WP9 ITS Mechanics and Cooling

Slides:



Advertisements
Similar presentations
WP7 ATLAS ID Barrel End Services T.J.FRASER UCL Aim: Using experience gained from work on the current ATLAS SCT Barrel, attempt an improved design and.
Advertisements

Alice ITS L5,6 Integration 1 End wheels and local services design – services layout on the end wheels: patch panels, routing, cooling and qualification.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
MFT Progress Report Ginés Martínez García for the MFT project ALICE mini-week, Sep 1 st -5 th 2014.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Recent Study Topics Full length model with wafers, hybrids and cable as dead weight.
Training for cAreer deveLopment in high-radiation ENvironment Technologies 1 Work Package 4 New mechanical integration methods November 20 th, 2013 Franck.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
W.O. Miller i T i VG 1 Example Barrel Structures- Disk Primary FEA of Disk Frame Supports FEA of Disk Frame Supports –Structure 2m long with two end plates.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Hybrid Integrated Circuit
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
ALICE ITS Coordination Board 16 July 2013 L. Musa 1.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
WP6 meeting 30/07/2013. Status of flex prototypes production New laser soldering tests Discussion on mass production schedule.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
Pixel Upgrade Phase I CMS Upgrade Week 27. April 2010 R. Horisberger, PSI.
WP6 status report A. Di Mauro (CERN) ITS plenary meeting
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
W.O. Miller i T i VG 1 Two Pixel Configurations Under Study First: A Monolithic Integrated Structure First: A Monolithic Integrated Structure –Axial array.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
PROTOTYPE January, 27 th 2016 Valery AKHNAZAROV Diego ALVAREZ Christophe BAULT Andrea CATINACCIO Daniel DOBOS Heinz PERNEGGER Danilo GIUGNI Eric VIGEOLAS.
Mechanical layout, services and integration R. Santoro On behalf of the ITS upgrade WG4.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
What is Stave Carrier Frame Required to Do?
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
End-cap Mechanics FDR Overview of the Project
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Development of a low material endplate for LP1 and ILD
Local Supports for Inclined Layout: CERN Update
Micro Vertex Detector of PANDA Strip Detector
Mechanics: (Tim).
Antti Onnela CERN – EP – Detector Technologies group
Upgrade of the ALICE ITS
LHCC Upgrade Session, 12 March 2013
Services Layout – Update
WG4 – Progress report R. Santoro and A. Tauro.
Silvan Steuli Roland Horisberger Stefan König CMS Upgrade Workshop
as a prototype for Super c-tau factory
Presentation transcript:

WP9 ITS Mechanics and Cooling 12 March 2014 Corrado Gargiulo

ITS objectives for 2014 – WP9 Finalization of IB and OB layout IB QM design: Space Frame +Cold Plate, End-Wheel, Cylindrical Structural Shell IB BARREL QM production based on “pad chips” OB QM design: Space Frame, Cold Plate OB STAVE QM production based on “pad chips” … EM Engineering Module, Qualification Module (final quality)

ITS objectives for 2014 – WP9 Finalization of IB and OB layout IB QM design: Space Frame +Cold Plate, End-Wheel, Cylindrical Structural Shell IB BARREL QM production based on “pad chips” OB QM design: Space Frame, Cold Plate OB STAVE QM production based on “pad chips” …

Finalization of IB and OB layout (TDR, endorsed) BP outer radius 19 Layer 0 mean radius 23.38 Layer 0 inner boundary >21.8 Middle Layer radius TDR6 / TDR7 Stave width 15+1 (FPC) Stave length (cold plate) IL 320 (4th IB layer) IL 290=9.6+270.8+9.6 ML 870= 14.85+840.3+14.85 1066 OL 1502=15.7+1470.6+15.7 Detectors boundary radius@ >21.8mm

Beam Pipe NEW DESIGN 19mm OR Submitted to LEB commitee for approval

ITS VS BP Gap >2.8 mm 19.0 No change in the ITS layers radius (TDR)

ITS Outer Barrel Baseline TDR 6 TDR 7 Simulation results by the end of March

ITS objectives for 2014 – WP9 Finalization of IB and OB layout IB QM design: Space Frame +Cold Plate, End-Wheel, Cylindrical Structural Shell IB BARREL QM production based on “pad chips” OB QM design: Space Frame, Cold Plate OB STAVE QM production based on “pad chips” …

Inner Barrel Polyimide tubes ID 1.024mm; wall thickness 25 micron Flex Printed Circuit 9 PIXEL Chip Cold Plate Spaceframe Inner layer stave 300mm length, 1.6 gram weight Polyimide tubes ID 1.024mm; wall thickness 25 micron

PRODUCTION QM (FINAL QUALITY) IB Carbon spaceframe IB status DEVELOPMENT TEST on EM (Engineering Module) sag Thermal test OK Thermoelastic test on going Stiffness test sag <10 µm Vibrational test >100Hz Dimensional next 167 Hz next PRODUCTION QM (FINAL QUALITY) Production of new spaceframe with high dimensional accuracy new moulds under production Production of full barrel (48 staves)

