Carrying several forward and all others were completed. Reviewed draft of 1st revision of Threat GB. Comments & discussions will be folded into 2nd revision. Reviewed 1st draft of Network Layer Security adaption profile. Section 2 needs to be re-written per comments. NASA/GRC will perform testing and will write the Yellow Book. CNES may also perform testing. Provided an overview of the AERO (Authenticated Encryption with Replay prOtection) algorithm that might be useful in the future. ESA did had no updates regarding Key Management but did discuss their effort in developing policies on secure software development. SDLS: discussed Red-3, extended procedures, and GB.

Summary of Goals and Deliverables KM Blue/Magenta Book for symmetric KM is progressing. Reviewed Threat Green Book revisions. Reviewed network layer security “adaptation” profile draft. Investigate how IPsec could be used over non-IP protocols. NASA/GRC to write Yellow Book and perform testing. CNES may also perform testing. Reviewed AERO algorithm for possible future use. Reviewed SDLS progress in SecWG Discussed ESA secure software standards. Discussed SDLS progress.

SUMMARY TECHNICAL STATUS SEA Area MID-TERM REPORT SUMMARY TECHNICAL STATUS Security WG Goal: Working Status: Active _X_ Idle ____ Summary progress: documents actively being produced: Key Management BB, Threat GB revision, Network Layer BB. All docs green. Progress since last meeting: threat GB 1st rev, network layer security 1st draft. Problems and Issues: Resources – Loss of NASA resources (GSFC) is an issue. status: OK CAUTION PROBLEM Comment: Working Group is advancing and producing good products. Docs OK.

Near-Term Schedule Deliverable Milestone Date Key Management Blue Book Continue drafting next revision 02/14 Network Layer Profile 2nd draft 01/14 Threat Document Revision 2nd revised draft 11/13 Network Layer Yellow Book 1st draft

Near-Term Schedule (cont) Common Criteria Protection Profiles Future TBD Application Layer Security SW Defined Radio Security Physical Layer Security (Channel Coding) Mission Operations document

Open Issues None

Action Items Item Number Action Item: Assigned to: Date Due: SecWG1013:1 Review existing list of Threat GB threats for additions, deletions, expansion, etc. All 12/16/13 SecWG1013:2 Revise Threat GB Howard Weiss 11/15/13 SecWG1013:3 Revise Network Layer Security Adaptation Profile SecWG1013:4 Discuss status of DTN Bundle Security Protocol re-write with Scott Burleigh 11/10/13 SecWG1013:5 Revise Network Layer Security testing configuration. Chuck Sheehe SecWG1013:6 Investigate CNES performing Network Layer Security testing Julien Airaud SecWG1013:7 Write white paper on ideas about network layer security for non_IP environments Ignacio Aguilar-Sanchez & Daniel Fischer 02/20/14

Resource Problems Resources had been adequate to perform the current tasks although personnel have only limited time percentage to apply to CCSDS tasks. Recent loss of NASA personnel will hurt unless they can be restored to attend meetings.

Risk Management Update Must ensure that the current trend of additional resources remains and that resources don’t shrink.

Cross Area WG / BOF Issues Joint meeting with Space Data Link Security WG Continued interaction with DTN and Spacecraft Monitoring & Control although no joint meeting in San Antonio.

Resolutions to be Sent to CESG and Then to CMC None.

New Working Items, New BOFs, etc. None.