Generation Adequacy Task Force Update to WMS

Slides:



Advertisements
Similar presentations
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Advertisements

1 Generation Adequacy Task Force Report to TAC April 7, 2005.
06/04/2009 TAC 2009 Long-term Demand and Energy Forecast (LTDEF) and Capacity, Demand and Reserves (CDR) Calculation Dan Woodfin Director, System Planning.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting November 6, 2007.
NERC LTRA Update / CDR Capacity Counting Issues
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
ERCOT Planning October 2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System - Methodology.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Generation Adequacy Task Force Update to WMS November 18, 2009.
1 RMS TAC Update April 3, Test Plan Flight Dates It is the practice of RMS to approved the dates for future testing flights. This enables new.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
1 Project Update and Summary of Project Priority List (PPL) Activity April 16, 2015.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
1 TAC Report to the ERCOT Board February 16, 2005.
Summary of Astrapé Reserve Margin Impact Analysis for the PUCT Pete Warnken WMS February 4, 2015.
1 IFAD consideration of a Code of Conduct for Executive Board Representatives Historical Background Presentation to an Informal Seminar of the Executive.
1 WMS Report TO TAC April 2007 (which is in March)
1 RTWG Report to TAC June 4, 2009 Henry Durrwachter.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
Lead from the front Texas Nodal 1 EDS Market Call Weekly Update Jan 30, 2009.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting March 11, 2008.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting December 3, 2007.
LOLEv Methodology Details GATF April 5, Calculation of the Target Reserve Margin in the LOLEv study The reserve margin is calculated by the following.
Kenan Ögelman & Randa Stephenson TAC Leadership Retreat TAC Meeting September 5, 2013.
Generation Adequacy Task Force Meeting April 10, 2014.
1 R Workshop on 2016 RA proposals Energy Division Staff Procurement Oversight and Resource Adequacy California Public Utilities Commission Thursday,
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
Draft NPRR Weather Sensitive ERS Loads December 2012.
GATF Loss of Load Process (or How to Make Sausage) October, 2012.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
1 Commercial Operations Working Group Update to TAC April 7, 2005.
Energy: Challenges with Becoming More Sustainable © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. Robb Anderson Director.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
NSRS in Nodal Proposal for Deployment & Recall Procedures ERCOT ROS 10/12-13/2006 By: S.Niemeyer R.Jones R.Wheeler B.Green J.Dumas P.Breitzman.
COMET Working Group Progress Report 11/13/03
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Commercial Operations Sub-Committee Update to RMS
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Protocol Revision Subcommittee
2017 Llano Estacado Regional Water Plan Planning Group Meeting
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
2011 Prioritization Update to Market Subcommittees
Interpreting DREAM NPRR 777.
Project Update and Summary of Project Priority List (PPL) Activity
Recommendation of Texas Test Plan Team to RMS
Commercial Operations Sub-Committee Update to TAC
OFFICE OF THE CITY CLERK SEPTEMBER 22, 2014 CITY COUNCIL MEETING RESCIND RESOLUTION NO AND ADOPT A RESOLUTION ESTABLISHING THE RULES GOVERNING.
Technical Committee Meeting January 27, 2012
Capacity Analysis in the Sixth Plan
Planning Reserve Margin
Resource Adequacy Steering Committee Meeting October 4, 2011
Presentation transcript:

Generation Adequacy Task Force Update to WMS April 12, 2013

Update on Recent GATF Activities GATF Meetings Held on March 22nd and April 5th, 2013: Both meetings focused on an overview of the 2012 LOLP study results. Also discussed GATF deliverables and dates. The completed LOLP study report and a supporting document containing the LOLP’s Assumptions and Methodology can be found at the GATF meeting page of March 22, 2013. GATF (non-voting body) came to a consensus agreement on several items and began a deep dive of the CDR inputs at its April 5th meeting. Commission workshop on CDR inputs held on March 14, 2013

