Settlements Analysis due to SFT Deration Issue

Slides:



Advertisements
Similar presentations
CRR Shortfall – Revenue Equalization Part 2 (Continuation from 2/21/08 TPTF discussion) Bill Barnes TPTF 3/5/2008.
Advertisements

CRR Update to CMWG Matt Mereness Manager, DAM and CRR Auction Congestion Management Working Group June 5, 2013.
NPRR Proposed Changes TPTF Meeting 26 Aug 2008.
1 NPRR638 Back-casting Updated Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 01, 2015.
Draft Dispute NPRR and NPRR 75 A comparison for COPS.
Texas Nodal 1 Texas Nodal Settlements Mini-Market - CRR July 31, 2007.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
01/21/2008 Nodal COMS Extracts & Reports Market Requirements Review SDAWG Jackie Ashbaugh ERCOT ***NOTE: All information contained in this presentation.
Commodities Futures Trading Commission (CFTC) Exemption Proposals for Settlements and Billing Changes COPS June 14, 2011 Cheryl Yager, Mandy Bauld, Leslie.
7/15/2013 CSWG CSWG – ERCOT Update ERCOT Matthew Tozer.
1 COMS/Settlements/Credit Weekly Update June 11, 2010.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
1 COMS/Settlements/Credit Weekly Update May 21, 2010.
1Texas Nodal Texas Nodal Commercial Systems COMS CSD Presentation By ERCOT Wednesday, 1/10/2007.
Texas Nodal Section 9: Invoicing ERCOT, Settlements & Billing SDAWG - August 2007.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Commercial Operations Subcommittee (COPS) January 2014 Update to TAC 1/29/2015.
Nodal Settlement Delta Calculations and Statements – 7/11/06 Workshop  Objective: Describe design concepts of nodal settlement delta calculations and.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
10/11/2011 COPS Schedule for Upcoming Resettlements ERCOT Mandy Bauld.
1 COMS/Settlements/Credit Weekly Update July 2, 2010.
Matt Tozer ERCOT Manager, Settlements & Billing 9/4/2013 ERCOT Update Management of the Balancing Account CMWG.
CRR Shortfall – Revenue Equalization Part 3 (Continuation from 3/5/08 TPTF discussion) Bill Barnes/Sharon Wang TPTF 3/21/2008.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) October 2015 Update to COPS.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
Nodal Short Pay and Uplift Process CWG Meeting May 28, 2008.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
ERCOT Clarification for PCRR Allocation Terms and Conditions Should this sentence be included under Refund option [Section 7.4.2(c)(i)] Before the applicable.
ERCOT Market Credit Working Group Presentation to the Finance and Audit Committee Payment Short Pay/Default and Uplift for Congestion Revenue rights (CRRs)
Small Resettlements A Proposal to Reduce Impact on ERCOT and Market Participants.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Dispute Management System Business Requirements ERCOT.
Shortened RTM Settlement Timeline (NPRR509) Transition Plan - Phase 2 Matt Tozer / Ohlen Genove CSWG July 15, 2013.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
TAC 2012 Meetings Update (March & April) to Commercial Operations Subcommittee Harika Basaran 5/8/2012.
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
March 22, 2011 ERCOT Board of Directors Commercial Market Operations Version 2 - Updated on March 18, 2011 Betty Day.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department September 28, 2006.
Nodal Settlement Status and Observations Jim Galvin, SEWG Chair.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
CSWG Update Blake Holt ERCOT CSWG 10/20/ Thanksgiving Settlement Schedule 12/01/2014 (M) 12/02/2014 (T) 12/03/2014 (W) 12/04/2014 (Th) 12/05/2014.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
1 NPRR638 Back-casting Updated and Supplementary Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 20, 2015.
Nodal Settlement Delta Calculations and Statements  Objective: Describe the recommended design of nodal settlement delta calculations and statements.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
1 Market Trials Update NATF January 5, 2010.
Market Continuity WMS June 8, PUBLIC What is Market Continuity? The processes by which ERCOT market-related systems and activities are returned.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Statements and Calendar Business Requirements Settlements.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Real Time Revenue Neutrality CSWG 2/27/2012 Jim Galvin.
CRR Deration and NPRR821 WMS 09/06/2017.
Market Trials Update NATF March 2,
Credit Reports Vanessa Spells COPS Meeting ERCOT Public
Nodal Program Update to Cops
LCRA Comments regarding NPRR 821
Market Continuity Update to TAC Joel Mickey
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
John Dumas Director, Wholesale Market Operations
Ancillary Service Trades and Ancillary Service Settlement
Settlement Update Austin Rosel ERCOT October 11, 2017.
COMS/Settlements/Credit
Presentation transcript:

Settlements Analysis due to SFT Deration Issue Matt Tozer / Pam Shaw CSWG July 2013

Issue Overview A defect was introduced into the Day Ahead Market Simultaneous Feasibility Test (SFT) process with NPRR 322 (Real-Time PTP Option Modeling) Issue was in ERCOT systems from OD 2-14-2013 through 6-13-2013 Impact to Settlements from defect was the CRR SFT Violated Constraint bill determinant (CRRSFTVIOL) was not created for all violated constraints or had the incorrect value CRRSFTVIOL is used to calculate the Deration Factor (DRF) which is used in the calculation of the CRR Derated Amount CRRs can be “derated” when certain paths are oversold in the CRR Auction Only CRRs that have a source and/or sink at a Resource Node Settlement Point can be derated Issue was uncovered by ERCOT staff when investigating the May 2013 CRR Short Fall

Issue Impact A portion of CRRs that had a source or sink at a resource node were not derated and should have been i.e. Certain CRRs were overvalued in DAM settlements Also, for most operating days, Shortfall Charges to CRR Owners were higher than they should have been and Balancing Account Deposits were lower than they should have been Shortfall Charges are incurred when there is not enough Congestion Rent collected in an hour to cover CRR payments End of month impact resulted in: lower than appropriate monthly refund to short paid CRR Owners For months where short paid CRR owners were not fully funded (for example, April and May) or lower than appropriate credits to QSEs with Load For months where short paid CRR owners were fully funded (for example, February, March and June)

Results of the Analysis – Resettlement Days Per Nodal Protocol Section 9.2.5, DAM Resettlement Statement ERCOT shall issue a DAM Resettlement Statement for a given DAM due to error in data other than prices when the total of all errors in data other than prices results in an impact greater than 2% of the total payments due to ERCOT for the DAM, excluding bilateral transactions. Analysis Determined that 14 Operating Days met the 2% threshold Settlements Calendar Extract has been updated with the resettlement schedule Operating Days Requiring DAM Resettlement 4/4/2013 4/30/2013 5/6/2013 5/9/2013 5/10/2013 5/12/2013 5/16/2013 5/17/2013 5/18/2013 5/19/2013 5/20/2013 5/21/2013 5/22/2013 6/5/2013

Results of the Analysis – Data Impacts CRRSFTVIOL Bill Determinants that were missing or had incorrect values will be imported into Lodestar for all affected Operating Days. Data for Operating Days that met the 2% threshold will be loaded first If Operating Days other than those that met the 2% threshold are subsequently resettled, the corrected data will be used in settlements The new data will be available in SID and RTM MODE Settlement Extracts

Results of the Analysis – Dollar Impact Below are the dollar impacts if 2% Days are Resettled

Results of the Analysis – Dollar Impact Below are the dollar impacts if all Days are Resettled

Results of the Analysis – Dollar Impact Below is the difference between Resettling all days versus just 2% days

Questions? Any Remaining Questions?