Allocation of Capacity in Portugal Under the New Regulation 24th IG meeting S-GRI, Madrid September 23, 2013.
Advertisements

Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
15 th September 2013 Enagás and TIGF Information to NRAs.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
Enagás, REnagás, REN and TIGF EN and TIGF IT implementation plans and agreements with PRISMA 25 th IG meeting 13 th December 2013.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
PILOT PROJECT ON CAM 17 th SG meeting Madrid 27 th September 2012.
1 13 th December 2013 Teleconference 25 th IG Meeting South Gas Regional Initiative.
32 nd IG meeting 15 th July 2015 Enagás, GRTgaz, REN and TIGF.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
29th November 2016 Teleconference
20th SG Meeting South Gas Regional Initiative
Congestion Management
GRI North-West Meeting
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
21st IG Meeting South Gas Regional Initiative
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
25th IG meeting 13th December 2013
New transparency guidelines
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
13th December 2013 Teleconference
Enagás, GRTgaz, Reganosa, REN and TIGF
19th June videoconference
4th October 2016 Teleconference
35th IG meeting 16th February 2016
Allocation of Capacity in Portugal Under the New Regulation
CMP Transparency Requirements
18th July 2016 Teleconference
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
GRI North-West Meeting
Allocation of Capacity in Portugal Under the New Regulation
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
26th February 2015 Teleconference
41st IG meeting 24th January 2017
EWRC-RAE MUTUAL PROJECTS
29th April 2014 Teleconference
4th October 2016 Teleconference
18th July 2016 Teleconference
24rd SG meeting 8th february 2018
Enagás, GRTgaz, Reganosa, REN and TIGF
24th January 2017 Teleconference
41st IG meeting 24th January 2017
GRI North-West Meeting
Enagás, GRTgaz, REN and TIGF
29th November 2016 Teleconference
26th February 2015 Teleconference
12th December 2014 Teleconference
EWRC-RAE MUTUAL PROJECTS
39th IG meeting 4th October 2016
EURELECTRIC transparency requirements
EWRC-RAE MUTUAL PROJECTS
PRISMA General Information
39th IG meeting 4th October 2016
Presentation transcript:

26th IG meeting 23th January 2014 Enagás, REN and TIGF Issues to be discussed 26th IG meeting 23th January 2014

Index Capacity figures to be offered in March. Transfer existing contracts to the VIP. Definition of large and small price steps for each type of product. Documents to upload by TSOs. How to offer the capacity when interruptible capacity is offered on one side and on both sides of the border. Unbundled capacity sale Secondary market: when and where trades will take place, public information. Stakeholders’ information

1. Capacity figures to be offered in March Presented in a specific document

2. Transfer existing contracts to the VIP At the Spanish-French border, Enagás and TIGF agree to transfer existing contracts at physical IPs to VIP. This will imply that as from October 2014 for commercial and operational purposes the physical IPs will no longer exits. This will not imply that existing contracts have to be bundled. ENAGAS TIGF Decision required YES NO At the Spanish-Portuguese border, Enagás will also transfer existing contracts at physical IPs to VIP without bundling existing contracts. As to the contracts signed with REN, there are no contracts to be transferred to the VIP, since no capacity is booked beyond 30 September. Capacity for the next gas year starting October 2014 will already refer to the VIP. ENAGAS REN Decision required YES N.A. NO

3. Definition of large and small price steps According to the CAM NC two different price steps should be defined: one called “large price step” and the other one called “small price step”: Large price steps: Large price steps will be the sum of 5% of the corresponding regulated tariff for each. Small prices steps: PRISMA booking platform sets, as a default rule, that small price steps are 20% of the large price steps. In principle, TSOs will follow this default rule for all products (yearly, quarterly and monthly) However, under common agreement, TSOs can inform the NRAs of different price increments envisaged at the latest one month before the start of the relevant auction. NRAs will have one week to oppose the TSOs’ proposals if deemed necessary.

4. Documents to upload by TSOs ENAGAS Coordinated implementation of the Network Code on Capacity Allocation Mechanisms (with TIGF). Coordinated implementation of the Network Code on Capacity Allocation Mechanisms (with REN). REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms Standard capacity contract – general terms TIGF No documents to be uploaded on Prisma

Opinion on how to offer capacity How to offer the capacity when interruptible capacity is offered on one side and on both sides of the border. Capacity Opinion on how to offer capacity Decision required SIDE 1 SIDE 2 REN ENAGAS TIGF Firm Bundled NO Interruptible Unbundled YES

6. Unbundled capacity At both the Spanish-French border and the Spanish-Portuguese border, Enagás, TIGF and REN will offer all the available capacity (bundled and unbundled) at the VIP. Where capacity will be offered REN ENAGAS TIGF Decision required Bundled capacity VIP NO Unbundled capacity

7. Secondary market For the year 2014, TSOs will put in place a coordinated procedure to allow shippers to trade their bundled capacity in the secondary market: The capacity allocated in the auction is allowed to be transferred by the primary holders to other users in the secondary markets. Primary holders will be able to transfer the total allocated capacity or part of it, and for the total or partial duration of the period for which it was allocated in the auction, starting the first day of a calendar month and for a complete number of calendar months. However, capacity traded in the secondary market must remain bundled and allocated at the VIP. To that aim, capacity trades on the secondary market will only be accepted by TSOs if performed in both cross-border systems, at the same time, for the same amount of capacity and period, referred to the VIP and if transferred to the same Shipper. Once there is a secondary booking platform, TSOs will have the opportunity to use this functionality.

8. Stakeholders´ information Proposed calendar 3 February: Publication of the annual capacities on PRISMA and on the TSOs webpages. February: Publication of the relevant documentation and regulation Documentation by TSOs Coordinated implementation of the Network Code on Capacity Allocation Mechanisms between cross-border TSOs, which includes the detailed rules and capacities Standard contract

Thank you for your attention!