GATF and Market Participant Deliverables The following schedule was provided to the ERCOT Board of Directors by the ERCOT CEO at their March 19, 2013 Board meeting: Loss of Load Probability Study Study results will inform setting the Target Reserve Margin, to be discussed at: GATF on Jan 17 WMS on Feb 13 and Mar 13 PUCT on Mar 14 GATF on Mar 22 ROS on Apr 11 WMS on Apr 12 TAC on May 2 Board of Directors on May 14

GATF Discussion of Schedule Based on the preceding Board schedule, the GATF reviewed the following deliverables and associated timelines. Due to timing issues, the May 2013 CDR will use the existing methodology and CDR inputs approved in NPRR489, Planning Reserve Margin (13.75% target reserve margin, 8.7% ELCC of wind). The GATF will have a new target reserve margin and ELCC of wind recommendation ready by the April WMS meeting (done). WMS will vote on the recommendation and have it ready for the May TAC meeting. (TBD today) TAC will vote and send a recommendation to the Board’s May meeting. A draft NPRR with any suggested modifications to the CDR inputs will be ready for WMS in May.

GATF Consensus Recommendation #1 At the April 5th meeting, the GATF developed the following recommendation: “The GATF reviewed the 2012 LOLP study results in detail at its March 22nd and April 5th, 2013 meeting. The GATF members reached a consensus opinion that the LOLP study results are reasonable. GATF recommends using the LOLP results for the 2014 study year, resulting in a 16.1% planning reserve margin and an ELCC of non-coastal Texas wind of 14.2% and coastal wind of 32.9%. GATF also points out the recommendation is not based on any type of economic analyses, but rather on the loss-of-load probability methodology that has been used historically. This recommendation is not intended to establish the value of any resource type in any future market structure.”

GATF Consensus Recommendation #2 The GATF suggests the “green curve” from ERCOT’s earlier presentation, which shows a loss-of-load expectation ignoring the effects of 2011, be excluded from further consideration.

Commission Workshop On March 14th, the Commission conducted a workshop in Project 41060, Proceeding to Examine the Inputs Included in the ERCOT Capacity, Demand and Reserves Report. An overview of the current CDR input assumptions was provided. No changes were recommended, but Comm. Anderson hinted he may file a memo concerning the CDR prior to the next open meeting.

CDR Inputs Being Reviewed CDR assumptions discussed so far by GATF; to be continued at next meeting - not yet consensus items: Escalate ERS based on previous 3 years average growth instead of escalating 10% per year. Hydro Unit Capacity – The average hydro unit capacity available, as determined from the COP, during the highest 20 peak load hours for each preceding 3 year period Solar Unit Capacity – 100% of the nameplate capacity for operational solar units until a threshold value of 200 MWs of installed solar capacity is reached. DC tie Capacity – language similar to hydro information, i.e., the average capacity available from the DC ties during the highest 20 peak load hours for each preceding 3 year period. Mothball capacity – still discussing, but may change to 100% of a unit’s capacity if return probability is greater than or equal to 50%; show zero capacity if probability is less than 50%. New units: maintain existing SGIA and TCEQ air permit requirement, but add a new requirement to have a federal Greenhouse Gas permit before including in the CDR. If a new unit developer has met all of these requirements, language should also be added that allows ERCOT to remove a unit from the CDR if they have received documentation from the developer the new unit will not be proceeding with construction.

Summary – Next Steps? All market participants should understand the May 2013 CDR will utilize the existing reserve margin of 13.75% and ELCC of wind of 8.7%. To have a recommendation on the planning reserve margin to the Board by May, WMS will need to have a recommendation to TAC voted on today. GATF recommended a 16.1% planning reserve margin and an ELCC of non-coastal Texas wind of 14.2% and coastal wind of 32.9%. WMS vote?

Summary – Next Steps? WMS recommendation on the 2nd GATF consensus item? “…the “green curve” be excluded from further consideration.”

Summary – Next Steps? ELCC is tied to the LOLE Results

Questions/Comments???