QCL configurations in above 6GHz and the necessary RS QCL linkeages

Slides:



Advertisements
Similar presentations
Goal: I can infer how the change in parameters transforms the graph. (F-BF.3) Unit 7 Quadratics Translating Graphs.
Advertisements

WF on design of physical downlink control channel for MTC CATT, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, ETRI, InterDigital, MediaTek, NTT.
LTE-A Carrier Aggregation
C80216m-08_302 ProjectIEEE Broadband Wireless Access Working Group TitleLayer Mapping for Downlink Single-User MIMO in IEEE.
Multi-beam Patch Antenna Design Mustafa Konca Supervisor: Prof. Dr. Sener Uysal.
Radio Astronomy and SETI
Doc.: IEEE /0402r2 Submission May 2012 Haiming Wang, Xiaoming PengSlide 1 Date: Authors: Overview of CWPAN SG5 QLINKPAN.
1 PROPAGATION ASPECTS FOR SMART ANTENNAS IN WIRELESS SYSTEMS JACK H. WINTERS AT&T Labs - Research Red Bank, NJ July 17,
LTE Measurement Monitor and Trace (MMT) Application.
WF on UE capability signaling for FD-MIMO Class B LG Electronics, Intel Coorporation, NTT DOCOMO, Qualcomm 3GPP TSG RAN WG1 Meeting #84 R St Julian’s,
Vertical/Horizontal MIMO
InterDigital, Inc. Submission doc.: IEEE /0911r1 July 2016 Link Level Performance Comparisons of Open Loop, Closed Loop and Antenna Selection.
Doc.: IEEE /1209r0 Submission Hotel lobby SU-MIMO channel modeling: 2x2 golden set generation Date: September 2016 Alexander Maltsev,
Technology training (Session 4)
Technology training (Session 6)
MCA ECC PT1 Meeting
Overview of open issues in
Offline discussion on remaining details on RRM measurements
WF on Bandwidth Part for DL common channel
Mobile Radio Propagation - Small-Scale Fading and Multipath
3GPP TSG-RAN WG4 Meeting NR#3 Nagoya, Japan, 18 – 21 Sep, 2017
Summary on Beam Recovery Mechanism
Way Forward on UE measurement definition and capability
Offline Discussion on remaining details about RACH Procedure
助理教授:吳俊興 助教:許力中 國立高雄大學 資訊工程學系
Classical blocking test (e.g. EN )
Simulation based verification: coverage
Proposals on remaining issues on PDCCH structure
Summary of offline discussion for PDCCH structure
GI Overhead/Performance Impact on Open-Loop SU-MIMO
Proposals on remaining issues on search space
WF on Beam Indication for Beam Management
3GPP TSG RAN WG1 Meeting #90bis
Summary on Beam Recovery Mechanism
R : SRS Enhancements for LTE-A
WF on Beam failure recovery
R : Uplink Reference Signal Planning Aspects Agenda Item: 6.6.2
Samsung, KT Corp., NTT DOCOMO, Verizon, [ZTE], [CATT], [Intel]
WF on beam reporting CATT, Intel R1-17xxxxx
WF on Beam-Related Indication
WF on CSI timing offset for PUSCH
Monday Tuesday Wednesday Thursday Friday
Monday Tuesday Wednesday Thursday Friday
LTE-A Relays and Repeaters
Shanghai, China, April 11-15, 2011 Source: Qualcomm Incorporated
WF on Radio Link Monitoring in NR
Summary on CA Aspects Samsung 3GPP TSG RAN WG1#91
Introduction to Key LTE TDD Features: Beamforming
Summary of Offline Discussion on RMSI CORESET Configuration (Part 2)
Summary on CA Aspects Samsung 3GPP TSG RAN WG1#91
WF on CB-group based retransmission
Maximum Tone Grouping Size for ax Feedback
'. \s\s I. '.. '... · \ \ \,, I.
Test strategy towards Massive MIMO Using LTE-Advanced Pro eFD-MIMO
Radio Network Parameters (LTE, NR)
Maximum Tone Grouping Size for ax Feedback
Preamble design aspects for MU-MIMO support
Large-Scale Characteristics of 45 GHz Based on Channel Measurement
Month Year doc.: IEEE yy/xxxxr0 September 2010
Maximum Tone Grouping Size for ax Feedback
doc.: IEEE <doc#>
' '· \ ·' ,,,,
Large-Scale Characteristics of 45 GHz Based on Channel Measurement
Overview of CWPAN SG5 QLINKPAN
ECE 5233 Satellite Communications
Optimal Combining of STBC and Spatial Multiplexing for MIMO-OFDM
ECE 5233 Satellite Communications
教育部補助「行動寬頻尖端技術跨校教學聯盟第二期計畫 -- 行動寬頻網路與應用 -- 小細胞基站聯盟中心」 課程模組: 「LTE-Small Cell 核心網路架構及服務」 單元-A2:LTE-Small Cell的調變技術 計畫主持人:許蒼嶺 (國立中山大學 電機工程學系) 授課教師:萬欽德 (國立高雄第一科技大學.
Cellular Networks and Mobile Computing COMS , Spring 2012
Presentation transcript:

QCL configurations in above 6GHz and the necessary RS QCL linkeages 1, 2, 5* 1, 2, 3, 4, 5 Example Config #1 5* - depends on higher layer configuration of CSI-RS resource SS block CSI-RS BM PDCCH DMRS 1, 2, 5 Example Config #2 1, 2, [3, 4], 5 SS block PDCCH DMRS Signalling: RS resource sets and resources configured using RRC QCL parameter(s) between source RS resource (within a set) and target RS resource (within a set) using RRC Needs to include 2 port case 1, 2, 5* Example Config #3 1, 2, 3, 4, 5 SS block CSI-RS BM PDSCH DMRS TCI states 1, 2 may be more general case covering also wide SSB beam and narrow CSI-RS beam Example Config #4 1, 2, 5 1, 2, 3, 4, 5 SS block CSI-RS CSI PDSCH DMRS When SSB has same beamwidth as CSI-RS beam A B B is QCLed to A (configuration in RRC) CSI reporting (with CQI) By DL grant (with MCS) Used QCL association for DMRS defined in CORESET and Search Space configuration that indicates the UE when to assume which QCL association between certain RS and DMRS of PDCCH (RRC/MAC-CE) Example Config #5 1, 2, 3, 4, 5 SS block [1, 2] CSI-RS CSI PDSCH DMRS 5 When SSB has wider beamwidth as CSI-RS beam RRC/MAC-CE configures/updates UE with TCI states table where each TCI state indicates QCL association between certain RS and DMRS of PDSCH. DCI indicates UE which TCI state to use for PDSCH demodulation. CSI-RS BM (1) average delay, (2) Doppler shift, (3) delay spread, (4) Doppler spread, (5) spatial RX parameter(s), (6) average gain