NERC Reliability Standard EOP 001

Slides:



Advertisements
Similar presentations
Standards Review Subcommittee Update October 22, 2013.
Advertisements

Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
Notice of Proposed Rulemaking on Standards WECC Board of Directors Meeting December 7-8, 2006.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Western Electricity Coordinating Council Status of NERC Standards Activity WECC PCC Meeting March 6-7, 2008.
North American Electric Reliability Council 1 Coordinate Operations Standard Jason Shaver Standard Drafting Team Chair September 29, 2005.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
State of Standards and Standards in Development Sean Cavote, Manager of Standards Development WECC Operating Committee Meeting March 26, 2015.
VAR Outreach Presentation FRCC October 30, RELIABILITY | ACCOUNTABILITY2 NERC Antitrust Guidelines  It is NERC’s policy and practice to obey the.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification [LOCATION] – [DATES OF ON-SITE VISIT] [Presenter Name,
Standards Development: Update to IMO Regulatory Standing Committee May 14, 2003.
NERC Functional Model AND HOW IT RELATES TO THE ERCOT REGION
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Reliability Standards Update
June 6, 2007 TAC Meeting NERC Registration Issues Andrew Gallo, Assistant General Counsel, Litigation and Business Operations ERCOT Legal Dept.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Alberta Reliability Standards Stakeholder Information Session Jason Murray, Director Operational Effectiveness October 11, 2011.
1 Texas Regional Entity Report December Performance Highlights ERCOT’s Control Performance Standard (NERC CPS1) score for October – Initial.
Texas Regional Entity Compliance Report TAC July 9, 2009.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Business Practices Subcommittee Update May 4, 2010.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
Standards Review Subcommittee Update August 17, 2010.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Distributed Generation Registration June 30, 2008.
Electric Reliability Organization and Issues in Texas Technical Advisory Committee January 4, 2006 Jess Totten Director, Electric Industry Oversight Division.
Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
1 Power System Restoration. 2 Not Active 3 4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007.
Standards Update Merrill Brimhall Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
NSRS Update Recent NERC Standards Activities RSC – June 2013 Presented by: Lisa Martin, NSRS Chair.
Business Practices Subcommittee Update October 27, 2009.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Standards Review Subcommittee Update August 19, 2014 Co-Chairs Rebecca Berdahl, BPA Marie Knox, MISO.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Standards Review Subcommittee Update August 18, 2015 Chair Rebecca Berdahl, BPA.
ERCOT SYSTEM PLANNING Dynamic Model Data Management.
WECC – NERC Standards Update
Kenneth Silver Los Angeles Department of Water & Power
MOPC Meeting Oct , 2016 Little Rock, AR
PLWG Review 6.9 and the Interconnection process
Phase Angle Limitations
Standards Subject to Future Enforcement 2017
Updated ERO Enterprise Guide for Internal Controls
NPRRs NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report. This Nodal Protocol Revision Request (NPRR) proposes the discontinuation.
WECC Regional Standards Update
Path Operator Implementation Task Force
ERCOT Technical Advisory Committee June 2, 2005
Merrill Brimhall – Engineer, Staff
MIC Committee Discussion
Mandatory Reliability Standards
Coordinate Operations Standard
Standards Review Subcommittee Update
Steve Rueckert – Director of Standards
WECC – NERC Standards Update
MIC Committee Discussion
Standards Review Subcommittee Update
Standards Review Subcommittee Update
Standards Review Subcommittee Update
Presentation transcript:

NERC Reliability Standard EOP 001 RE: Interpretation of “Adjacent” Has the potential to have major impact on compliance efforts with many other NERC Reliability Standards

There is a Proposed Interpretation of NERC Reliability Standard EOP-001 that is open for pre-ballot comment. http://www.nerc.com/filez/standards/EOP-001-0_Interpretation_RECM.html This was requested by Regional Entity Compliance Managers 4 Questions were posed for Interpretation: The ERCOT region should be concerned about the interpretation of Question 2. 2. What was intended by using the adjective “adjacent” in Requirement 1? Does “adjacent Balancing Authorities” mean “All” or something else? Is there qualifying criteria to determine if a very small adjacent Balancing Authority area has enough capacity to offer emergency assistance?

Original Interpretation said adjacent meant interconnected by AC ties Revised Interpretation removed the limitation to AC ties and refers to the NERC Glossary of Terms definition of Adjacent Balancing Authority, which does not differentiate between AC ties and DC ties The Interpretation no longer addresses Interconnections which are interconnected ONLY by DC ties

WHY IS THIS A CONCERN? The words “adjacent” and “neighboring” are used frequently (about 50 times at our count) in NERC Reliability Standards to require the establishment of relationships or actions between registered functional entities. The context typically is that the adjacent or neighboring entities will impact one another on a synchronous basis (i.e., changes on one system will influence the other system because they are synchronously connected). DC Ties between Interconnections do not meet that context – because flows across DC ties remain at their scheduled values and do not impact the “other side” of the ties.

ERCOT ISO recommends that ERCOT Market Participants enter the Ballot Body and submit comments on this proposed interpretation. Recommend each organization comment that the interpretation should clarify that “adjacent” and “neighboring” means – Applies to registered functional entities with AC ties or DC ties within an Interconnection, and does not apply to DC ties between Interconnections

Without a return to the initial wording: There are many standard requirements which ERCOT ISO believes would be unnecessary and burdensome for ERCOT, because we have no “adjacent” or “neighboring” functional entities which influence our system or which our system impacts. The interpretation of those standard requirements would cause development of numerous agreements between ERCOT and other functional entities outside the ERCOT Interconnection – with no impact to reliability. Irrelevant actions such as weekly conference calls, notifications, sharing and monitoring of limits and methodologies would be required to be compliant.

Cross Reference of Standards with “adjacent” or “neighboring” Requirements BAL-005-0b R9, R12, R14 BAL-006-1 R2, R3, R4, R4.1, R4.3, R5 EOP-001-0 R1, R4.3 EOP-005-1 R11.5.3 EOP-006-1 R5 FAC-010-1 R4.1 FAC-011-1 R2.1 FAC-012-1 FAC-014-1 R5.3, R5.4 INT-006-2 R1.1.3 IRO-001-1 R7 IRO-002-1 R2 IRO-003-2 R1 IRO-004-1 IRO-005-1 R16 IRO-015-1 MOD 001 R1.7 MOD 004 MOD 028 R2.2, R3, R4.3, R6.1 MOD 030 R2.1.2, R3.5, R4, R5.2, R6, R6.2, R6.4, R6.6, R7.2, R7.2, R7.6 TOP-001-1 R7.3 Neighboring Standard Requirements EOP-001-0 R6 EOP-002-2 R3 EOP-005-1 R4 EOP-006-1 IRO-002-1 IRO-005-1 R4, R10 MOD 001 R1.7 PER-004-1 PRC-001-1 R3.2 PRC 002 R3.1.1 TOP-001-1 R7 TOP-002-2 R4, R11, R12, R18 TOP-008-1 VAR-001-1 R1

Questions ? ?