AIRPORT PLANNING 101- THE BASICS

Slides:



Advertisements
Similar presentations
Airport Planning and Design
Advertisements

AMG 1204 Airport Management By Zuliana Ismail, 2010.
AACC Compatible Land Use Planning Series Series Includes Presentations from: FAA Airports Division – March 10 AACC Meeting Planning Department, Municipality.
Federal Aviation Administration FAA Airports Programs Update IRWA Federal Agency Update Washington, DC March 24, 2014 Rick Etter FAA Office of Airports.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
Presented to: By: Date: Federal Aviation Administration Properly Aligning your ACIP for the annual planning meeting 2014 Annual ACA Conference Patrick.
Yakima Air Terminal/McAllister Field Master Plan Airport Board Briefing May 21, 2012 YAKIMA AIR TERMINAL | McALLISTER FIELD | Yakima, WA 1.
Presented to: 32nd Annual Airport Conference Hershey, PA By: Patricia Henn, AIP/PFC Program Manager Date: March 4, 2009 Federal Aviation Administration.
Presented to: Association of California Airports By: Peter F. Ciesla, Environmental Protection Specialist Date: September 21, 2006 Federal Aviation Administration.
Federal Aviation Administration Wood River Region Replacement Airport EIS Who:City of Ketchum & City of Sun Valley Date: February 13, 2008.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
Chapter 5:intrument flight rules
Federal Aviation Administration Rick Etter Airports Acquisition Specialist FAA, Office of Airport Planning and Programming International Right-of-Way Association.
AMG 1204 Airport Management By Zuliana Ismail, 2010.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
October 18-20, 2010 LONG BEACH, CALIFORNIA
Focus Points Airport Layout Plan (ALP) Overview ALP Guidance
Presented to: By: Date: Federal Aviation Administration Airports Division Eastern Region Grant Closeout Guidance 33 rd Annual Airports Conference Patricia.
Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, Airports Division Great Lakes.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Federal Aviation Administration.
Presented to Georgia Airports Association Conference October 21, 2009 EPA Spill Prevention Control and Countermeasures – Update Also – What’s Coming with.
PRESENTATION TO THE NCOP ON THE CONVENTION ON INTERNATIONAL INTERESTS IN MOBILE EQUIPMENT BILL, MARCH 2007.
State Safety Inspections and Sponsor Expectations.
Aviation and the Environment. The Role of General Aviation The aviation industry has been successful in adopting an environmental agenda that supports.
Presented to: By: Date: Federal Aviation Administration Environmental Document Preparation WETLANDS BEST PRACTICES 33 rd Annual Airports Conference Marie.
LECTURE 4: ICAO CHART requirements
FUTURE OF AIRPORT MANAGEMENT 1. Though, we cannot predict precisely what airport management be in next 100 years, but it will evolve with changes in technologies,
Proposition 1 Workshop: the Grant Application Process July 2015.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
PRESENTATION TO: CITRUS COUNTY BOARD OF COUNTY COMMISSIONERS 11 AUGUST 2015 INVERNESS AIRPORT MASTER PLAN UPDATE.
Transportation for special Education
A Principal’s Guide to Title I, Part A and LAP Requirements
Physical Characteristics
Workshop on preparations for ANConf/12 − ASBU methodology
Draft Environmental Assessment Report for Bradley International Airport October 2016
Agenda ACRP Project What is NextGen?
Collaborative Decision Making Module 5 “The Collaborative Environment”
District of innovation
State Safety Inspections
Hangar Use Policy Winter Operations and Field Condition Reporting
FAA / OAC Grant Assurances
Eligible Services and Fiber Options for Service Providers
ACA Conference - September 2017
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Airport Planning.
Infrastructure planning and management
How Air Traffic Is Coordinated
Draft Transportation Element September 6, 2017
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Chapter 5 Planning.
What is the Value of Planning for My Airport?
AIP Eligibility Presented to: Oklahoma Airport
2017 Annual Conference, South Lake Tahoe Rayvon Williams,
Continuous Climb Operations (CCO) Saulo Da Silva
How Air Traffic Is Coordinated
McKinney Airport Master Plan Update April 3, 2018
How Air Traffic Is Coordinated
Effectively Communicating Your Project in a Funding Request
McKinney Airport Master Plan Update May 1, 2018
Operationalizing Export Certification and Regionalization Programmes
NAVIGATING THE NEPA PROCESS Prepared by: Janet Flynn, PennDOT’s Bureau of Aviation Sue McDonald, Federal Aviation Administration September 18, 2018.
Capital Improvement Plans
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Airport Planning and Programming
SPR-B Research Coordination Webinar
Pierre Regional Airport Master Plan Update
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Improve Your Odds A Grant Writing Workshop
Presentation transcript:

