Archive, Data Products, & Operations for the Murchison Widefield Array

Slides:



Advertisements
Similar presentations
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Advertisements

Automated Software Testing: Test Execution and Review Amritha Muralidharan (axm16u)
OVSA Expansion Software Overview Gordon Hurford Kickoff Meeting NJIT 25-Oct-2010.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
CSV Plan status Robert Laing ESO Science IPT. 2 Recent changes Complete rewrite to take account of rebaselining and revised delivery schedule Proposal.
HAWCPol / SuperHAWC Software & Operations J. Dotson July 28, 2007.
DCS Architecture Bob Krzaczek. Key Design Requirement Distilled from the DCS Mission statement and the results of the Conceptual Design Review (June 1999):
1 Simulation Modeling and Analysis Verification and Validation.
MWA Project:. Site: Murchison Radio Observatory Australia’s proposed SKA Site Strategy: 512 Antenna “Tiles” Explore “Large N / Small D” regime Correlate.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
CPIS 357 Software Quality & Testing
Software System Engineering: A tutorial
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Software Engineering Management Lecture 1 The Software Process.
The Murchison Wide Field Array Murchison, ~300 km from Geraldton.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Focus on 128T Steven Tingay. Where are we? Prior to NSF proposal review, I prepared a contingency plan in Australia - use Australian-only (and Indian,
MWA Data Capture and Archiving Dave Pallot MWA Conference Melbourne Australia 7 th December 2011.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
Project Manager Reports Ron Remillard (MIT) & Tom Booler (Curtin, Aurecon) MWA Project Meeting December 5, 2011.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
Systems Life Cycle A2 Module Heathcote Ch.38.
06/30/ Data Product Service (DPS) Packaging and Context Dan Crichton Steve Hughes Ron Joyner Chris Mattman Paul Ramirez Peter Shames.
THE MURCHISON WIDEFIELD ARRAY: FROM COMMISSIONING TO OBSERVING D. Oberoi 1,2, I. H. Cairns 3, L. D. Matthews 2 and L. Benkevitch 2 on behalf of the MWA.
Fundamental limits of radio interferometers: Source parameter estimation Cathryn Trott Randall Wayth Steven Tingay Curtin University International Centre.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
Murchison Widefield Array (MWA) : Design and Status Divya Oberoi, Lenoid Benkevitch MIT Haystack Observatory doberoi, On behalf.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Observations, Database, and Pipeline for EoR Jacqueline N. Hewitt MIT Kavli Institute for Astrophysics and Space Research Text.
SKA: Configurations and Simulations Ramesh Bhat Colin Lonsdale Roger Cappallo Shep Doeleman Divya Oberoi Joanne Attridge MIT Haystack Observatory.
Page 1 PACS GRITS 17 June 2011 Herschel Data Analysis Guerilla Style: Keeping flexibility in a system with long development cycles Bernhard Schulz NASA.
1 Pioneer Investments Legal and Compliance System Assessment Weekly Status Update June 23, 2005.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Cornell Information Technologies Information Systems/Data Delivery ACTUATE RETIREMENT PROJECT ASPC UPDATE 12/7/06 Objectives Primary - Retire Actuate Reduce.
Engineering Commissioning May 2016 SKA1 LOW – Assembly, Integration & Verification Adam MacLeod AIV Consortium Manager & ASKAP System Engineer.
Sponsored by the National Science Foundation 1 March 15, 2011 GENI I&M Update: Sharing MD Objects with Researchers, MDA Service Goals Architecture Overview.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
OSLC PLM Workgroup1 Towards detailed use cases and alignment to OSLC V0.1 Gray Bachelor 18 th July 2011.
MWA imaging and calibration – early science results
CIS 375 Bruce R. Maxim UM-Dearborn
SCT Project Management Issues
Software Engineering Management
4.4 Monitor and Control Project Work
I&T&C Organization Chart
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
SNS Status Report Karen S. White 10/15/08.
JWST Pipeline Overview
Computing Architecture
IEEE Std 1074: Standard for Software Lifecycle
Active Data Management in Space 20m DG
Data Taking Plans for 32T and 128T
Maintaining software solutions
DSQR Training Control Plans
Correlator – Backend System Overview
Bryan Butler (for Bill Sahr)
EVLA Advisory Committee Meeting
Gustaaf van Moorsel September 9, 2003
Mark McKinnon EVLA Project Manager
Observing with Modern Observatories (the data flow)
EVLA Advisory Committee Meeting, March 19-20, 2009
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Overall Project RAG Status:
The Software Development Process
Integration & Test Instrument Operations Coordination
Presentation transcript:

Archive, Data Products, & Operations for the Murchison Widefield Array Ron Remillard (MIT); MWA Project Meeting, June 6, 2011

Outline Resources for the MWA Archive at MIT Standard Data Products NSF MRI Program Standard Data Products Incomplete definitions in early 2011 Strategy for progress Information Flow Diagram Commissioning Phase Needs for Commissioning Plan Needs for more sophisticated Monitoring Operations Phase Operations Plan and Needs for Update Plans for remainder of 2011

