PANDA Mechanical Design

Slides:



Advertisements
Similar presentations
Planar-GEM Trackers Bernd Voss Helmholtzzentrum für Schwerionenforschung GmbH (GSI)
Advertisements

Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
PANDA GSI 13.June 2006 TAG-PID Georg Schepers PANDA Technical Assessment Group PID Second Meeting: Separation Power and Detector Performance.
Presentation Prepared For:. Secure user Login provides access to specific ship-to addresses, customer catalog, order processing rules, and other account-based.
Simulation of a general purpose detector for the HESR project at GSI Darmstadt Conceptual Design Report: V.Hejny* for the.
The Lightweight Straw Tube Tracker for PANDA Detector at GSI Andrey Sokolov *,1, James Ritman 1, Peter Wintz 1, Paola Gianotti 2, Dario Orecchini 2 1 Institut.
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
EU midterm review, 8 th Dec Carsten Schwarz PANDA.
PANDA Collaboration Meeting Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting GSI
Concept of the PANDA Detector for pp&pA at GSI Physical motivation for hadron physics with pbars The antiproton facility Detector concept Selected simulation.
B. KetzerGEM-TPC GEM-TPC Meeting Bernhard Ketzer Technische Universität München 14 February 2008 Telephone Conference.
From Cave C to R3B: Time Schedule 2008 Experiments with upgraded setup: proton arm, Si detectors, QFS detection system 2009 Implementation of new readout.
Guenther Rosner DIRACmidterm, GSI Darmstadt, 8/12/06 1 Task 4  PANDA 3 Magnet design and integration of detectors Milestones Status Outlook.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
CBM Superconducting Dipole Magnet
J.M. Heuser — CBM Silicon Tracker 1 Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 15 October 2008 CBMCBM Review of the first in-beam.
Performance of the PANDA Barrel DIRC Prototype 1 GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt 2 Goethe-Universität Frankfurt Marko Zühlsdorf.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
PANDA collaboration meeting2.-4. June 2004 simulation statusOverview New Framework  why  status  schedule Simulation subdetector  Forward spectrometer.
Valery Dormenev Institute for Nuclear Problems, Minsk
Mapping separation power Klaus Götzen GSI Darmstadt PID TAG Meeting 15. Feb
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
PANDA GSI 13. December 2006 PID TAG Georg Schepers PANDA Technical Assessment Group PID Status Report G. Schepers for the PID TAG GSI PID TAG.
By : SAG3 Members.  Cross platform client interface for Time recording/capturing  MS Project integration to Time tracker  integration to Time.
James Ritman FZ Juelich EU Design Kick Off Meeting General Introduction: Physics/Design requirements Four Tasks A)Photon detection and readout for DIRC.
The Database & what’s next? Andrzej Soltan Institute for Nuclear Studies XXIX PANDA Collaboration Meeting Turin, 15th of June Arkadiusz Chlopik.
Scan ~100 bar entry positions with laser diode measures transmitted intensity (relative to reference intensity) determine attenuation length (Λ) by aiming.
Routing of Cables and Tubes at the Target Spectrometer PANDA Mechanics Workshop, April 2015 J. Lühning, GSI Routing at the barrel.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
PANDA Collaboration Meeting D. Rodríguez Piñeiro SciTil and Next Steps.
Magnetic Field Task Dietrich Liko. Overview A lot of progress in the last two weeks I try to summarize the status Discussion on additional.
Peculiarities of the PANDA experimental setup Overview of the PANDA detector Particle Tracking: PANDA MVD Particle Identification: PANDA DIRCs Particle.
Joint Institute for Nuclear Research Deformations and stresses in the flux return yoke A.Efremov, Yu.Lobanov, A.Makarov Darmstadt,
Joint Institute for Nuclear Research Status of the magnet for the PANDA Target Spectrometer Report from Dubna A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov,
Mitglied der Helmholtz-Gemeinschaft June 26th 2013XLV. PANDA Collaboration meeting1.
S TATUS OF B ARREL D IRC M ECHANICAL D ESIGN S TATUS OF B ARREL D IRC M ECHANICAL D ESIGN Doro Lehmann has started to update barrel DIRC in CATIA based.
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
Status of the PANDA Magnet Yoke Presented by E. Koshurnikov GSI, June 26, 2013.
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
1 GSI, Darmstadt Goethe Universität Frankfurt Ph.D Committee meeting 16 th of August 2011 Grzegorz Kalicy Development and Test of a Prototype for the PANDA.
1 Optical Properties of Cherenkov Radiators for the PANDA Barrel DIRC Roland Hohler, Klaus Peters, Georg Schepers, Carsten Schwarz, Jochen Schwiening GSI,
DIRCs for PANDA M. Hoek for the PANDA Cherenkov Group.
- “STRAW TRACKER AND CLASH ITEMS ANALYSIS. - “STRAW TRACKER AND STILL OPENED ITEMS ANALYSIS. - “STRAW TRACKER AND DANGEROUS ITEMS ANALYSIS. INFN-LNF -
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
PANDA Magnet Iron Yoke Strength Analysis
English for young physicists WS 09/10 Niklas Müller
Status of the forward tracker design
LINCS Tables List the parts Identify a reminding word
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
LBNF CAD models, Drawings and Component list
Target Spectrometer Updates CM-MEC Session Giessen, March 2015 J
PANDA Yoke of the Magnet
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
cooling and supports of the forward endcap EMC
David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin EMC BW Endcap.
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
IHEP group Shashlyk activity towards TDR
Status of the PANDA Magnet
Actual Dimensions in the Forward Spectrometer
EMC BWE PANDA Insertion
Software Development for the PANDA Barrel DIRC
a) Taken from New English File Intermediate pg. 84
Status of the PANDA Solenoid Magnet Production in BINP
as a prototype for Super c-tau factory
Pellet Target developments
PANDA Cryostat and Yoke
Presentation transcript:

