Bidding Requirements Review Questions.

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Construction Contracting
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Procurement Management
Office of Purchasing and Contracts Procurement Outreach Training Level III Procurements $50,000 and Above.
USDA Child Nutrition Programs.  Procurement (purchasing rules) must apply to all purchases that are supported, in whole or in part, with non-profit food.
RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
TENDERING J. Marc MacEwing Shapiro Hankinson & Knutson Law Corporation.
Utah Procurement Code Training
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
Tendering Procedures in Lagos State under the Public Procurement Law 2011 Presented By Engr. Akin Onimole | February 13, 2013 GM/CEO, Public Procurement.
Haywood County Procurement Process Overview. Prepared by Haywood County Finance Department Julie Davis, Finance Director Donna Woodruff, Purchasing Manager.
Uniform Public Construction Cost Accounting (UPCCA) presented by: Kevin Cobb AIA/ARA, the Addington Partnership William Duncan IV, Taft College December.
November 19, 2013 Preparing a Successful RFP to get Desired Results.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Multi-Stage Bidding.
Office of Purchasing and Contracts Procurement Outreach Training Level III Procurements $50,000 and Above.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Marcy Mealy Procurement Specialist CDBG Program
Project Procurement Management
CIVL202 Construction Engineering I
PROCEDURES FOR SELECTING THE CONTRACTOR
INTRODUCTION TO PUBLIC PROCUREMENT
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
1 1 Module II. Bidding and Evaluation Process I.Bidding documents (Stages of bidding & preparation of bidding document) II.Bid evaluation methods (principles.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Encouraging Diversity Growth & Equity 123: Demonstration of Good Faith Todd McGonigle EDGE Program Manager Phone (614) FAX (614)
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
ISP Preparation Series 3- Chapter 6. NISPOM Chapter 6- Visits and Meetings  General- anticipate discussion  Classified visits- minimum and.
United Nations Procurement Division
Commonwealth Self Bonding Program by the Department of General Services – Division of Engineering and Buildings Department of Treasury – Division of Risk.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
West Contra Costa Unified School District: CONTRACTOR DEBARMENT POLICY Facilities Sub-Committee October 9, 2012.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Rabbanai T. Morgan Current as of 26 January 2006 Protests.
Chapter 11: Project Procurement Management
Competitive Bidding Construction Engineering 380 Engineering Law.
Department of Education Race to the Top Assessment Program January 14, 2009 Public Meeting Procurement Issues Mark D. Colley 555 Twelfth Street, NW. Washington,
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Procurement in Projects Financed by Islamic Development Bank Presented during Project Start-up Workshop September 2015, Jakarta, Republic of Indonesia.
Office of Procurement Services.  Vendor Application Website: 
CSO Observer Member of the Evaluation Committee. Civil Society Organization May have representation in the Evaluation Committee As a member of the Evaluation.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Licensing Determinations and Contractor Licensing Responsibility Licensing Determinations The Housing Authority will specify the classification(s) of a.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Assessment of the Bidding Process in Construction Project ABDULLAH H. ABU ZANT. AYMAN K. ILAIWI. MOHAMMED FADEL. SODQI M. ALHNAINI. AN-NAJAH NATIONAL UNIVERSITY.
FIDIC Tendering Procedures
Sub-recipient Monitoring and Contractor Determination
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
Award Management Services
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
CDBG Procurement Date of Session, 2017 Washington, DC Brian Delvaux
Department of Community Development
BIDDING AND STANDARD BIDDING DOCUMENTS (SBDs)
Bid Evaluation and Award
Request for Proposal & Proposal
PROJECT DELIVERY METHODS
Manajemen Konstruksi Bidding & Award
BIDDING DOCUMENTS AND MAIN FEATURES
Lecture 10 PROCUREMENT Ferdinand FASSA.
Procurement Planning Mani Ram Gelal
OCPS CCNA SELECTION COMMITTEE TRAINING
United Nations Procurement Division
Agenda Topics: Competitive Bidding Determine Selection Method
Presentation transcript:

Bidding Requirements Review Questions

1. All of the following are correct concerning the Bid Form EXCEPT: a. A document prepared in the form of information from the bidder to the Owner. b. It is always a part of the Contract Documents. c. It is prepared to assure a uniform arrangement which facilitates comparison and equal consideration for awarding the contract. d. It contains a space for the bidder's signature.

1. All of the following are correct concerning the Bid Form EXCEPT: a. A document prepared in the form of information from the bidder to the Owner. b. It is always a part of the Contract Documents. c. It is prepared to assure a uniform arrangement which facilitates comparison and equal consideration for awarding the contract. d. It contains a space for the bidder's signature.

2. The purpose of the Invitation to Bid is to: Attract qualified bidders Meet legal requirements on publicly bid projects To help prospective bidders decide whether to obtain the bidding documents.

2. The purpose of the Invitation to Bid is to: Attract qualified bidders Meet legal requirements on publicly bid projects To help prospective bidders decide whether to obtain the bidding documents.

3. Criteria for setting the date for submission of bids should include all of the following EXCEPT; Time for settlement of questions and discrepancies. Time required to process requests for approvals of substitutions. Time for the Owner to review the qualifications of the subcontractors. Time for collection of Subcontractor bids.

3. Criteria for setting the date for submission of bids should include all of the following EXCEPT; Time for settlement of questions and discrepancies. Time required to process requests for approvals of substitutions. Time for the Owner to review the qualifications of the subcontractors. Time for collection of Subcontractor bids.

Bid security information Geotechnical data Which of the following would be appropriate to be included in the "Information Available to Bidders": Bid security information Geotechnical data Time of completion to construct the project Description of the work

Bid security information Geotechnical data Which of the following would be appropriate to be included in the "Information Available to Bidders": Bid security information Geotechnical data Time of completion to construct the project Description of the work

Right to reject bids and governing laws and regulations 5. The Invitation to Bid/Advertisement for Bid includes all of the following EXCEPT: Right to reject bids and governing laws and regulations Bid opening date, time, and location Details concerning bid security requirements Bidders prequalification

Right to reject bids and governing laws and regulations 5. The Invitation to Bid/Advertisement for Bid includes all of the following EXCEPT: Right to reject bids and governing laws and regulations Bid opening date, time, and location Details concerning bid security requirements Bidders prequalification

Comply with required bidding procedures 6. Sufficient information should be contained in the Bidding Documents to enable bidders to do all of the following EXCEPT; Comply with required bidding procedures Determine that the project meets all building codes Understand bidding and awarding requirements Understand conditions which apply after bid submission and prior to contract award.

Comply with required bidding procedures 6. Sufficient information should be contained in the Bidding Documents to enable bidders to do all of the following EXCEPT; Comply with required bidding procedures Determine that the project meets all building codes Understand bidding and awarding requirements Understand conditions which apply after bid submission and prior to contract award.

7. During the bidding process: Bids may be discussed before the set time of their opening Subcontractors may not use Bid Depositories The Contractor should expect his potential Subcontractors to review those plans available in plan rooms. The bidder should be allowed to withdraw his bid before the specified time for receipt of bids.

7. During the bidding process: Bids may be discussed before the set time of their opening Subcontractors may not use Bid Depositories The Contractor should expect his potential Subcontractors to review those plans available in plan rooms. The bidder should be allowed to withdraw his bid before the specified time for receipt of bids.

Answers b a c d