LINAC AG • IAP • Goethe Universität Frankfurt

Slides:



Advertisements
Similar presentations
Institut für Angewandte Physik LINAC AG H. Podlech 1 MYRRHA Injector Design and Related R&D 2 nd Open Collaboration Meeting on Superconducting Linacs for.
Advertisements

Institut für Angewandte Physik LINAC AG Max school, October 2nd Florian Dziuba Status of the sc cw LINAC Demonstrator Florian Dziuba Institut für.
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
 Outline: ◦ 325 MHz Superconducting Spoke Resonators in the Project X Linac (HINS front end). ◦ SSR1 Single Spoke Resonator with β g =.21: Fabrication.
325 MHz RF Cave and SC Spoke Cavity Tests Robyn Madrak – Accelerator Physics Center (APC) for the HINS/Project X Group.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
SPX - Cavity WBS U , U , U Genfa Wu SRF Scientist Accelerator Systems Division/RF Group DOE Lehman CD-2 Review of APS-Upgrade.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Page 1 Jean Delayen HyeKyoung Park Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
The design of elliptical cavities Gabriele Costanza.
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
1 Spoke cavities for ESS and MYRRHA G. Olry, P. Duchesne (IPN Orsay) SLHiPP-2, 3-4 May 2012, Catania.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
I. Ben-Zvi Update Ilan Ben-Zvi for the Stony Brook, BNL and AES SPL teams Presented by Rama Calaga.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Group 6 / A RF Test and Properties of a Superconducting Cavity Mattia Checchin, Fabien Eozénou, Teresa Martinez de Alvaro, Szabina Mikulás, Jens Steckert.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
56 MHz SRF Cavity and Helium vessel Design
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Institut für Angewandte Physik LINAC AG H. Podlech 1 Injector Development for MYRRHA 3 nd Open Collaboration Meeting on Superconducting Linacs for High.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
Slide 1 of 10Matthew Fraser – CI MEW Meeting, 25 th October 2010.
THE MAFF IH-RFQ TEST STAND AT THE IAP FRANKFURT A. Bechtold, J. Fischbach, D. Habs, O. Kester, M. Pasini, U. Ratzinger, J. Rehberg, M. Reichwein, A. Schempp,
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Page 1 Jean Delayen Center for Accelerator Science Old Dominion University RF Dipole Cavity Design and Plans LARP Review Fermilab, 10 June 2013.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
ESS RFQ B. POTTIN and RFQ team CEA-IRFU. RFQ design Strategy 3 RF codes to validate calculations Consideration of machining and assembly possibilities.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
INTRODUCTION The Fermilab High Intensity Neutrino Source (HINS) program has been developing 325 MHz superconducting spoke resonator accelerating cavities.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Welcome to the RFQ Meeting
SC Activities at IAP Frankfurt
T5.2: Harmonization - Material and Component Reference
Technical Issues Facing in the FRIB Cryomodule
Odu/slac rf-dipole prototype
WG-1 Session Cavity Performance Cryomodule Performance
Design Fabrication and Processing Group H. Padamsee
Physics design on Injector-1 RFQ
SC spoke cavity for China-ADS 3~10MeV injector
HWR Cavities for China ADS
Challenges and Perspectives of Accelerator Driven Systems (ADS)
SNS Fundamental Power Coupler History
Wolfgang Anders, BESSY, Berlin
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
HIE-LINAC status report
ADS Accelerator Program in China
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
DESIGN OF THE HWR CAVITIES FOR SARAF
Challenges, Progress and Plans of SRF CH-Structures
Presentation transcript:

LINAC AG • IAP • Goethe Universität Frankfurt Development of Power Couplers for Superconducting Cavities and Setup of a Test Stand Development of capacitively acting power couplers for superconducting CH-cavities Frequencies: 217 MHz and 325 MHz RF power: 10-50 kW Duty factor: 1%-100% Electromagnetic simulations Thermal simulations for cooling optimization Setup of a coupler test stand Profiting projects: cw-Linac, HE-Linac-2 Theorie: Simulationen: Experimentell: H. Podlech, IAP

