Environmental Cleanup Program Status

Slides:



Advertisements
Similar presentations
Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Advertisements

Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
BoRit Superfund Site Timeline
1 Fort Monroe: An Update on the Environmental Cleanup VDEQ Presentation to the Fort Monroe Federal Area Development Authority March 19, 2009.
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
Melinda Brunner DEC Contaminated Sites Program 20 th Annual Alaska Tribal Conference on Environmental Management Anchorage, Alaska October 30, 2014.
Public Draft Removal Action Workplan Proposed Richmond Bay Campus Site RES Area and Groundwater Public Meeting December 5, © keh.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Stephen TerMaath Chief, BRAC Program Management Division 5 June.
California EPA Dept. of Toxic Substances Control Brownfields & Environmental Restoration Program Sam V. Martinez, Jr.
WWII Navy Bomb Disposal School , on AU campus for research & education CIVIL WAR Ft. Gaines & other forts located near SV area during Civil War.
SWMU 48, 62 and AOC G/SWMU 49 Update Joint Base Charleston Weapons Partnering Meeting December 4, 2013.
Air Sparging at Fort Greely, Alaska Presented by Aung Syn & James Powell.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
Former Landfill Environmental Management Plan Update May 8, 2012.
Fort George G. Meade Groundwater Contamination, Odenton, Maryland Interim Measures Update Restoration Advisory Board Meeting November 18,
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Dr. Stephen TerMaath Chief, BRAC Program Management Division 22.
NYS Department of Environmental Conservation NYSDEC Public Meeting September 12, 2013 Brooklyn Navy Yard, Building 92 Former Kent Avenue Site 500 Kent.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
US Army Garrison Picatinny Arsenal Agenda for 11 June 2014 Picatinny Arsenal Restoration Advisory Board Attendance, Introductions & Correspondence Old.
Site Activities Update Park – Euclid RP Group Community Advisory Board Meeting January 16, 2013.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site August 20, 2013.
Fairbanks Areawide Industrial Reclamation Project AREA HISTORY Janice Wiegers ADEC.
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
1 30 October 2002 Former Five Points Outlying Field (OLF) Neighborhood Meeting October 30, 2002.
Waste Management Strategy Outline - Geography - Future Needs – 5 and 25-Year Time Frames - Capacity - Near-Term Needs - Long Term Needs.
Maryland Department of the Environment Harbor Point – Regulatory Overview Horacio Tablada, Director Land Management Administration November 14, 2013.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
UC Berkeley Richmond Field Station Remediation and Restoration Project January 16, 2008 Town Hall Meeting Agenda 1.Project Background 2.Recent Activities.
Team Successes at the Former Memphis Depot, Memphis, Tennessee Presented by: David D. Nelson, P.G.Thomas C. Holmes Project Manager, CH2M HillProject Manager,
Fort George G. Meade KEMRON PBC Sites Near-Term Deliverables Update Operable Units 1, 3 and 5 Restoration Advisory Board Meeting March 17, 2011 KEMRON.
Name/Office Symbol/(703) XXX-XXX (DSN XXX) / addressDate-Time-Group 19 September 2008 Fort Monroe Closure Environmental Planning.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
Feasibility Study Workplan Park – Euclid RP Group Community Advisory Board Meeting May 23, 2013.
LTP and FSS Plan Project Status Overview Presented by Bill Barley September 28, 2015.
Division of Waste Management Dexter R. Matthews, Director Mission: to prevent harmful releases of waste to the environment and clean up existing contamination.
1. 2 Presentation Highlights BGOU overview Scope of the Remedial Investigation Investigation results Schedule 2.
Marshall Landfill Site.  Patrick Cabbage, Hydrogeologist/Site Manager  Bill Fees, Engineer  Carol Bergin, Public Involvement Coordinator.
Long-Term Management of Contaminated Soil and Groundwater – Iwilei District, Honolulu April 16, 2015.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
Atlas D Missile Site 4 Remediation. University of Wyoming Misty Heil Social Work, Political Science, Honors Senator Chris Rothfuss Honors.
Omaha Riverfront Redevelopment Project Brownfields 2004 C. Dale Jacobson, P.E., DEE.
Fort Detrick Installation Restoration Program Area B Groundwater November 1, 2010 Fort Detrick, Maryland A Sustainable Community of Excellence.
N. C. Department of Environment and Natural Resources Division of Waste Management Stony Hill Road Contamination Wake County.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Proposed Plan for No Further Action
Environmental Cleanup Program Status
Environmental Cleanup Program Status
“building and preserving Alaska’s Future” Program Highlights
Wurtsmith Restoration Advisory Board Meeting
Agenda for 24 OCT 2013 Picatinny Arsenal Restoration Advisory Board
Attendance, Introductions & Correspondence Old Business
Jim Flechtner, PE Executive Director April 26, 2018
Timothy Veatch, Section Chief
Mulberry Watershed Management Plan
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
ESCA Remediation Program Update
Update on Water Quality
Advanced Environmental Management (AEM) Training Phase I
Surface Water Ambient Monitoring Program
UNC Superfund Research Program
Perchlorate Issues at the Massachusetts Military Reservation (MMR) and the Aberdeen Proving Ground (APG) 9th Annual Joint Services Environmental Management.
From Tanker Roll-Over to NFA
Groundwater Contamination Cases in Texas
Board of Public Utilities August 17, 2017
Presentation transcript:

Environmental Cleanup Program Status Glen Shonkwiler U. S Army Space and Missile Defense Command Environmental Division 23 May 2007 Fort Greely Restoration Advisory Meeting

FGA Installation Restoration Program Reports/Workplans Following Reports & Workplan now on RAB website http://www.smdcen.us/rabfga/pages/documents.asp: Final 2005 Remedial Investigation Report 2006 Bioremediation Analytical Data Report 2006 Soils RI Analytical Data Report 2006 Groundwater Analytical Data Report 2006 Military Munitions Response Program SI Report 2006 Miscarriage Investigation Update (http://www.smdcen.us/health) 2007 SM-1A Pipeline Closeout Report Addendum (to 2004 Report) 2007 Groundwater Monitoring Plan Technical Memorandum 2006 South Tank Farm (STF) Bioremediation Corrective Action Report – Draft to be submitted in late May 2006 RI Report – Draft to be submitted in early June 2007 RI Workplan – Draft to be submitted in early June

FGA Installation Restoration Program 2006 Soil Results STF subsurface soil sampling results have contradicted field observations (strong odors, but limited contamination in analytical samples). Plan to do additional sampling in 2007. STF surface soil bioremediation of 7000 CY successful. Phase 2 (approximately 5000 CY of contaminated soil remaining) to begin late June 2007. Bldg 626 petroleum spill successfully remediated. SM-1A pipeline station 21+25 suspected petroleum spill was investigated and found to require no further action. Defined the extent of lead and dioxin contamination at the Refuse Burn Pit. Remediation planned for 2008.

South Tank Farm Bioremediation Project

FGA Installation Restoration Program 2006 Groundwater Results Semi-annual groundwater sampling of monitoring wells across Fort Greely (June and October). Several groundwater monitoring wells had results above ADEC cleanup levels, safe drinking water levels, or maximum contaminant levels (MCLs): Trichloroethylene (TCE) in MW-2 in June (but below MCL in Oct) Benzene in MW-5 in Oct (but below MCL in June) Ethylene Dibromide (EDB) in MW-12 (newly installed at STF) Diesel Range Organics (DRO), Gasoline Range Organics (GRO) and Benzene in MW-14 (perched aquifer well newly installed at STF) Drinking water wells showed no contaminants above safe drinking water limits.

FGA Installation Restoration Program 2007 Investigation/Remediation Plans Determine the extent of deep contamination at the South Tank Farm Sample groundwater monitoring wells across Fort Greely Install remediation system for subsurface petroleum contamination at the former Evergreen Road POL yard Complete Phase 2 of the bioremediation at the South Tank Farm Investigations planned for 6 Compliance Cleanup sites Supporting ADEC remediation of North Delta Tank Farm Proposed Plan for closeout of a number of IRP Sites

Military Munitions Response Program (MMRP) The Army Environmental Center (Aberdeen, MD) and the US Army Corps of Engineers (Sacramento, CA) began an MMRP Site Investigation (SI) at Fort Greely in 2006. Draft SI Report posted on website. AEC & USACE working on responding to ADEC comments. Fort Greely has 3 sites in the MMRP (all conventional munitions): Rifle Range 1 (no further action recommended) Landfill 3 (no further action recommended) Site 112 Former Scrap Yard (further action recommended) Jarvis Creek Burial Area removed from Fort Greely’s MMRP after determining that it is located on the Fort Wainwright’s Donnelly Training Range. Army exploring property line issue and how to proceed.

SM-1A Nuclear Reactor Characterization US Army Corps of Engineers has secured funds to perform the historical records search and begin planning efforts for a Characterization Study of any remaining radioactive contamination from the operation of the SM-1A nuclear reactor. Known contamination consists of the following access restricted areas: - entombed contaminated reactor structure - small portion of wastewater pipeline within reactor compound Historical Records Review planned for 2007. Fort Greely site visit planned by USACE for week of June 11, 2007. Planning meeting for workplan preparation planned for Fall 2007 Workplan and fieldwork currently not funded Effort is the initial activity for the complete decommissioning of the SM-1A reactor

Health Concerns Investigation Fort Greely, the US Army Center for Health Promotion and Preventive Medicine (or CHPPM), and the Bassett Army Community Hospital (Fort Wainwright) investigated concerns during winter of 2005-06 over the perceived high rate of miscarriages (and the possibility of environmental causes) Briefings at 12/01/05 & 3/9/06 Community Meetings on Fort Greely included: Types and causes of miscarriages Environmental exposure and environmental risks Results of the investigations (miscarriage rate is slightly higher than statistical norms for the United States but no environmental factors identified) Recommendations (Continue to watch miscarriage rate for 2 yrs to determine if miscarriage increase is just variation in a small population) Website has presentations, posters, and reports www.smdcen.us/health/ Alaska Dept of Public Health reviewed & validated the investigation/findings Bassett Army Community Hospital completed first 6 month review of rates (declined slightly) and beginning second 6 month review.

FY 2007

FGA Installation Restoration Program Website Restoration Advisory Board Website http://www.smdcen.us/rabfga/ Interactive Maps Administrative Record Historical Documents Current Documents for RAB/public or ADEC/EPA comments Site Fact Sheets Corrective Action Plan for South Tank Farm 2005 Fieldwork Report Link to Health Concerns Investigation webpage Calendar of Events RAB minutes, agenda, advertisements, presentations etc. New items marked with “– NEW”