Cryo PLC issues [May 2011]: CASES

Slides:



Advertisements
Similar presentations
Discussion on TE/CRG equipment at H4IRRAD Marco Pezzetti (A. Tovar – B. Ivens / Support CE for cryo LHC) & TE-CRG-OA – TE-CRG-CI 1TECRGCE M.PEZZETTI.
Advertisements

Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
CS 542: Topics in Distributed Systems Diganta Goswami.
Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
LSC - 28 February M. Pezzetti – Cryogenics 1 28 February 2014 M. Pezzetti EDMS Id: v.1.
Chapter 4: Inception is Not the Requirements Phase
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
MSF Testing Introduction Functional Testing Performance Testing.
1 Product Reliability Chris Nabavi BSc SMIEEE © 2006 PCE Systems Ltd.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Problem Solving and Diagnostic Skills Software Maintenance.
TESTING STRATEGY Requires a focus because there are many possible test areas and different types of testing available for each one of those areas. Because.
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 7 Quality and Innovation in Product and Process Design.
PLC Setup. Lab Setup Power Supply SLC 5/03 CPU DC input card Relay output card Our lab setup consists of 8 stations each having an IBM-PC compatible computer,
Fault Tolerance via the State Machine Replication Approach Favian Contreras.
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
Additional Lift to Access ECA5 Etienne Carlier, Jean-Louis Grenard, Damien Lafarge SPS Dump Upgrade Meeting 09/07/2015.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Simulation results for powering serial connected magnets Daniel Siemaszko, Serge Pittet OUTLINE : Serial configuration of full rated converters.
Network design Topic 6 Testing and documentation.
O PERATING S YSTEM. What is an Operating System? An operating system is an event driven program which acts as an interface between a user of a computer,
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
TS workshop 2004U. Epting, M.C. Morodo Testa - TS department1 Improving Industrial Process Control Systems Security Uwe Epting (TS/CSE) Maria Carmen Morodo.
LHC Cryogenics Schneider PLCs: Radiation tests at H4IRRAD Mitigation measures M. Calviani, M. Brugger, G. Spiezia (EN/STI) E. Blanco, J.M. Beckers, D.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Data Transmission and Networks Transmission error checking & correcting.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
CN1260 Client Operating System Kemtis Kunanuraksapong MSIS with Distinction MCT, MCITP, MCTS, MCDST, MCP, A+
Wiener crates; An installation and power supply analysis. Magnus Bjork Be/Co/Fe
How to Fix the Blue Screen of Death on Windows
News and Introduction from CERN June 15th, 2005
Status & Plans for WA105 Control System
Situation of the Static Var Compensators at CERN.
Lecture 1: Operating System Services
Data quality, or how to keep afloat in the growing data flood
CMS November Upgrade Week
LV Safe Powering from UPS to Clients
LCLS-II Cryoplant Controls Readiness to Procure
Renovation of the 45-year old PS magnets
Run Standard Diagnostic Tests
X X X QURA PLC X RM01_R X RM01_L Long-Term?: QURC(A,B) QUI (-1)
C VCE
GUAPI working group meeting June 26th 2013
Maintaining Data Integrity in Programmable Logic in Atmospheric Environments through Error Detection Joel Seely Technical Marketing Manager Military &
Close your computer first by clicking on the “Start” button and then press “Close” Wait 30 minutes Now, turn your computer back on and try connecting again.
Effective Solution To Fix iTunes Error 4013 Reboot the iPhone Check for possible faulty cables as well as ports Check for your proper Wi-Fi Network connectivity.
Premium Success Story Métro de Lyon - France
Collimator Control (SEUs & R2E Outlook)
Preliminary Analysis and foreseen actions EN-ICE&EN-STI
Magnet PS Controls Hardware Status
Chapter 23 – Project planning
Finally.... We had to wait a long time.... We had many problems....
RADIATION induced failures in LHC 28th June 2011
Why Threads Are A Bad Idea (for most purposes)
PSS0 Design & Concept of Operations
Status Vacuum Control-Command for AdV
Why Threads Are A Bad Idea (for most purposes)
Why Threads Are A Bad Idea (for most purposes)
Commissioning the European XFEL cryogenic system and best practice
P8 cryogenic PLC problems on
Presentation transcript:

Cryo PLC issues [May 2011]: CASES (1) [11/5/2011] Crash PLC QUI P4 (Occurred during the Last Tech. Stop) Known problem using UNITY in the terminal server: Two developers worked concurrently with the development tool. (2) [13/5/2011] Crash QSCB P8 PLC was just rebooted and no replaced. (Agreed with the cryo operation) Dump sent to Schneider. After their analysis it seems that an electronic component called RAM Tag provoked a bad usage of the Cache memory which got corrupted. (3) [25/5/2011] Crash QURCB P8 (US85) Possible SEU already under study! (happened before: [19/04/2011]) PLC replaced again. Dump in Schneider hands to perform the analysis. (4) [25/5/2011] Crash QSCB P8 PLC replaced and dump sent to Schneider Confirmation of the previous mentioned problem with the component RAM Tag

Cryo PLC issues [May 2011]: SUMMARY Human mistake Bad procedure applied during a TS (short time and many actions) Reinforced procedural mechanisms Abandon of the Windows Terminal Servers solution SEU Already two occurrences for the same location but different PLCs (within one month) A possible third case in 10/2010: QURA located also in the US85. Mitigation plan needed! Schneider PLC Crash Confirmation of a bad component (same PLC: occurred twice) Within MTBF of the Cryo control system (~ 1 failure per year for 65 PLCs) Waiting Schneider full analysis for a adequate action(e.g.: bad series or just one-time event)

Cryo PLC issues [May 2011]: SEU Moving equipments to a safer place: UL84 (already foreseen in Ph3 works) Phase 1,2: UX85 to the UL84 (done) Phase 3: US85 to the UL84 (2011/2012) Intermediate solution: moving only the PLC CPU. Technical feasibility already studied and approved. Scheduled for the next Technical Stop if the needed equipment reaches CERN on time (already ordered but delivery may take up to 6 weeks) After relocation UL84 Relocation Racks CB 2011/2012 Rack avec Espace dispo Pour CPU QURCB

Cryo PLC issues [May 2011]: PLC Crash Possible scenarios No action: MTBF accepted as normal behavior (not an improvement !) Schneider identifies again a series of PLCs where the faulty component is potentially a problem: A second campaign of PLC replacement could take place. Reengineering of the solution: Redundancy solution (certainly increases the availability!) An hypothetical redundant solution: (~ 65 PLCs) CPU family change (Premium to Quantum) Cabling: replace Premium I/O cards by a decentralized Profibus stations Porting logic code to the new platform (expected light changes in the current code) I/O mapping reconfiguration Cost: First estimation of about 1.5 MCHF on material and 2MY for the cabling and control code activities Other study includes migration to other platform but the cost may have to be taken into account because the needed migration of more than 17.000 A4 graphical code (large regression risk!)