GATEWAY DRAINAGE SYSTEM 2017 WET SEASON/IRMA OVERVIEW

Slides:



Advertisements
Similar presentations
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Advertisements

CASE STUDY OF WADI LABA AND WADI MAI ULE (ELWDP – ERITREA) Lesson 5
HATCH, NM, Background Information Village of Hatch Case Study.
Natural Disasters : Hurricanes By: Sydney Pavelko and Serena Laubach.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Preparing for the Rainy Season SFWMD Operations & Actions.
1 Armour Ranch Road Bridge Emergency Repairs SB County Project Number 01STRM R015 Storm Damage caused during March 5 th 2001 storm.
Lake Livingston Map Cape Royale North Strong North/Northwest Winds ~ 40 to 60 MPH sustained Livingston Dam.
National Weather Service Protecting Lives and Property NOAA/NWS Ohio River Forecast Center Hydrology 1913 to Ohio State Severe Weather Symposium.
CHARACTERISTICS OF RUNOFF
US Army Corps of Engineers BUILDING STRONG ® Skiatook Lake Drought Issues and Management.
The Cayman Islands 2012 Significant Weather Events.
Cyclone (hurricane –typhoon) sailing Very Dangerous...
TROPICAL STORM LEE September 1-6 After Action Report.
Organizational Tabletop Exercise 1 Hurricane Scenario (Community-Based Organizations) Date | Location.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
N ational C limatic D ata C enter 2008 Climate Highlights for the United States Compiled by Karin Gleason and Chris Fenimore Climate Monitoring Branch.
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
Sewer Relief Project. Basement Flooding has been a major problem for city of Selkirk residents. High intensity summer rain storms can result in extensive.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
 Prepared by  Prepared for  City of Palm Coast, Florida  January 27, 2015  Drainage Study Sections 30 & 34 for Development of City Wide Stormwater.
Talking Points 9/6/2005. Background  In our continuing efforts to make sound water management decisions, the scientists and engineers at SFWMD have been.
Hurricanes. Katrina approaching New Orleans August 2005.
SUPERSTORM SANDY Atlantic City, New Jersey, October 2012 Presented by Chris Roselli 2013 ACM JIF Retreat.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
Regional Florida Catastrophic Planning: Focus on South Florida and the Herbert Hoover Dike Region Executive Briefing - June 06, 2007.
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
Weather Outlook El Nino effects: Jet Stream shifts southward and across southern California Alex Tardy – NWS San Diego – November 16, 2015.
*Hurricane Hazel was developed on October 5,1954 and ended on October 18,1954. *Hurricane Hazel was the most deadliest hurricane of the 1954 Atlantic.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
San Francisco Earthquake & Hurricane Katrina
Storm Water Management May 6, WELCOME TO ST. LUCIE WE s T NO WAKE ZONE.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
NWS Mobile / Pensacola Special Briefing NEW NUMBER Please call: Conference ID #: We had to increase the number of lines to accommodate.
Climate Change Threat Floods. Potential Flooding Impacts How might our community be impacted by floods? 2.
Water Predictions for Life Decisions
Anthony Alvarado, PE, CFM National Hydraulic Engineering Conference
Public Works Roads Operations
Comprehensive Sewer Planning Update Meeting
Jefferson County SA Red Rocks Site Approval
FDOT Emergency Shoulder Use (ESU) & One-Way Corridors
Storm Water Pollution Prevention Plan Development
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
Disaster Mitigation Techniques for Householders
Manchester’s CSO Program: A Look Behind and a Look Ahead
West Pacific Typhoon/Hurricane VongFong
HURRICANE MATTHEW AFTER ACTION REPORT.
Overview of Climate Resilience in Transportation Planning October, 2017 Savannah, GA Jill Stark, FHWA, Office of Planning.
Houston, TX Tyler Gentry – Fall09
Florida Keys Canal Remediation Diel Results
Malibu Canyon Pole Replacement Project Information
Weather & the Ocean Page 55.
What causes rivers to flood?
Global Alliance For Disaster Reduction
Water Quality Protection Zones
GLOBAL ALLIANCE FOR DISASTER REDUCTION
Cindy Popplewell AMEC Hazard Mitigation & Emergency Management Program
Hydrology CIVL341.
2013 Floods: Mapping Hydrology and impacts in Larimer County, Colorado
Hydrology CIVL341 Introduction
Sacramento Environmental Commission January 2019.
Community Wildfire Safety Program
Preparing for the 2019 Hurricane Season: Applying Lessons from Hurricanes Irma and Michael Angie B. Lindsey.
Presentation transcript:

GATEWAY DRAINAGE SYSTEM 2017 WET SEASON/IRMA OVERVIEW

13 Year Drought Regional water elevations were very low coming into the end of 2017. We were in the end of a 13 year drought cycle. This resulted in historically low dry season water levels as much as 4 feet below control elevation throughout many of these communities. During this low water time, vegetation expanded along the lake banks and canals. The lack of drainage demand made the maintenance of the system a lower priority.

2017 Lake Bank Remediation Project During this time we started working on the 2017 Lake Bank Remediation project. This work was to address the five lakes in the community with the worst lake bank erosion issues. The work started when the water levels were low, which allowed of easy contractor access to set the toe of the remediation slope and regrade the lake banks.

2017 Wet Season Rainfall Events Wet season started strong in June this year with significant rainfall amounts bringing the regional water levels back up to and over the design control elevations. These above average rainfall months have continued to today. During August 24th to 28 this area received 9.50 INCHES of rainfall. This is the the equivalent of a 25 YEAR design storm for this area. The drainage systems are permitted and designed to: Keep roads dry for a 25 year storm event Keep homes dry for a 100 year storm event This all happened well in advance of Hurricane Irma.

Drainage System Conditions Before Irma High water levels were being experienced in many portions of the drainage system that did not draw down as designed. We tracked this as the lake remediation contractors were dealing with this issue daily. We worked with your staff to find the constrictions in the drainage system that were extending the time for these high water events.

Hurricane Irma Preparation - Inspection We worked with your staff to track the system constrictions and found that the final outfall structure and lake abutting Six Mile Cypress had issues. The outfall structure fish guard had been clogged with hydrilla and was broken in several places. The final out fall lake was also full of hydrilla. These combined to stack water back throughout the entire system.

Hurricane Irma Preparation - Repairs We coordinated with the lake bank remediation contractor and your staff to make localized repairs in anticipation of Irma. The damaged fish guard was removed and the outfall weir was cleared of debris. The final outfall lake was also sprayed to reduce the hydrilla and improve water flow capabilities. This improved the systems ability to draw down the upstream water levels and reduce flooding elevations and durations. Water levels in the system began to drop immediately.

Hurricane Irma Impacts Hurricane Irma made landfall on Marco Island and moved north through the Gateway Community. The storm eye wall hit at 7 PM on Sunday night as a Category 2 hurricane. Wind damage was limited primarily to landscaping, roofs and pool cages. The rainfall with the fast moving storm was found to be 11.5 INCHES in ONE DAY. This correlates to a 100 YEAR storm event. The drainage system did have a responsive rise in the water elevation, but the improved outfall allowed for a faster bleed down and lower peak water elevations.

Irma Drainage Issues

Recommendations Develop an aggressive maintenance program to check weirs and connector waterways during the dry season when access is easier and the system is not under flow stress. Insure that the weirs and connectors are clear of debris and vegetation. Evaluate the in-line and outfall weirs with respect to recorded tail waters to see if any of the weir sizes can be increased or if the weirs can be retrofitted with operable gates for pre-storm water level reduction. Consider revising existing drainage permits with SFMWD and Lee County to accommodate larger weirs and operable gates so water level bleed downs can be accommodated. Document and track rainfall and water level data to discover where there are constrictions in the system to prioritize maintenance work. Review perimeter berm and offsite inflows to protect against uncontrolled breaches. Develop a pre-storm protocol for emergency review of the drainage system constriction points and draw down of the water levels in anticipation of an event.