MWA Archive at MIT NSF MRI Program ($868 K: NSF + MIT contribution) Large equipment budget Advanced spending on archive requirements, data products Need to set aside majority of funds until late 2012 Archive Tasks (based on EoR, systematic error analyses, student projects) Capture raw data (in short bursts) Intermediate data capture (non-calibrated images; less resolution (n, t)) High timer resolution calibrated data Determine calibrations in parallel with RTS Calibrate data offline Study ionosphere parameters at 2 s Service MWA EoR Consortium, other EoR users, other outside projects

MWA Archive at MIT Gaps in Plan Redefine SOW for 128T (retain EoR focus; gain approval for NSF extensions) Complete Archive Requirements Document (project-wide scope) Method to obtain data from Curtin Method to provide data access for Users

Standard Data Products Science Data Eor Data Products (calibrated raw images) defined in MRI proposal SHI Needs raw data (pro-Correlator) and UV data from outlier tiles Transients & GEG groups need Images and other modes (light curves, transient searches (image diffs), wider images (low t res.), others?) “Meta Data” RTS {calibrator catalogs, calibrator solutions, ionospheric params., “peeled” sources} M&C {configuration parameters, hardware status, housekeeping data} Common RTS/M&C Database

Standard Data Products EOR Data Writing Requirements for 512T Images: HEALPix files, instrumental images (from back end of RTS): 25o radius ; 4 polarizations; 768 channels UV data samples: (from front end of RTS): visibilities for 100[TBR] Tile pairs  Foundation for MWA Calibrations and Data Processing High-Quality Calibrations and Supression of Systematic Errors Calibrator gain measurements; Ionosphere refraction data; Faraday rotation; beam fit parameters EOR Data Products are Basis for 3 Other Science Packages Imaging mode with variable {time, frequency-binning; spatial selection} for Transients Imaging (TLA mode) and GEG Imaging SHI: UV Data Samples + IPC Mode to be written Directly from Correlator Stand-alone processing for Transients discovery (Transient ASM mode) and other data products (e.g., flux-calibrated images; light curves)

MWA Information Processing of EOR Data M&C Housekeeping Configuration Receivers Command Writing mode Digitized Data RTS/RTC Calibration Subtract Calibrated Staging & Solutions Bri. Sources Images Processing Correlator UV Data (40 Gbs) MWA Data Archive (Perth) Catalogs: Calibration Sources Sources Subtracted Raw Data: UV Data [~100 tiles] Science Data: EOR Images Secondary processing Calibration Data: Beam Parameters Ionosphere Params. Flux Images Light Curves (study systematics) M&C MetaData: Configurations Housekeeping Additional MWA Archives (MIT, Melbourne)

MWA Information Processing and Data Products M&C Housekeeping Configuration Receivers Command Writing mode Digitized Data RTS/RTC Calibration Subtract Calibrated Staging & Solutions Bri. Sources Images Processing Correlator UV Data (40 Gbs) MWA Data Archive (Perth) Catalogs: Calibration Sources Sources Subtracted Raw Data: SHI: IPS Data [512] UV Data [~100] (for SHI & EOR) Science Data: EOR Images TLA Images GEG Images Secondary processing Calibration Data: Beam Parameters Ionosphere Params. Flux Images Light Curves Transient ASM Data M&C MetaData: Configurations Housekeeping Additional MWA Archives (MIT, Melbourne)

Archive & Standard Data Products for 128T Save Correlator output (larger Archive)? Built-in Capacity for UV Data analyses, Iterative Calibrations, Comparative Tests, Specialized Tests, Secondary Data Products, etc. Standard Data Products: No Significant Changes  Next efforts: Finalize design and track development of standard data products

Commissioning Phase (Checkout to Verification) Requirements & Verification Document Colin & RR first draft March 2011 Needs Adaptations for 128T Needs Attention and Inputs from Judd, Frank, etc. Gaps and Risk Verification Details are complicated; plans incomplete Insufficient strategy for automation and scripts Upgrade Plan for Monitoring Functions Status screens for hardware & housekeeping data for Installation/Checkout Well-defined metrics and useful error logs Take next step to rudimentary Interferometry monitoring Add smart scripts to monitor for Intermittent problems Examine all data Who? (Curtin Archive & Superscience help? ; MIT student project?)

Operations Phase Operations Management Plan Gaps and Risk Last update: Nov 2010 (Wayne Arcus) Operations succeeds end of Commissioning phase Engineering component – Dave Emrich (Commissioning Engineer) Science Performance Verification – Judd Bowman (Project Scientist) Initial Operations Manager – Tom Booler (Deputy Project Manager for Australia) Assumptions: move toward 24/7 operations ; proposals ; review ; schedule ; observe ; trend analyses ; archive verification ; TBD user support Gaps and Risk Currently No Operations funds Details for Proposals, Target Selection, Scheduling Plans during remainder of 2011 Revise Plan after work on: schedule, cost, monitoring, automation, data products, commissioning plan