CMS muon detectors and muon system performance

Slides:



Advertisements
Similar presentations
TIME 2005: TPC for the ILC 6 th Oct 2005 Matthias Enno Janssen, DESY 1 A Time Projection Chamber for the International Linear Collider R&D Studies Matthias.
Advertisements

Review of the CMS muon detector system muon detector system  Physics goals  Muon system layout  Barrel Drift Tubes Chambers (DT)  Endcap Cathode Strip.
The CMS Detector Paoti Chang National Taiwan University
Guoming CHEN The Capability of CMS Detector Chen Guoming IHEP, CAS , Beijing.
E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.

1 VCI, Werner Riegler RPCs and Wire Chambers for the LHCb Muon System  Overview  Principles  Performance Comparison: Timing, Efficiency,
The ATLAS B physics trigger
IJAZ AHMEDNational Centre for Physics1. IJAZ AHMEDNational Centre for Physics2 OUTLINES oLHC parametres oRPCs oOverview of muon trigger system oIdea of.
ATLAS RPC: Cosmic Ray Teststand at INFN Lecce G. Chiodini, M. Bianco, E. Brambilla, G. Cataldi, R. Coluccia, P. Creti, G. Fiore, R. Gerardi, E. Gorini,
The CMS Muon Detector Thomas Hebbeker Aachen July 2001 Searching for New Physics with High Energy Muons.
LHeC : Muon Systems L. Pontecorvo.
The digitization procedure occurs separately for each Muon technology, MDT, CSC, RPC and TGC. Here the main steps of each MuonHits to Muon Digits conversion.
Study of the Optimum Momentum Resolution of CMS Experiment Presented by: Timothy McDonald Faculty Mentor: Darin Acosta.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
Experiences with RPC Detectors in Iran and their Potential Applications Tarbiat Modares University Ahmad Moshaii A. Moshaii, IPM international school and.
Muon System and Physics Performance Ludovico Pontecorvo CERN-INFN.
The CMS Muon System I. Bloch (Talk prepared by J. Gilmore) CMS101 – June 2008.
PERFORMANCE OF THE MACRO LIMITED STREAMER TUBES IN DRIFT MODE FOR MEASUREMENTS OF MUON ENERGY - Use of the MACRO limited streamer tubes in drift mode -Use.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
C. K. MackayEPS 2003 Electroweak Physics and the Top Quark Mass at the LHC Kate Mackay University of Bristol On behalf of the Atlas & CMS Collaborations.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
Muon-raying the ATLAS Detector
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
RPCs in CMS Supreet Pal Singh India-CMS Meeting, July 20-21, 2007
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
M. Bianco On behalf of the ATLAS Collaboration
Luca Spogli Università Roma Tre & INFN Roma Tre
A. Meneguzzo Padova University & INFN Validation and Performance of the CMS Barrel Muon Drift Chambers with Cosmic Rays A. Meneguzzo Padova University.
Summer Student Session, 11/08/2015 Sofia Ferreira Teixeira Summer Student at ATLAS-PH-ADE-MU COMSOL simulation of the Micromegas Detector.
Tests of RPCs (Resistive Plate Chambers) for the ARGO experiment at YBJ G. Aielli¹, P.Camarri¹, R. Cardarelli¹, M. Civardi², L. Di Stante¹, B. Liberti¹,
Precision Drift Chambers for the ATLAS Muon Spectrometer
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
TeV muons: from data handling to new physics phenomena Vladimir Palichik JINR, Dubna NEC’2009 Varna, September 07-14, 2009.
TeV Muon Reconstruction Vladimir Palichik JINR, Dubna NEC’2007 Varna, September 10-17, 2007.
CMS Cathode Strip Chambers Performance with LHC Data Vladimir Palichik JINR, Dubna NEC’2013 Varna, September 10,
Muon Detectors at LHC Exp. Chunhua Jiang IHEP Beijing Aug.25,
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
Trigger & Tracking detector for CMS
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
Design and performance of the ALICE Muon Spectrometer
Results with the RPC system of OPERA and perspectives
(University of Sofia “St. Kliment Ohridski”)
Status of BESIII and upgrade of BESIII
S.Movchan Straw prototype beam test into the NA48 infrastructure
Production ad Quality control of RPCs for the CMS muon barrel system
Sensitivity of Hybrid Resistive Plate Chambers to Low-Energy Neutrons
ATLAS-MUON Trigger hardware developments
University of Wisconsin
Validation and Performance
PHENIX RPC R&D EFFORT Beau Meredith
The Compact Muon Solenoid Detector
Multigap Resistive Plate Chambers for EAS study in the EEE Project
ATLAS Muon Spectrometer and
RPC and LST at High Luminosity
Performance of a Multigap RPC prototype for the LHCb Muon System
Muon Detector Jiawen ZHANG 16 September 2002.
Project Presentations August 5th, 2004
Niels Tuning (Outer Tracker Group LHCb)
Pre-installation Tests of the LHCb Muon Chambers
11th Pisa meeting on advanced detectors
Resistive Plate Chambers performance with Cosmic Rays
The CMS muon system performance
Cluster Counting Drift Chamber as high precision tracker for ILC experiments G.F. Tassielli(1,2) (1) Dipartimento di Fisica dell’Universita’ del Salento,
Presentation transcript:

CMS muon detectors and muon system performance Physics goals Muon system layout Barrel Drift Tubes Chambers (DT) Endcap Cathode Strip Chambers (CSC) Resistive Plate Chambers (RPC) Muon system performance Ezio Torassa – Sez. INFN di Padova LHC days in SPLIT – SPLIT (Croatia) – October 4-7 th 2000 E. Torassa

Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000 Physics goals The 4 lepton channel is crucial for the discovery of the SM Higgs boson Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000 Physics goals H g Z Z(*) g 4 m SM Higgs (mass resol. ~ 1 GeV) h, H, A g m+ m- SUSY Higgs q , g g multi-lepton + multi-jet + Etmiss Superpartners (muon recognition in multi-jet environment) Z’ g m+ m- New Gauge Bosons (Pt m measur. and sign determ. Above 1TeV) etc … ~ ~ Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000 Muon system layout E. Torassa Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000 Muon system layout Barrel (h<1.3) DT - RPC particle rates < 10 Hz/cm2 low B field < 0.8 T Endcap ( 0.9<h<2.4) CSC - RPC particle rates 10-100 Hz/cm2 high B field up to 3 T Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000 Muon system layout DT goals Measure f and z points along muons track segements in the barrel region to: identify muons and measure charge and momentum identify the bunch crossing associated to every muon track CSC goals Like DT but in endcap regions RPC goals Measure f points along muons track segements in the barrel and endcap regions to: identify muons and assign a bunch crossing to the tracks estimate their pt Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Barrel Drift Tubes Chambers 172200 Anode ch. Superlayer Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Barrel Drift Tubes Chambers Cell designed to have electric field as uniform as possible ò Drift velocity mm/ns Gas mixture Ar/CO2 ( 85/15 % ) Vc / Vs / Vw = -1.2/+1.8/+3.6 (kV) ò E = 1 - 2 kV/cm Electric field kV/cm Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Barrel Drift Tubes Chambers DT performance Results from July 1999 CERN-H2 test beam The prototype is a narrow MB2 type superlayer with the final cell design Single cell s ~ 170 mm Single cell efficiency ~ 99.8 % Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Barrel Drift Tubes Chambers DT performance in magnetic field Bz Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Barrel Drift Tubes Chambers DT trigger BTI front-end device TRACO device Bunch and Track Identifiers: Synchronous device with 80 MHz FIFO unit, it stores times with 12.5 ns resolution Track Correlator TMEAN = T MAX is independent to the angle and the position of tracks Output: x, y, TRGLEVEL Output: X, Y, CORR/TRGLEVEL The clock count identify the bunch crossing Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Endcap Cathode Strip Chambers 4 disks 2-3 rings (3 for ME1) ~ 2.5 million wires 210816 Anode ch. 273024 Cathode ch. (*)(ME4 staged) Chamber Trapezoidal shape covers 10o or 20o sectors Each Chamber has 6 gas gap planes Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Endcap Cathode Strip Chambers CSC gas gap plane is a multiwire proportional chamber H.V. wires 3.6 kV (Qcath. ~ 110 fC, Qanode ~ 140 fC) 3.2 mm 9.5 mm Wires measure r-coordinate Wires spaced by 3.2 mm ganged in groups of 5-16 Wires group width 16-51 mm (digital readout) Strips run radially to measure f coordinate 3 - 16 mm Strips width 3-16 mm (analog readout) Gas mixture Ar/CO2/CF4 ( 40/50/10 % ) Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Endcap Cathode Strip Chambers CSC performance Strips Single layer efficiency ~ 100 % Single layer resolution ~ 50 mm Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Endcap Cathode Strip Chambers CSC performance in magnetic field Br < 1 T |f| < 6o s < 150 mm s ~ 60 mm Bz < 3 T Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Endcap Cathode Strip Chambers CSC trigger Comparator device Cathode Local Charged Track Processor thresh Latch Latch Position Angle Bunch crossing ident. ò 4 comparators localize hits to within a half-strip Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Resistive Plate Chambers RPC MB RPC ME 360 Stations 252 Stations (6 shells , 12 sectors) (4 disks , 1 or 3 rings) 80640 strips 92162 strips FEB ME2 Strip orientation MB2 MB1, MB3, MB4 Strip orientation 30o AL bars Each station has 2-3 double-gap modules Chamber Trapezoidal shape covers 10o or 30o sectors RPC ME2 station has 6 double-gap modules Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Resistive Plate Chambers RPC double gap module Avalanche created inside the gap, charge induced on strips Electrode resistivity ò Rate capability ò Gap width Time performance Avalanche operation mode (higher rates w.r.t. streamer mode) Operating H.V. 8.5 - 9.0 kV Gap width 2 mm Bakelite bulk resistivity 1-2 1010 W cm Bakelite thickness 2 mm strip width ~ 35 mm Gas 95% C2H2F4 , 5% i-C4 H10 Double gap improves efficiency and time resolution Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Resistive Plate Chambers RPC performance Trigger efficiency Trigger efficiency s < 3 ns Efficiency ~ 100 % RPC time resolution (ns) RPC efficiency Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Resistive Plate Chambers RPC trigger Pattern comparator trigger device Because of energy loss fluctuations and multiple scattering there are many possible patterns in RPC chambers for similar muons The PACT electronic performs two functions: requires time coincidence in 3 or 4 stations compares hits to predefined patterns for muons of various momentum (obtained from simulation) Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Muon system performance Muon Identification Precision dpt/pt for pt<100 GeV Charge assignment correct to 99% confidence Unambiguous bunch crossing identification Requirements Muon system with inner tracker dpt/pt ~ 1 % Muon system with vertex constraint dpt/pt ~ 10 % Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Muon system performance Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Muon system performance Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000 Conclusions Madrid MB2: glue on top of 1st layer of I-bemas Legnaro table for MB3 q SL FNAL CSC wire winding station FNAL CSC assembling station Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000

Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000 Conclusions CMS muon system is designed to achieve the LHC physics goals Required performances were obtained with tests of detector prototypes Mass production of chambers has begun Ezio Torassa - LHC days in SPLIT - October 4-7 th 2000