AIRPORT PLANNING 101- THE BASICS Prepared for: The 37th Annual Pennsylvania Aviation and Aerospace Conference Greensburg, Pennsylvania September 27, 2017 Presented by: Tom Tomczyk Pennsylvania Department of Transportation Bureau of Aviation

PRESENTATION ITEMS WHY PLAN? AIRPORT MASTER PLAN AIRPORT LAYOUT PLAN SPECIAL ISSUES ROLE OF BOA PLANNERS

WHY PLAN? MEET AVIATION NEEDS RIGHT-SIZE FACILITIES FOR REGULAR USERS AVOID RELOCATION AND RE-CONSTRUCTION OF FACILITIES IDENTIFY CONSTRAINTS ECONOMIC DEVELOPMENT OPPORTUNITIES

WHY PLAN? FUNDING Keeping the Airport Plans current is a legal requirement for airports that receive Federal assistance. The federally mandated ALP, as well as the forecast and critical aircraft data are the essential items to be eligible for funding. All federally obligated airports have an ALP. Non-federally obligated airports which primarily are privately-owned public use airport are encouraged to have an airport sketch if they are contemplating major aviation development such as runway widening and an extension.

WHY PLAN? JUSTIFICATION PURPOSE AND NEED ELIGIBILITY Development needs to be consistent with forecasts for the planning period which typically is 20-years. For example, an increase of 25% in based aircraft should not result in a 100% increase in hangars and ramp. Purpose and need for facilities are also looked at especially runway extension which are only justified for planning if forecasts indicate that there will be over 500 annual operations by the design aircraft group within the planning period.

WHY PLAN? FEASIBILITY CONSTRUCTION ENVIRONMENTAL Desired improvements requiring impacting runway operations, substantial relocation of existing facilities and\or earthwork may not be feasible to construct. Environmental constraints such threatened and endangered species, archeological sites and wetlands influence improvements. DEP regulations regarding storm water management effects any increase in impervious surfaces. Therefore airports need to plan for the minimum amount of pavement and buildings needed during the planning period.

WHY PLAN? FEASIBILITY AIRSPACE FUNDING & SUPPORT Instrument procedures may be needed to meet aviation demand. This has an affect on the size of approach surfaces, marking and visual navaids. Feasibility of procedures such as obstacle clearance and meteorological conditions are looked at. Large projects desired by sponsor that would require millions in funding need to be financially feasible with a BCA ratio of 1 or greater. Support includes general acceptance by the surrounding community of a project, not opposition. Support also extends to demonstrating additional local share of funding to accomplish projects that cannot be FAA and state funded.

WHAT IS AN AIRPORT MASTER PLAN? A Master Plan which is a comprehensive study that includes several elements that: justifies identifies describes the short, medium, and long term development plans necessary to meet current and future airport needs. An airport study follows the key elements of planning. The level of documentation depends on the complexity of the airport and or its issues.

TYPICAL MASTER PLAN ELEMENTS INVENTORY OF EXISTING CONDITIONS AVIATION DEMAND FORECASTS REQUIREMENTS ANALYSIS AIRPORT LAYOUT PLAN IMPLEMENTATION PLAN Airport Master Plans include at least an inventory of existing facilities and the environment which is the current condition of the airport, aviation demand forecasts which is future activity, facility requirements which are current and future needs, capital improvement plan and airport layout plan drawing set which document future plans to meet airport needs. A more comprehensive Master Plan with several elements, including an alternatives section showing options of how the airport can be developed and or a detailed financial plan forecasting future revenues and expenses along with sources of funding beyond aviation development grants as well as implementation feasibility and economic development opportunities to foster sustainability. These type of documents are for more complex airports, have several issues and/or is desiring a major deviation from prior plans such as a major runway extension or new runway.

EXAMPLE ALP Here is an example ALP.

ALP REQUIRED ELEMENTS & FEATURES STANDARD PLAN SIZE, TABLES & FEATURES PLAN & PROFILE VIEWS AIRPORT AND RUNWAY DATA METEORLOGICAL DATA UNIQUE CONDITION NOTES ALPs need to be at a standard size and to scale. The ALP is mostly in plan view but inner approach and departure surfaces are also in profile view. The FAA requires specific data tables for the airport, runways, buildings and other conditions. The ALP also contains wind data for different weather conditions and for all-weather. Unique conditions such as date of mapping, clear threshold siting and obstacle free zones are noted on the ALP. Also, don’t forget the north arrow and other specific details.