Superconducting CH-Cavity Development for the cw-Linac LINAC AG • IAP • Goethe Universität Frankfurt Superconducting CH-Cavity Development for the cw-Linac Development of 9 superconducting CH-cavities for the cw-Linac RF simulations to optimize geometry Structural mechanics simulations to predict microphonics, pressure sensitivity, MP, Lorentz-Force Detuning, material stress, cool down behaviour Profiting projects: cw-Linac Helium vessel Coupler flange Pickup flange Inclined end stem Tuner flange Preparation flange Theorie: Simulationen: Experimentell: H. Podlech, IAP

Investigation of Multipacting in Superconducting CH-Cavities LINAC AG • IAP • Goethe Universität Frankfurt Investigation of Multipacting in Superconducting CH-Cavities Capacitively acting bellow tuners are used for frequency tuning Danger of Multipacting within the tuner Prediction of MP depending on tuner geometry Validation with test resonator Profiting projects: cw-linac, HE-Linac-2, MYRRHA Theorie: Simulationen: Experimentell: H. Podlech, IAP

Investigation of BCP on the Frequency in Superconducting CH-Cavities LINAC AG • IAP • Goethe Universität Frankfurt Investigation of BCP on the Frequency in Superconducting CH-Cavities Buffered Chemical Polishing (BCP) is required to guarantee high performance of sc cavities Typically 100 mm of inner surface is removed Frequency shift still not known, difficult to simulate because of inhomogeneous removal Construction of a short CH-cavity with several massive BCP to study this effect Profiting projects: cw-linac, HE-linac2, MYRRHA Theorie: Simulationen: Experimentell: H. Podlech, IAP

LINAC AG • IAP • Goethe Universität Frankfurt Optimization of the Geometry of Superconducting CH-Cavities Cost, Construction Time, Fabrication Inaccuracies CH-Cavities are very complex sc RF Structures Expensive and long construction time Optimization of geometry without loosing performance Construction and test of a prototype cavity Profiting projects: cw-linac, HE-linac2, MYRRHA Theorie: Simulationen: Experimentell: H. Podlech, IAP

Development of cw rt operated CH-Cavities LINAC AG • IAP • Goethe Universität Frankfurt Development of cw rt operated CH-Cavities Room temperature CH-Cavities are promising RF structures for low and medium energy beams Suitable for cw operation because of excellent cooling capabilities Development of CH-cavities with thermal load exceeding 50 kW/m Optimization of cooling Investigation of thermal effects Profiting projects: cw-linac, FRANZ, MYRRHA Theorie: Simulationen: Experimentell: H. Podlech, IAP

LINAC AG • IAP • Goethe Universität Frankfurt Investigations on Different Surface Preparations and their Influence on the Maximum Achievable Fields in rt CH-type Cavities Different surface preparation methods will be compared with respect to the maximum fields in rt CH-type cavities at low duty cycle Copper surface without copper plating, no preparation High pressure rinsing (HPR) Buffered Chemical Polishing and HPR Copper plating Development and test of a 325 MHz cavity with minimum electric peak fields Profiting projects: HE-Linac-2 Theorie: Simulationen: Experimentell: H. Podlech, IAP

Beam Dynamics Simulations of the sc cw Linac LINAC AG • IAP • Goethe Universität Frankfurt Beam Dynamics Simulations of the sc cw Linac The cw linac is based on sc CH-cavities at 217 MHz Beam Dynamics is based on EQUUS-concept Optimization of the linac lattice: beam quality, energy variability, number of cavities, cavity parameter Profiting projects: cw-linac Theorie: Simulationen: Experimentell: H. Podlech, IAP

Developments on cw operated RFQs LINAC AG • IAP • Goethe Universität Frankfurt Developments on cw operated RFQs Present limit of thermal load in 4-Rod RFQs is about 50 kW/m High thermal load can have an influence on the geometry with negative impact on beam dynamics Optimization of cooling with new technologies Development of high power prototypes with tests Profiting projects: cw-linac, FRANZ, MYRRHA Theorie: Simulationen: Experimentell: H. Podlech, IAP

RFQ Development for the FAIR p-Linac LINAC AG • IAP • Goethe Universität Frankfurt RFQ Development for the FAIR p-Linac FAIR p-Linac requires a 325 MHz 3 MeV RFQ Presently no decision on RF structure Different options are under investigation Main emphasis on: RF parameters, capital costs, technical risk Development and tests of prototypes Profiting projects: FAIR p-linac Theorie: Simulationen: Experimentell: H. Podlech, IAP