Regional Transmission Organizations

Slides:



Advertisements
Similar presentations
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
Advertisements

Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Wholesale Restructuring 1.PURPA 2.Market based wholesale rates 3.Incentive rates 4.Energy Policy Act of 1992 Clarified power to order third party wheeling.
Transmission Independence and Investment Pricing Policy for Efficient Operation and Expansion of the Transmission Grid FERC Docket Nos. AD and.
Regional Transmission Organizations: The Future of Transmission? Dave Edwards 4/17/2004.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
1 “The National Grid” Presented To The Fall Tri-State Member Services Conference October 10, 2001 Covington, KY Jeff Mitchell ECAR Manager, Transmission.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
Towards Regional Independent Operators – a main driver for successful market integration.
Regulatory Barriers to the Adoption and Diffusion of Stationary Fuel Cells in Ohio William M. Bowen Professor, Public Administration and Urban Studies.
Rethinking Vertical Integration in Electricity Robert J. Michaels California State University, Fullerton 18 th Annual Western Conference.
The Continuing Evolution of U.S. Electricity Markets
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
AMERICAN PUBLIC POWER ASSOCIATION NATIONAL MEETING Salt Lake City June 15, 2009 Panel: “WHAT DOES IT TAKE TO GET TRANSMISSION BUILT?” Remarks of James.
Lessons from electricity liberalisation in the US and elsewhere: perspectives for Europe Richard Green Institute for Energy Research and Policy.
ThinkEquity Summer Call Series “CAN WE DEAL WITH THE CHALLENGES TO GETTING TRANSMISSION BUILT?” Remarks of James J. Hoecker Husch Blackwell Sanders LLP.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
George A. Godding, Jr. Director, Management and Communications Office of Market Oversight and Investigations Comments are the speakers and do not necessarily.
Christopher Burleson Leslie Kay Ritchie Jitesh Sharma European Energy Restructuring: The Quest for a Competitive Single Energy Market.
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC 10/09/2003 KENNETH A. DONOHOO, P.E. Manager of System Planning Transmission Services
Impact of Liberalization of the Electricity Market on Energy Efficiency, Quality of Supply and Environmental Performance Eric BONNEVILLE ECI Webconference.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010 The Honorable Philip D. Moeller Commissioner Federal Energy Regulatory Commission “ENERGY.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Enhancing Reliability of the North American Transmission Grid Enhancing Reliability of the North American Transmission Grid Presented By Dejan J Sobajic.
Trends in Retail Competition: Private Labels, Brands and Competition Policy A Symposium on the Role of Private Labels in Competition between Retailers.
Transmission Planning Informational Workshop Montpelier, VT September 19, 2005 Allocating the Cost of New Transmission in New England Stephen J. Rourke.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Updated 1/28/2011.
Presentation to Oireachtas Committee on Communications, Marine and Natural Resources by Harry McCracken Group MD Viridian Power & Energy David de Casseres.
International Banking. Description Cross border cross country facet of banking business May not necessarily own or hold a physical presence offshore Traditional.
Illinois Wholesale Market Update December 10, 2003.
Wholesale Electricity Spot Market (WESM)
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
FERC Order 1000 Transmission Planning and Cost Allocation Key Points of Seminole Electric Cooperative, Inc.’s Proposal FRCC Regional Stakeholder Meeting.
Utility owned generator Federal Power Project Distribution System Residential users Commercial users Industrial users Municipal Utility Residential users.
Electricity Power Market: Competitive and Non-competitive Markets Ito Diejomaoh.
Essentials of Health Care Marketing 2 nd Ed. Eric Berkowitz Chapter 10 Distribution.
BGE Smart Grid Initiative Stakeholder Meeting September 17, 2009 Wayne Harbaugh, Vice President, Pricing and Regulatory Services.
Alliance Update Illinois Commerce Commission Electric Policy Committee July 10, 2001.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
Chapter 8 Strategy in the Global Environment
Chairman of the Board and CEO,
Regions – the future for the European Internal Electricity Market?
Wind Management at MISO
IAAE International Conference Singapore June 18-21, 2017
FERC Standard Market Design Working Papers
REFLECTED IN JAMAICA’S ENERGY POLICY
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010
The New Texas Wholesale/Retail Market
International Conference
Ashgabat International Energy Charter Forum
Massachusetts Electric Restructuring Roundtable
Wholesale Electricity Marketing & Trading Fundamentals
Strategies of Reliable Transmission of Energy In A Competitive Market
Powering Towards Clean Energy in Europe
Transmission As Enabler
New England Resource Adequacy
Chapter 8 Strategy in the Global Environment
Utility Owned Generation? (UOG)
Walter Boltz Chairman, CEER Gas Working Group
Vice President, Markets Development
ELECTRICITY TRANSMISSION PROJECTS IN THE BSEC REGION
Chapter 8 Strategy in the global Environment
Coal as Green Energy Source
Solar Energy Commercialization
Dr. Richard A. Rosen Tellus Institute – Boston, MA
ROMANIA 2019 NEEDS IDENTIFICATION ROMANIA 2019.
Presentation transcript:

