Interaction Region Alternative Layouts

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

A. Hervé - 13 august 2007 ILC-IRENG Meeting of Working Group A: 13 Aug 07 Proposal for an Experimental Area With only One Large Shaft A. Hervé/CERN.
CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Construction and Installation of the CLIC Experimental Area
19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC.
ILC CFS / CLIC CES Studies for the Interaction Region : - An action was given at the Geneva Linear Collider Meeting for CFS to develop a more in-depth.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
1 J.Osborne (CERN)
CLIC Experimental Area Layout Design Considerations & ARUP Study A. Gaddi, H. Gerwig, M. Herdzina, H. Hervé, N. Siegrist, F. D. Ramos.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
Transport & Handling of Detectors TAN Workshop S. Prodon –
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
FHI 32: FCC tunnel layout and transferline update Tuesday, 9 February 2016 CE Updates: Comparison of 100km Intersecting and Non-Intersecting options New.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
FCC-hh MDI 5 th Meeting Friday 13 th March 2015 Civil Engineering Layouts for Experimental Caverns – First Draft Charlie Cook (GS), John Osborne (GS)
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
CES Studies at CERN for the Interaction Region : -Summary of Linear Collider IR meeting at CERN held on 16 February Design Brief for external design.
Sale of material salvaged from the LEP experiments 4 large experiments ALEPH DELPHI L3 OPAL The 4 detectors are situated in caverns (100 m under ground.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
1 Building Design Progress Dan Wilcox March 2012.
Philip Burrows SiD Monthly Phone Meeting, 4/10/071 IR Issues from IRENG07 Philip Burrows John Adams Institute Oxford University.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Experimental Hall in Mountain Regions
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
CLIC Civil Engineering Update
Updated Design of Detector Hall
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
Marco Oriunno (SLAC), March 12, 2014 MDI WG
CLIC Civil Engineering & Infrastructure
Experimental hall design in Japanese site
$150K Chicago/ANL seed funding for Braidwood site investigation
Tunnel Cross Section Studies
CLIC / ILC Collaboration for CFS works
FCC Civil Engineering update
Latest ILC tunnel cross section May 2017
CRANES By griffin.
FCC-ee MDI Civil Engineering update
Hybrid Access Optional Study
Detector hall in mountain regions
CLIC Civil Engineering Update
ILC CFS AD&I Daresbury Lab Summary
Detector hall in mountain regions
Extract from today’s talk given to DCB
RDR Baseline Layouts for Interaction Region
Presentation transcript:

Interaction Region Alternative Layouts J.Osborne CERN – 21 August 2007

RDR Baseline Layouts for Interaction Region J.Osborne CERN – 21 August 2007

Why Single Shaft Alternative: Cost savings for civil engineering (approx. $10million) Can simultaneously perform lowering in shaft and normal work in Experimental Cavern J.Osborne CERN – 21 August 2007

General view of Proposed One Shaft Option . Secondary9 m shaft Main service cavern machine & Exp B B Main 18 m shaft A Second service cavern Exp A J.Osborne CERN – 21 August 2007

Main ventilation ducts And services Exp A 18 m Lift Stair 80-t crane Exp A & B 9 m Lift Stair 20-t crane Machine & Exp B J.Osborne CERN – 21 August 2007

. Access 20-t loads Exp B Main service cavern machine & Exp B Access Heavy Loads 80-t loads Exp A & B Pressurized Egress tunnels Second service cavern Exp A J.Osborne CERN – 21 August 2007

Movements of Experiment A 1: to main unloading zone 2: to garage position and leave space for experiment B in unloading zone 3: beam/garage position Exp B 1 2 3 A J.Osborne CERN – 21 August 2007

Surface Area for One Shaft Option 2 80-ton cranes 19 m crane hook A 1 80-ton cranes 12 m crane hook Trucks B J.Osborne CERN – 21 August 2007

Disadvantages of single shaft Option : Detector B is in a less favorable position If Detector B needs ‘major’ repairs, neither detector could be on-line (eg magnet removal) Lifts & staircase have to be included in experimental shaft If delays incurred both TBM’s could arrive at experimental cavern at the same time, more flexibility with 2 shafts for finishing works/fitting out J.Osborne CERN – 21 August 2007

Beam tunnel TBM’s extracted from Experimental Cavern Service Tunnel TBM TBM finished=4.5m MS TBM =4.5m Cavern finishing Shaft/cavern excavation TBM setup TBM transport TBM removal Finishing work Beam tunnel TBM’s extracted from Experimental Cavern J.Osborne CERN – 21 August 2007

General view of Proposed Off-set Two Shaft Option 9m shaft for machine Two shafts with lift/stairs services 80-t crane General view of Proposed Off-set Two Shaft Option J.Osborne CERN – 21 August 2007

Two side caverns have tendency to act as a single span – intermediate pillar may be needed in certain areas, depending on ground conditions J.Osborne CERN – 21 August 2007

Surface area would be a variation of what has been looked at with less distance between the shafts J.Osborne CERN – 21 August 2007

Is the RDR cavern width enough ? RDR Baseline Layouts for Interaction Region J.Osborne CERN – 21 August 2007

GLDc in beam position V1 20ton gantry crane J.Osborne CERN – 21 August 2007