STANDARDS AND MODIFICATIONS DESIGN STANDARDS MODIFICATIONS Design standards such as runway width and separations are checked. Any modifications to standards need to be identified and approved prior to funding. For this airport a modified runway taxiway separation based on the design airplane vs. the entire design group was approved prior to a grant to rehabilitate and widen this runway. The current and planned runway length needed to accommodate only the smaller end of the design group.

SPECIAL ISSUES COMPLIANCE SUPPORT NEXTGEN Planning also may have to consider special issues. Although not directly an element of planning, compliance issues may likely affect an airport’s eligibility to obtain funding to implement its plan. In support of the FAA’s NEXTGEN initiative, Bureau planners are responsible for verifying Instrument Procedure Development requirements at Block Grant and Non-Federally obligated Pennsylvania airports. Planning should verify items such as clear threshold siting surfaces, runway length/width, marking, lighting and signage. Planners then provide this information to FAA Flight Procedures. NEXTGEN is the modernization of National Airspace System that will rely on satellite based navigation (GPS) and surveillance, reducing ground based navigation and radar equipment.

SPECIAL ISSUES AIRPORT ZONING BRIEFINGS The Planning outside the Master Plan should promote airport hazard zoning by local municipalities through the airports. The BOA retains a program to fund these efforts provided the zoning is enacted. Planning issues may involve legislative briefings regarding all facets of aviation. Some of the information is offbeat and specific to the aviation industry and the response can involve the Airport, their Consultant and the BOA. For example, the response to legislator letter above from the BOA explained why it has been more difficult for funeral homes to transport deceased loved ones to long distances without going to a large airport. The primary reason is that most flights at small hub and non-hub airports are performed by regional jets which do not have the cargo capacity to transport caskets. Fedex and UPS which have aircraft capacity, are not allowed by regulation to perform this service.

SPECIAL ISSUES ECONOMIC DEVELOPMENT OPPORTUNITIES

SPECIAL ISSUES RUNWAY EXTENSIONS Funding Available Competitive NPR “The climb to construction” Competitive NPR Positive Benefit –Cost Ratio Environmental Clearance and Local Support Funding Justification –Documented Regular Use Feasibility to Meet Standards

SPECIAL ISSUES RUNWAY EXTENSIONS “….fuhgeddaboudit” “failure to maintain minimum climb through the process” “….fuhgeddaboudit”

ROLE OF THE BOA PLANNERS OVERSEE AIRPORT PLANNING: REVIEW PLANNING STUDIES APPROVE FORECASTS AND AIRPORT LAYOUT PLANS & ENSURE THAT FUNDED AIRPORT PROJECTS ARE JUSTIFIED AND FEASIBLE ADDRESS SPECIAL AND UNIQUE ISSUES Primary Functions of Airport Planners includes overall review of planning studies pertaining to aviation in the Commonwealth. We also address special and unique issues such as airport zoning.

ROLE OF THE BOA PLANNERS ….. AND FACILITATE COMMUNICATION BETWEEN AIRPORT STAKEHOLDERS AND THE BUREAU We also help airport stakeholders understand and, through effective planning, conform with aviation rules, regulations and policies of the Commonwealth. This includes aviation safety and program requirements to obtain aviation development grants.

OVERSEE AIRPORT PLANNING NATIONAL PLAN “NPIAS” STATEWIDE PLAN REGIONAL & INDIVIDUAL AIRPORT PLANS The BOA planners through review and guidance integrate national airport planning through statewide to regional and individual airport plans. This includes airports of all sizes of which have a specific role in these systems.

REVIEWING ALP’S REQUIRED ELEMENTS & FEATURES JUSTIFICATION STANDARDS & MODIFICATIONS FEASIBILITY PRESENTATION APPROVAL Here are the items we review.

REFERENCE MATERIALS FAA Advisory Circulars FAA Orders Federal Aviation Regulations Transportation Security Regulations Security Related Publications FAA Reports General Airport Publications FAA Web Sites Statewide Airport System Plan FAA Environmental Desk Reference Example of number of volumes FAA Advisory Circulars – over 800 volumes FAA Orders - over 7,500 volumes The Planning Section is very familiar with these reference materials and know where to find the information