EM IB Carbon spaceframe on going M60J Alternative option under investigation to further improve stiffness and thermo-elastic stability Change of Carbon fleece with K13D2U (same weight) 45µm 20µ Carbon paper 30µ (30µ) 70µ K13D2U 45µm 45µm 20µ 11

QM IB Connectors status next DESIGN PRODUCTION provide staves position accuracy status DESIGN 3D, 2D production drawings OK… …need validation fro WP6, needs additional considerations on survey strategy next PRODUCTION 100 CONNECTORS Design and Production of assembly jig, to glue the connector to the spaceframe Deisgn modified respect to TDR to increase accuracy

QM IB production Spaceframe+Coldpalte n.48 2014 JULY Tentative schedule

QM IB End-Wheels status next DESIGN DESIGN 3d, OK… …need further consideration on cable and piping routing next DESIGN Design and Production of molds for layer assembly

QM IB End-Wheels From Antonello & Antoine

QM IB CYlindrical Support Structure status DESIGN 3d, OK… …needs further consideration on survey targets locations and interface with Service Barrel next DESIGN Design and Production of molds

QM IB production End-Wheels and CYSS 2014 SEPTEMBER

Production site Bldg 167 new … ongoing CERN GS HSE Material Hazard Fire extinguisher CERN electrical inspection Ventillation system installation 90m2 clean environment, 18-23°C, 50% humidity

Evgeny &Viktor Samuel Yannick Almost there!

ITS objectives for 2014 – WP9 Finalization of IB and OB layout IB QM design: Space Frame +Cold Plate, End-Wheel, Cylindrical Structural Shell IB BARREL QM production based on “pad chips” OB QM design: Space Frame, Cold Plate OB STAVE QM production based on “pad chips” …

Outer Barrel

PRODUCTION QM (FINAL QUALITY) Outer Barrel stave status DEVELOPMENT TEST On spaceframe (Carbon fiber K13 D2U) Bending test &FEA sag ≈95µm Vibrational test 1st freq=51Hz; dynamic response ongoing On coldpalte Thermoelastic test αexp ~ 12 x 10-6 K-1 Thermal (150 and 300 mW/cm2), hydraulic test Ok Thermal test on full length coldplate next next PRODUCTION QM (FINAL QUALITY) Production of 1 SPACEFRAME+ 2COLDPLATES Production of EMs

EM OB Carbon spaceframe on going Improve stave stiffness Full k13 spaceframe has shown to be too brittle N.2 Produced and tested, spaceframe M55j baseline N.2 Produced and tested, spaceframe M55j with additional layer N.2 Produced and tested, spaceframe M55j with two layers K13D2U(embedded) 3 point bending test results Confirmed previous test Lumped mass (test) Distributed mass (derived from test)

EM OB Coldplate on going Production of 1 cold plate 1,5m/ID=2mm/option-a Production of 1 cold plate 1,5m/ID=2mm/option-b Production of 1 cold plate 300mm for thermal test for both option a and b on going Mould modified (for ID 2mm), Grenoble New 2mm ID pipes arrived K13 from Berkley arrived Option a) Baseline Option b) Alternative option under investigation to further improve stiffness and thermo-elastic stability 24 20µ 90µ 30µ 45µm 70/45µm ID=2.67mm, wt=0.065mm ID=2.00mm; wt=0.032mm

x x x QM OB Spaceframe CONNECTOR new design Spaceframe New design Removed spring connection between stave and end-wheels x TDR baseline Spring Spring x x Ruby sphere Reference Plane on the End-Wheels

QM OB Spaceframe CONNECTOR revised design status EM 3D, 2D production drawings OK… … need to be validated by WP7,8 and by test next PRODUCTION 20 CONNECTORS Design and Production of assembly jig needed to glue the connector to the spaceframe

QM OB Cold Plate CONNECTOR status DESIGN 3d, 2D production drawings OK… …needs validation by WP7,8 next PRODUCTION 20 CONNECTORS Design and Production of assembly jig, to glue the connector to the spaceframe

EM OB End-Wheels status next DESIGN DESIGN EM 3d model proposal EM 3D design

EM OB End-Wheels Definition of cooling modularity and cooling scheme Definition of electrical and hydraulic connection layout DC-DC converter mechanics and cooling 300mm 300mm 300mm P. Kuijer 2014-3-11 300mm DC-DC 150mm EW

ALI-UPGRADE 3D CAD MODEL overall 3D CAD MODEL available on CERN ITS UPGRADE CAD REPOSITORY R1_20140311

Next EM Inner stave & Outer stave -optimize carbon plies lay-up QM Inner stave & QM Outer stave -freeze connector design and start production -develop jigs for connector to spaceframe gluing