A. Mikhailichenko, D. Rubin

Slides:



Advertisements
Similar presentations
Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
( 1 ) PROCEDURE FOR FLAT HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Rosier Ph. – IPNO – Detector Dpt. – 27/05/2011APRIME HPS collaboration meeting 1/24 1- Vacuum chamber proposal 1.1- Stainless steel chamber design and.
…………..Continued Recap Machine tool Lathe machine Basic components
Realistic Model of the Solenoid Magnetic Field Paul S Miyagawa, Steve Snow University of Manchester Objectives Closed-loop model Field calculation corrections.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
PMT Survey Summary Enrique Calvo Alamillo Chooz 10 February 2010.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
TIB-TID insertion test into the CMS Tracker cylinder ________________________________________________________ Tracker week july 04
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
DIMENSIONING Sizing of drawings in Drafting has standards and guidelines.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
The HCAL barrel absorber structure
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Comments on the CLEO-III drift chamber support Dan Peterson, Cornell CLEO-III took data at CESR from ~1998 to ~2008 and evolved from CLEO-I.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Pure Tungsten HCal: ‘staircase’ design Structural analyses and possible optimizations.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Shroff S.R. Rotary Institute Of Chemical Technology
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
A First Pass at Modeling Horn 3 L. Bartoszek Bartoszek Engineering 12/10/04.
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
"Drawer Mechanics - MiniDrawer"
Update on Pavia MM mechanical prototype
NA62 LAV Anti1 REMOVAL & TESTS
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Development of a low material endplate for LP1 and ILD
General remarks about the HESR and PANDA vacuum system
Integration issues at IHEP
Requirements of the support mechanics
First of all we will remind some numbers:
Test box for ProtoDUNE SP – Integration Test
MECHANICAL ENGINEERING
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
University of Wisconsin-Madison
Overview of mechanical design & construction
Comments on TRD rail system
LATHE MACHINE A lathe is a machine tool which operates on the principle of a rotating work piece and a fixed cutting tool. Lathe machine is also known.
Alignment of Main Linac Cryomodule (MLC)
Required tools for installation of a V-1020C speaker with V-9914 bridge.
Single Detector Design
Proposal for quadrupole families
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

A. Mikhailichenko, D. Rubin VACUUM CHAMBER IN A KICKER Telephone meeting September 16 2014

In a Vacuum Chamber meeting on August 19 2014 we introduced the concept of rail design in a kicker region New rail E-821 rail in a ring (except the kicker region) Al Al Macor Vac chamber wall Aluminum part made with longitudinal interruptions

Procedure: 1) Drill holes through 2) Make threads 3) Close with short threaded cork 4) Weld cork outside 5) Shave outer surface

Critical dimensions are the radiuses of rails As the rails have a curvature with definite radius, the chamber itself should be aligned properly

Isometric view of rails and HV plates in a chamber

Just rails… Macor posts Macor wheels over posts

The concept was tested at kicker model Macor posts screwed into the wall

E-821 rails in a region of the kicker plates Cage attached to the chamber by screws Vertical fixators

Important to have an access from one side Principle of operation of vertical fixators is very simple: Important to have an access from one side

We considered a cage concept of installation of rails and HV plates also Thin wall cylindrical posts Vertical fixators Radial fixators

Two concepts in comparison Pretty flexible base Semi-transparent vacuum chamber is shifted down for better visibility

Sagitta appearance as a result of chamber shrinkage One comment… Sagitta appearance as a result of chamber shrinkage ℎ≅𝐿 ∆𝐿 2𝐿 ΔL= L-L' Shape after temperature changed (cooled) Original shape (flat) For Al α=22e-6oC, L=200mm, ΔT=10o h≈2mm For a 1oC the change is h≈0.6 mm Base plate of cage

In some sense the chamber itself serves as a cage in our concept. CONCLUSIONS Two concepts considered. • Cage system demonstrates difficulties in keeping vertical positioning at all length of the rails, as it fixes the cage position in few points only • No direct connection of inner rails location and outer surfaces of the chamber in a cage attachment • Temperature dependence is more pronounced for the cage system • More details required for the cage system • Time consuming procedure of cage alignment In some sense the chamber itself serves as a cage in our concept. Further remarks are welcomed…

Backup slides