PANDA Mechanical Design Bernd Lewandowski GSI Darmstadt Mechanical Design Subgroup GSI 06. 09. 2011 PANDA Mechanical Design

Agenda News about the PANDA hall The Forward GEM-Tracker Bernd Lewandowski The Forward GEM-Tracker Bernd Voss Dimensions of the DIRC Joachim Schwiening News of the Cryostat-Yoke and the Yoke-Platform Interface Inti Lehmann Update of the Cryostat Renzo Parodi News about the platform Edward Lisowski Ideas for the integration of the hypernuclear detector setup Alicia Sanchez The EMC Forward Endcap Herbert Löhner 06. 09. 2011 Bernd Lewandowski - GSI Darmstadt - PANDA Mechanical Design

News from the PANDA building Preparation of building plans for the building permission Checked by the radiation protection group Definition of different areas for conditions Beam-Off, Beam-On Radiation protection locks added Crosschecked by „Gebäude-Ansprech-Partner“ 06. 09. 2011 Bernd Lewandowski - GSI Darmstadt - PANDA Mechanical Design

Level E10 before Crosscheck 06. 09. 2011 Bernd Lewandowski - GSI Darmstadt - PANDA Mechanical Design

Level E10 – Beam-On 06. 09. 2011 Bernd Lewandowski - GSI Darmstadt - PANDA Mechanical Design

Level E10 – Beam-Off 06. 09. 2011 Bernd Lewandowski - GSI Darmstadt - PANDA Mechanical Design

Level E10 after Crosscheck 06. 09. 2011 Bernd Lewandowski - GSI Darmstadt - PANDA Mechanical Design

Level E10 – Beam-On 06. 09. 2011 Bernd Lewandowski - GSI Darmstadt - PANDA Mechanical Design

Level E10 – Beam-Off 06. 09. 2011 Bernd Lewandowski - GSI Darmstadt - PANDA Mechanical Design

PANDA building in 3D 06. 09. 2011 Bernd Lewandowski - GSI Darmstadt - PANDA Mechanical Design

3D pdf file The 3D pdf file of the PANDA hall including the HESR will be available at the PANDA website http://www-panda.gsi.de  Detector  Pictures 06. 09. 2011 Bernd Lewandowski - GSI Darmstadt - PANDA Mechanical Design

A short reminder … 06. 09. 2011 Bernd Lewandowski - GSI Darmstadt - PANDA Mechanical Design

Thank You! 06. 09. 2011 Bernd Lewandowski - GSI Darmstadt - PANDA Mechanical Design