Regional Transmission Organizations A Competitive Solution for Sustaining and Improving Electric Reliability and Economic Efficiency September 2001

Overview Evolution of Wholesale Electric Markets Achieving Economic Efficiency and Reliability Economic Benefits Reliability Benefits Scope of FERC Proposal Conclusion

Evolution of Wholesale Electric Markets From Local to Regional in Scope Vertically-integrated electric utilities built and operated power plants on a stand-alone basis to serve retail customers in their franchise areas Wholesale markets were local, and utilities traded electricity with neighboring utilities Eventually, wholesale markets expanded from local to multi-state regional markets Increased scope was driven by: Economics Reliability Implementation of RTOs today is not dependent on a deregulated retail market

FERC’s Approach to Achieving Economic Efficiency and Reliability In a New Century Increased demand and rising costs require access to, and utilization of, transmission networks on a comparable basis for all market participants FERC Order 888 provides market participants with non-discriminatory open-access to transmission networks FERC Order 2000 requires utilities owning transmission networks to develop independent RTOs These organizations would be independent of both buyers and sellers FERC Orders of July 12, 2001 calls for the: Development of five RTOs covering the entire nation Organizational as well as physical infrastructure necessary for supporting competitive electricity markets Standardization of interconnection procedures

Economic Benefits of Large RTOs Savings from increased energy trade and competition – larger markets provide access to more buyers and sellers, with resulting downward pressure on prices Discrimination in today’s market place hurts consumers to the extent they cannot obtain the cheapest most efficient sources of power products and deal structures Use of existing generation is more efficient, and viability of new environmentally friendly technologies is increased As total number of institutions is reduced, savings in RTO set-up and operating costs are realized Larger RTOs can spread operational costs over a greater number of users or transactions

Reliability Benefits of Large RTOs Consistency in reliability criteria in each geographic region Ability to better see the “big picture” across a region Improved transmission system planning Improved outage coordination Increased ability to determine available transmission capacity and manage congestion Increased coordination of real-time energy disturbances

Scope of RTOs is Appropriate and Necessary Continued integration of the high-voltage transmission system in the United States will lead to more efficient use of generating resources, reducing energy bills, conserving resources and new investment in transmission Vertically integrated utilities continue to discriminate against IPPs and power marketers through scheduling advantages, inadequate and delayed information sharing Integration can only be accomplished through organizations of sufficient scope to encompass the relevant market Industry efforts to date have been slow to develop, and represent an excessive degree of fragmentation Integration must span a sufficient geographic scope to realize the gains from improved operating and planning efficiency for generation and transmission Efficient and reliable operation of our nation’s bulk transmission system requires elimination of inconsistent and burdensome differences in how access to this resource is granted

Conclusion FERCs mediation process for the Southeast was focused and productive Results of 45-day mediation process reflect the majority of participants favoring a “best practices” PJM/SPP cornerstones as initial market structure Real time spot energy market Efficient mechanisms to assure optimization and relieve congestion Independent board structure that accommodates a for-profit RTO entity with a significant stakeholder advisory process Endorsed Transco Southeast RTO plan enjoys strong support from a broad cross-section of interested parties Municipal utilities Cooperatives Electricity consumers Power marketers Public support for FERC implementation of RTOs is next step